Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council Path Rating Catalog 2013 - Western Electricity Coordinating Council
January 2013 Formal Operating Procedure: Allocation: Interaction w/Other Transfer Paths: Contact Person: None. None. Mark D. Hanson Idaho Power Company 1221 W. Idaho P. O. Box 70 Boise, ID 83707-0070 (208) 388-2253 (208) 388-6647 - fax mhanson@idahopower.com Larry Frick PacifiCorp, Transmission Planning Lloyd Center Room 1800 825 NE Multnomah Portland, OR 97232 (503) 813-6236 (503) 813-6508 - fax Larry.Frick@Pacificorp.com PART VI Item 1-248
January 2013 III-16. Idaho to Northwest with Hemingway-Boardman 500 kV PART VI Item 1-249
- Page 207 and 208: 78. TOT 2B1 Revised January 2013 Ac
- Page 209 and 210: 79. TOT 2B2 Revised January 2013 Ac
- Page 211 and 212: 80. Montana Southeast Revised Janua
- Page 213 and 214: 81. Centennial Revised November 200
- Page 215 and 216: 82. TotBeast Revised January 2013 P
- Page 217 and 218: Revised January 2013 Formal Operati
- Page 219 and 220: III-1. Devers-Palo Verde #2 Path 49
- Page 221 and 222: Revised November 2007 System Condit
- Page 223 and 224: Revised November 2007 III-2. Palo V
- Page 225 and 226: Updated November 2007 III-3. Montan
- Page 227 and 228: simultaneous analysis, only heavy s
- Page 229 and 230: III-4. Path C (Post Gateway) Revise
- Page 231 and 232: Revised January 2011 Interaction w/
- Page 233 and 234: III-5. Aeolus South Project Added J
- Page 235 and 236: Added January 2013 III-6. Aeolus We
- Page 237 and 238: Added January 2013 III-7. Bridger/A
- Page 239 and 240: III-9. TOT 4A (Pre-Gateway) Revised
- Page 241 and 242: Contact Person: Craig Quist PacifiC
- Page 243 and 244: Added January 2013 III-10. TOT 4A (
- Page 245 and 246: III-11. TOT 4B (Pre-Gateway) Revise
- Page 247 and 248: Operating operating agent and uses
- Page 249 and 250: III-12. SunZia Southwest Transmissi
- Page 251 and 252: Contact Person Mark L. Etherton, P.
- Page 253 and 254: Revised January 2013 Formal Operati
- Page 255 and 256: Revised January 2013 Allocation: In
- Page 257: January 2013 III-15. TotBeast with
- Page 261 and 262: January 2013 Study Criteria: Remedi
- Page 263 and 264: Revised January 2013 III-17. TOT3 A
- Page 265 and 266: Remedial Actions Required: Formal O
- Page 267 and 268: Phase II Projects PART VI Item 1-25
- Page 269 and 270: Revised December 2010 II-1. Navajo
- Page 271 and 272: Added January 2010 II-3. TransWest
- Page 273 and 274: II-5. Path 45 Uprate Project Revise
- Page 275 and 276: Contact Person: Ing. Jesús Moya Je
- Page 277 and 278: Added February 2010 II-6. Southwest
- Page 279 and 280: Intertie, Normally Close) Interacti
- Page 281 and 282: II-8. IID - SCE March 2013 Accepted
- Page 283: II-9. IID - SCE March 2013 Accepted
January <strong>2013</strong><br />
III-16. Idaho to Northwest with<br />
Hemingway-Boardman 500 kV<br />
PART VI Item 1-249