January <strong>2013</strong><br />

III-16. Idaho to Northwest with<br />

Hemingway-Boardman 500 kV<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location: Southwest Idaho and Eastern Oregon/Washington and Northern Idaho<br />

Definition: Sum of the flows on the following lines:<br />

Line:<br />

Metered End<br />

Hemingway-Boardman 500 kV<br />

Boardman<br />

Hemingway-Summer Lake 500 kV Hemingway<br />

Imnaha-Lolo 230 kV<br />

Imnaha<br />

Hells Canyon-Hurricane 230 kV<br />

Hurricane<br />

North Powder-LaGrande 230 kV<br />

LaGrande<br />

Hines-Harney 115 kV<br />

Harney<br />

Transfer Limit: West-to-East: 2250 MW<br />

East-to-West:<br />

3400 MW (with Gateway West Project)<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

West-to-East: Thermal overloads on the Imnaha-Lolo section of the Oxbow-<br />

Lolo 230 kV line and/or the Hells Canyon-Brownlee 230 kV line for the loss<br />

of the Hemingway-Boardman 500 kV line.<br />

East-to-West: Thermal overload on the Burns 500 kV series capacitor in the<br />

Hemingway-Summer Lake 500 kV line for the loss of the Hemingway-<br />

Boardman 500 kV line.<br />

When:<br />

The Hemingway-Boardman (B2H) Transmission Project’s plan of service is<br />

to construct a 300 mile 500 kV transmission line from Hemingway station in<br />

southwestern Idaho to the Boardman Power Plant in northeastern Oregon.<br />

The Hemingway-Boardman Transmission Project projected in-service date is<br />

no earlier than 2018.<br />

A Hemingway-Boardman Transmission Project Comprehensive Progress<br />

Report (Phase I) was released for comment in November 2008 and Phase II<br />

status was granted in March 2009. In August 2012, Idaho Power submitted<br />

the Idaho-Northwest Up-rate, Hemingway-Boardman 500 kV Transmission<br />

Project Phase II Report to WECC and was granted Phase 3 status on<br />

November 29, 2012 with an Accepted <strong>Rating</strong> of 2250 MW west-to-east and<br />

3400 MW east-to-west.<br />

System<br />

Conditions:<br />

The 2250 MW west-to-east (import) transfer rating with the Hemingway-<br />

Boardman 500 kV project was studied with high hydro conditions in the<br />

Northwest with low to moderate eastern thermal resources.<br />

The 3400 MW east-to-west (export) transfer rating with the Hemingway-<br />

Boardman 500 kV project was studied with light load conditions in Idaho<br />

with heavy eastern thermal resources, and moderate generation on the<br />

remaining hydro plants in Idaho. East-to-west studies were performed with<br />

and without the Gateway West project.<br />