12.11.2014 Views

Path Rating Catalog 2013 - Western Electricity Coordinating Council

Path Rating Catalog 2013 - Western Electricity Coordinating Council

Path Rating Catalog 2013 - Western Electricity Coordinating Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Remedial actions are required to achieve the rated transfer capability.<br />

Following an outage, all overloaded lines and transformers must have their<br />

loadings reduced to continuous ratings within 15 minutes. This is<br />

accomplished by reducing schedules and adjusting generation.<br />

The current operating procedures will require updating to reflect the new path<br />

ratings. <strong>Western</strong> Area Power Administration (WAPA) is the path operator for<br />

TOT3.<br />

The transfer capability of the path is divided between WAPA, Missouri<br />

Basin Power Project (MBPP), Public Service Company of Colorado (PSC),<br />

and Tri-State Generation and Transmission (TSGT). TSGT and BEPC are<br />

members of MBPP.<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

None<br />

David Gustad<br />

Tri-State G & T<br />

P.O. Box 33695<br />

Denver, CO 80233<br />

(303) 254-3449<br />

(303) 254-3566 fax<br />

dgustad@tristategt.org<br />

PART VI Item 1-255

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!