Revised November 2008<br />

23. Four Corners 345/500 Qualified<br />

<strong>Path</strong><br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Northeastern Arizona<br />

Definition: Flow on 345/500 kV transformer (see Fig. 1)<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

345 to 500 kV: 1000 MW<br />

500 to 345 kV: 1000 MW<br />

Metered End: 345 KV terminal of transformer<br />

Loss of Four Corners #5 (750 MVA) with high transfers on Four Corners-<br />

Moenkopi 500 kV for westbound flows.<br />

<strong>Path</strong> is normally limited due to N-0 conditions in both directions.<br />

The new path rating was established in 2012 as described in the report Four<br />

Corners 525/345 kV Transformer (<strong>Path</strong> 23) Upgrade Project performed by<br />

APS and the Four Corners Technical task force.<br />

Flows in this area are historically from east to west due to the large amount of<br />

generation located in the area.<br />

<strong>Path</strong> loading not to exceed 100% of continuous rating (1025 MVA) of the<br />

transformer.<br />

None.<br />

None<br />

Owners of the path are:<br />

Southern California Edison Company<br />

Arizona Public Service Company<br />

Public Service Company of New Mexico<br />

Salt River Project<br />

El Paso Electric Company<br />

Tucson Electric Power Company<br />

None<br />

480 MW<br />

150 MW<br />

130 MW<br />

100 MW<br />

70 MW<br />

70 MW<br />

1000 MW<br />

PART VI Item 1-64