Added January <strong>2013</strong><br />

III-10. TOT 4A (Post-Gateway)<br />

Location:<br />

Definition:<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Southwest Wyoming<br />

Sum of the flows on the following transmission lines:<br />

Line<br />

Metered End<br />

Riverton-Wyopo 230 kV<br />

Riverton<br />

Spence-Mustang 230 kV<br />

Spence<br />

Windstar-Aeolus 230 kV #1<br />

Windstar<br />

Windstar-Aeolus 230 kV #2<br />

Windstar<br />

Dave Johnston-Aeolus 230 kV Dave Johnston<br />

Other<br />

Transfer Limit: Northeast to Southwest: 2175 MW<br />

Critical The outage of the proposed Aeolus-Anticline 500 kV line.<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When: Technical Studies accepted 12/13/2010<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

This rating is independent of transfer levels between major areas of<br />

WECC. Historically, the flows have all been northeast to southwest across<br />

the path.<br />

(Summary)<br />

System intact:<br />

• Per unit voltages between 0.95 p.u. and 1.05 p.u.<br />

• All lines and transformers loaded to less than continuous rating.<br />

Single contingency outage conditions:<br />

• Per unit voltages between 0.90 p.u. and 1.10 p.u.<br />

• All facilities loaded to less than 100% of emergency ratings.<br />

Remedial actions are required to achieve the rated transfer capacity.<br />

For certain N-1 & N-2 outages the Dave Johnston 230/115 kV transformer<br />

needs to be tripped.RAS schemes applicable to the West and South of<br />

Aeolus <strong>Path</strong> ratings.<br />

TBD<br />

PAC has the entire transfer capability of the path.<br />

None<br />