III–12. SunZia Southwest<br />

Transmission Project<br />

Revised December 2011<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

Two new 500kV transmission lines between central New Mexico and central<br />

Arizona.<br />

Included lines: First two 500 kV lines from SunZia E to SunZia S (70% series<br />

compensated), second two 500 kV lines from SunZia S to Willow (50%<br />

series compensated) and last two 500 kV lines from Willow to Pinal_C (50%<br />

series compensated).<br />

Metered End: SunZia E end of the transmission system<br />

East to West: 3,000 MW (non-simultaneous).<br />

West to East: Not rated.<br />

East to West:<br />

Loss of one of the two SunZia E to SunZia S 500 kV lines loads the<br />

remaining SunZia E to SunZia S 500 kV line to its emergency rating.<br />

By letter dated March 25, 2011, SunZia Southwest Transmission <strong>Path</strong> <strong>Rating</strong><br />

was granted Phase III status by the PCC Chair.<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Both WECC <strong>2013</strong> heavy winter and heavy summer cases were used as a base.<br />

East to West case: 3000 MW non-simultaneous transfer in both cases.<br />

NERC/WECC Reliability Criteria for Transmission System Planning<br />

RAS of tripping generation located at SunZia E is required in the event of loss<br />

of both SunZia E – SunZia S 500 kV lines.<br />

A formal operating procedure will be developed prior to project energization.<br />

Exact allocation capacity has yet to be determined.<br />

There are some possible simultaneous interactions with <strong>Path</strong> 50 and <strong>Path</strong> 54.<br />

The conceptual simultaneous operating nomogram limits have been<br />

determined.<br />