Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council Path Rating Catalog 2013 - Western Electricity Coordinating Council
Contact Person: Mark D. Hanson Tracy Rolstad Idaho Power Company Avista Corp. 1221 W. Idaho 1411 East Mission P. O. Box 70 P. O. Box 3727 Boise, ID 83707-0070 Spokane, WA. 99220-3727 (208) 388-2253 (509) 495-4538 (208) 388-6647 - fax (509)-495-8542 - fax mhanson@idahopower.com tracy.rolstad@avistacorp.com January 2013 Larry Frick Berhanu Tesema (TPP-OPP-3) PacifiCorp, Transmission Planning Bonneville Power Administration Lloyd Center Room 1800 7600 NE 41 st Street, Suite 340 825 NE Multnomah P.O. Box 61409 Portland, OR 97232 Vancouver, WA 98666-1409 (503) 813-6236 (360) 619-6819 (503) 813-6508 - fax (360) 619-6589 - fax Larry.Frick@Pacificorp.com bktesema@bpa.gov PART VI Item 1-252
Revised January 2013 III-17. TOT3 Archer Interconnection Project PART VI Item 1-253
- Page 211 and 212: 80. Montana Southeast Revised Janua
- Page 213 and 214: 81. Centennial Revised November 200
- Page 215 and 216: 82. TotBeast Revised January 2013 P
- Page 217 and 218: Revised January 2013 Formal Operati
- Page 219 and 220: III-1. Devers-Palo Verde #2 Path 49
- Page 221 and 222: Revised November 2007 System Condit
- Page 223 and 224: Revised November 2007 III-2. Palo V
- Page 225 and 226: Updated November 2007 III-3. Montan
- Page 227 and 228: simultaneous analysis, only heavy s
- Page 229 and 230: III-4. Path C (Post Gateway) Revise
- Page 231 and 232: Revised January 2011 Interaction w/
- Page 233 and 234: III-5. Aeolus South Project Added J
- Page 235 and 236: Added January 2013 III-6. Aeolus We
- Page 237 and 238: Added January 2013 III-7. Bridger/A
- Page 239 and 240: III-9. TOT 4A (Pre-Gateway) Revised
- Page 241 and 242: Contact Person: Craig Quist PacifiC
- Page 243 and 244: Added January 2013 III-10. TOT 4A (
- Page 245 and 246: III-11. TOT 4B (Pre-Gateway) Revise
- Page 247 and 248: Operating operating agent and uses
- Page 249 and 250: III-12. SunZia Southwest Transmissi
- Page 251 and 252: Contact Person Mark L. Etherton, P.
- Page 253 and 254: Revised January 2013 Formal Operati
- Page 255 and 256: Revised January 2013 Allocation: In
- Page 257 and 258: January 2013 III-15. TotBeast with
- Page 259 and 260: January 2013 III-16. Idaho to North
- Page 261: January 2013 Study Criteria: Remedi
- Page 265 and 266: Remedial Actions Required: Formal O
- Page 267 and 268: Phase II Projects PART VI Item 1-25
- Page 269 and 270: Revised December 2010 II-1. Navajo
- Page 271 and 272: Added January 2010 II-3. TransWest
- Page 273 and 274: II-5. Path 45 Uprate Project Revise
- Page 275 and 276: Contact Person: Ing. Jesús Moya Je
- Page 277 and 278: Added February 2010 II-6. Southwest
- Page 279 and 280: Intertie, Normally Close) Interacti
- Page 281 and 282: II-8. IID - SCE March 2013 Accepted
- Page 283: II-9. IID - SCE March 2013 Accepted
Revised January <strong>2013</strong><br />
III-17. TOT3 Archer Interconnection<br />
Project<br />
PART VI Item 1-253