Added February 2010<br />

II-6. Southwest Intertie Project -<br />

South<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

Northern Nevada to Southern Nevada<br />

Flow on Robinson Summit to Eldorado 500 kV Line, metered at Robinson<br />

Summit<br />

2000 MW north to south; 2000 MW south to north (The south to north rating<br />

is dependent upon the addition of SWIP – North.)<br />

TBD during Phase 2 of the Project <strong>Rating</strong> Review Process<br />

When: N/A: Still in Phase 2<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

Studies are being performed using a heavy summer base case for north to<br />

south flows and light winter base case for south to north flows. The south to<br />

north studies will model the SWIP – North project.<br />

The NERC Standards and the WECC System Performance Criteria<br />

TBD during Phase 2 of the Project <strong>Rating</strong> Review Process<br />

TBD during Phase 2 or Phase 3 of the Project <strong>Rating</strong> Review Process<br />

TBD<br />

Potential interactions with WECC <strong>Path</strong>s 27, 32, 35, 46, 49, 78, 79, and 81 will<br />

be tested during the Phase 2 study process.<br />

Evan Estes<br />

Great Basin Transmission, LLC<br />

Phone: (636) 532-2200<br />

EEstes@LSPower.com<br />

PART VI Item 1-266