III-11. TOT 4B (Pre-Gateway) Location: Definition: Transfer Limit: Critical Disturbance that limits the transfer capability: Added January 2013 Accepted Rating Existing Rating Northwest Wyoming Sum of the flows on the following transmission lines: Line Metered End CarrDraw-Buffalo 230 kV CarrDraw Sheridan-Tongue River 230 kV Sheridan Spence-Thermopolis 230 kV Spence Alcova-Raderville 115 kV Alcova Casper-Midwest 230 kV Casper Riverton-Thermopolis 230 kV Riverton Riverton-230/115 kV transformers Riverton 230 kV Other Subtract PreCorp load at Sheridan Southeast to Northwest: 829 MW (Non-simultaneous) Northwest to Southeast: Not defined Depending on flows on the adjacent TOT 4A path, the real-time rating can range between a minimum of 0 MW and a maximum of 829 MW (Reference attachment). Typically, the real-time rating centers around 475 MW. The critical disturbances and limiting elements vary with the various points on the nomogram. Reference attachment for further information. When: Rating Study Approved on 10/8/2010 System Conditions: Study Criteria: Remedial Actions Required: Formal This rating is independent of transfer levels between major areas of WECC. Historically, the flows have all been southeast to northwest across the path. (Summary) System intact: • Per unit voltages between 0.95 p.u. and 1.05 p.u. • All lines and transformers loaded to less than continuous rating. Single contingency outage conditions: • Per unit voltages between 0.90 p.u. and 1.10 p.u. • All facilities loaded to less than 100% of emergency ratings. Remedial actions are required to achieve the rated transfer capability. Following an outage, all overloaded lines and transformers must have their loading reduced to continuous ratings within 15 minutes. This is accomplished by reducing schedules or lowering local generation. There is a formal operating proceduredated 4/12/1991. PAC is the PART VI Item 1-236
Operating operating agent and uses real-time flows to monitor the path. Procedure: Allocation: PAC and WAPA share the transfer capability of the path. Interaction See attachment w/Other Transfer Paths: Contact Person: Craig Quist PacifiCorp 1407 W. North Temple - Suite 275 Salt Lake City, UT 84140 (801) 220-4264 (801) 220-2842 - fax craig.quist@pacificorp.com WYOMING SYSTEM OPERATING CURVE (2012 Winter Nomogram) SYSTEM NORMAL (2009 STUDIES) SYSTEM NORMAL POWERFLOW TOT FLOWS (MW) LIMITING OUTAGE LIMITING CONDITION CASE 4A 4B LINE KV BUS/LINE KV LIMIT Estimated 09LW- 87 829 YELLOWTAIL- 230 OREGON BASIN 0.9 C5E1L(11,12) SHERIDAN 230 KV 09LW- 301 829 GRASS CREEK- 230 GRASS CREEK 0.9 C5C4l(9,10) THERMOPOLIS 230 KV 09LW- 401 809 GRASS CREEK- 230 GRASS CREEK 0.9 C5A1A(9,10) 09LW- C5(H2C9,G2B9) THERMOPOLIS 639 746 MINERS- PLATTE 230 KV 230 BADWATER 230 KV PART VI Item 1-237 0.9
- Page 195 and 196: 73. North of John Day Revised Decem
- Page 197 and 198: 74. Deleted February 1999 INTENTION
- Page 199 and 200: Revised January 2013 75. Hemingway
- Page 201 and 202: 76. Alturas Project Revised Februar
- Page 203 and 204: Revised February 2002 Contact Perso
- Page 205 and 206: 77. Crystal - Harry Allen Revised N
- Page 207 and 208: 78. TOT 2B1 Revised January 2013 Ac
- Page 209 and 210: 79. TOT 2B2 Revised January 2013 Ac
- Page 211 and 212: 80. Montana Southeast Revised Janua
- Page 213 and 214: 81. Centennial Revised November 200
- Page 215 and 216: 82. TotBeast Revised January 2013 P
- Page 217 and 218: Revised January 2013 Formal Operati
- Page 219 and 220: III-1. Devers-Palo Verde #2 Path 49
- Page 221 and 222: Revised November 2007 System Condit
- Page 223 and 224: Revised November 2007 III-2. Palo V
- Page 225 and 226: Updated November 2007 III-3. Montan
- Page 227 and 228: simultaneous analysis, only heavy s
- Page 229 and 230: III-4. Path C (Post Gateway) Revise
- Page 231 and 232: Revised January 2011 Interaction w/
- Page 233 and 234: III-5. Aeolus South Project Added J
- Page 235 and 236: Added January 2013 III-6. Aeolus We
- Page 237 and 238: Added January 2013 III-7. Bridger/A
- Page 239 and 240: III-9. TOT 4A (Pre-Gateway) Revised
- Page 241 and 242: Contact Person: Craig Quist PacifiC
- Page 243 and 244: Added January 2013 III-10. TOT 4A (
- Page 245: III-11. TOT 4B (Pre-Gateway) Revise
- Page 249 and 250: III-12. SunZia Southwest Transmissi
- Page 251 and 252: Contact Person Mark L. Etherton, P.
- Page 253 and 254: Revised January 2013 Formal Operati
- Page 255 and 256: Revised January 2013 Allocation: In
- Page 257 and 258: January 2013 III-15. TotBeast with
- Page 259 and 260: January 2013 III-16. Idaho to North
- Page 261 and 262: January 2013 Study Criteria: Remedi
- Page 263 and 264: Revised January 2013 III-17. TOT3 A
- Page 265 and 266: Remedial Actions Required: Formal O
- Page 267 and 268: Phase II Projects PART VI Item 1-25
- Page 269 and 270: Revised December 2010 II-1. Navajo
- Page 271 and 272: Added January 2010 II-3. TransWest
- Page 273 and 274: II-5. Path 45 Uprate Project Revise
- Page 275 and 276: Contact Person: Ing. Jesús Moya Je
- Page 277 and 278: Added February 2010 II-6. Southwest
- Page 279 and 280: Intertie, Normally Close) Interacti
- Page 281 and 282: II-8. IID - SCE March 2013 Accepted
- Page 283: II-9. IID - SCE March 2013 Accepted
Operating operating agent and uses real-time flows to monitor the path.<br />
Procedure:<br />
Allocation: PAC and WAPA share the transfer capability of the path.<br />
Interaction See attachment<br />
w/Other<br />
Transfer <strong>Path</strong>s:<br />
Contact Person: Craig Quist<br />
PacifiCorp<br />
1407 W. North Temple - Suite 275<br />
Salt Lake City, UT 84140<br />
(801) 220-4264<br />
(801) 220-2842 - fax<br />
craig.quist@pacificorp.com<br />
WYOMING SYSTEM OPERATING CURVE (2012 Winter Nomogram)<br />
SYSTEM NORMAL<br />
(2009 STUDIES)<br />
SYSTEM NORMAL<br />
POWERFLOW TOT FLOWS (MW) LIMITING OUTAGE LIMITING CONDITION<br />
CASE 4A 4B LINE KV BUS/LINE KV LIMIT<br />
Estimated<br />
09LW-<br />
87 829 YELLOWTAIL- 230 OREGON BASIN 0.9<br />
C5E1L(11,12)<br />
SHERIDAN<br />
230 KV<br />
09LW-<br />
301 829 GRASS CREEK- 230 GRASS CREEK 0.9<br />
C5C4l(9,10)<br />
THERMOPOLIS<br />
230 KV<br />
09LW-<br />
401 809 GRASS CREEK- 230 GRASS CREEK 0.9<br />
C5A1A(9,10)<br />
09LW-<br />
C5(H2C9,G2B9)<br />
THERMOPOLIS<br />
639 746 MINERS-<br />
PLATTE<br />
230 KV<br />
230 BADWATER 230<br />
KV<br />
PART VI Item 1-237<br />
0.9