Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
15. Midway - Los Banos<br />
Revised January 2011<br />
Accepted <strong>Rating</strong><br />
Existing <strong>Rating</strong><br />
Other<br />
Location:<br />
Definition:<br />
Transfer Limit:<br />
Critical<br />
Disturbance<br />
that limits the<br />
transfer<br />
capability:<br />
Between central and southern California within the PG&E system and south<br />
of Los Banos substation (PG&E internal <strong>Path</strong> 15).<br />
Measured at Los Banos for all 500 kV lines and at Gates for all 230 kV lines<br />
for both north-to-south and south-to-north flows:<br />
Midway-Los Banos 500 kV line (at Los Banos)<br />
Gates-Los Banos # 1 and #3 500 kV lines (at Los Banos)<br />
Gates-Panoche #1 & #2 230 kV lines (at Gates)<br />
Gates-Gregg 230 kV line (at Gates)<br />
Gates-McCall 230 kV line (at Gates)<br />
The transfer limit ranges from 2000-3265 MW from north to south.<br />
The transfer limit ranges from 4800-5400 MW from south to north.<br />
From north to south:<br />
Midway-Gates and Midway-Los Banos 500 kV double line outage.<br />
Double Palo Verde unit outage.<br />
Los Banos-Tesla and Los Banos-Tracy 500 kV double line outage.<br />
From south to north:<br />
Double line 500 kV outages between Tesla and Midway.<br />
When: The 3265 MW north-to-south rating was established in the August 5, 2002<br />
<strong>Path</strong> 15 Upgrade north-to-south Project Comprehensive Progress Report.<br />
Phase III Status granted on October 23, 2003.<br />
The 5400 MW south-to-north rating was established in the September 18,<br />
2001 <strong>Path</strong> 15 Upgrade Project Comprehensive Progress Report. A letter<br />
from the PCC chair indicating the Phase II report was accepted and granting<br />
Phase III status was distributed on February 5, 2003.<br />
System<br />
Conditions:<br />
Study Criteria:<br />
Remedial<br />
Actions<br />
Required:<br />
Formal<br />
Operating<br />
Procedure:<br />
Allocation:<br />
Interaction<br />
w/Other<br />
Transfer <strong>Path</strong>s:<br />
The north-to-south path rating was based on north-to-south transfers under<br />
heavy summer (high temperature) operating conditions.<br />
The south-to-north path rating was based on south-to-north transfers under<br />
light winter operating conditions.<br />
NERC/WECC Planning Standards.<br />
Remedial actions are employed on an as needed basis for double line<br />
outages between Tesla and Midway.<br />
CISO T-122 and PG&E O-51 operating procedures which are periodically<br />
updated.<br />
PG&E, SCE, SDGE, CDWR, and various new owners.<br />
For high north-to-south flows on <strong>Path</strong> 15 and high north-to-south flows on<br />
COI and/or PDCI it is necessary to operate based on a nomogram.<br />
<strong>Path</strong> 15 north-to-south transfer limit can be significantly less with high<br />
generation levels in the Midway area because of <strong>Path</strong> 26 limitations.<br />
For high south-to-north flows on <strong>Path</strong> 15 and high east-to-west flows on<br />
West of Borah it is necessary to operate based on a nomogram.<br />
PART VI Item 1-40