Revised January 2013 III-10. TOT 4A (Post-Gateway) PART VI Item 1-232
Added January 2013 III-10. TOT 4A (Post-Gateway) Location: Definition: Accepted Rating Existing Rating Southwest Wyoming Sum of the flows on the following transmission lines: Line Metered End Riverton-Wyopo 230 kV Riverton Spence-Mustang 230 kV Spence Windstar-Aeolus 230 kV #1 Windstar Windstar-Aeolus 230 kV #2 Windstar Dave Johnston-Aeolus 230 kV Dave Johnston Other Transfer Limit: Northeast to Southwest: 2175 MW Critical The outage of the proposed Aeolus-Anticline 500 kV line. Disturbance that limits the transfer capability: When: Technical Studies accepted 12/13/2010 System Conditions: Study Criteria: Remedial Actions Required: Formal Operating Procedure: Allocation: Interaction w/Other Transfer Paths: This rating is independent of transfer levels between major areas of WECC. Historically, the flows have all been northeast to southwest across the path. (Summary) System intact: • Per unit voltages between 0.95 p.u. and 1.05 p.u. • All lines and transformers loaded to less than continuous rating. Single contingency outage conditions: • Per unit voltages between 0.90 p.u. and 1.10 p.u. • All facilities loaded to less than 100% of emergency ratings. Remedial actions are required to achieve the rated transfer capacity. For certain N-1 & N-2 outages the Dave Johnston 230/115 kV transformer needs to be tripped.RAS schemes applicable to the West and South of Aeolus Path ratings. TBD PAC has the entire transfer capability of the path. None PART VI Item 1-233
- Page 191 and 192: 71. South of Allston Revised Januar
- Page 193 and 194: 72. Deleted February 1999 INTENTION
- Page 195 and 196: 73. North of John Day Revised Decem
- Page 197 and 198: 74. Deleted February 1999 INTENTION
- Page 199 and 200: Revised January 2013 75. Hemingway
- Page 201 and 202: 76. Alturas Project Revised Februar
- Page 203 and 204: Revised February 2002 Contact Perso
- Page 205 and 206: 77. Crystal - Harry Allen Revised N
- Page 207 and 208: 78. TOT 2B1 Revised January 2013 Ac
- Page 209 and 210: 79. TOT 2B2 Revised January 2013 Ac
- Page 211 and 212: 80. Montana Southeast Revised Janua
- Page 213 and 214: 81. Centennial Revised November 200
- Page 215 and 216: 82. TotBeast Revised January 2013 P
- Page 217 and 218: Revised January 2013 Formal Operati
- Page 219 and 220: III-1. Devers-Palo Verde #2 Path 49
- Page 221 and 222: Revised November 2007 System Condit
- Page 223 and 224: Revised November 2007 III-2. Palo V
- Page 225 and 226: Updated November 2007 III-3. Montan
- Page 227 and 228: simultaneous analysis, only heavy s
- Page 229 and 230: III-4. Path C (Post Gateway) Revise
- Page 231 and 232: Revised January 2011 Interaction w/
- Page 233 and 234: III-5. Aeolus South Project Added J
- Page 235 and 236: Added January 2013 III-6. Aeolus We
- Page 237 and 238: Added January 2013 III-7. Bridger/A
- Page 239 and 240: III-9. TOT 4A (Pre-Gateway) Revised
- Page 241: Contact Person: Craig Quist PacifiC
- Page 245 and 246: III-11. TOT 4B (Pre-Gateway) Revise
- Page 247 and 248: Operating operating agent and uses
- Page 249 and 250: III-12. SunZia Southwest Transmissi
- Page 251 and 252: Contact Person Mark L. Etherton, P.
- Page 253 and 254: Revised January 2013 Formal Operati
- Page 255 and 256: Revised January 2013 Allocation: In
- Page 257 and 258: January 2013 III-15. TotBeast with
- Page 259 and 260: January 2013 III-16. Idaho to North
- Page 261 and 262: January 2013 Study Criteria: Remedi
- Page 263 and 264: Revised January 2013 III-17. TOT3 A
- Page 265 and 266: Remedial Actions Required: Formal O
- Page 267 and 268: Phase II Projects PART VI Item 1-25
- Page 269 and 270: Revised December 2010 II-1. Navajo
- Page 271 and 272: Added January 2010 II-3. TransWest
- Page 273 and 274: II-5. Path 45 Uprate Project Revise
- Page 275 and 276: Contact Person: Ing. Jesús Moya Je
- Page 277 and 278: Added February 2010 II-6. Southwest
- Page 279 and 280: Intertie, Normally Close) Interacti
- Page 281 and 282: II-8. IID - SCE March 2013 Accepted
- Page 283: II-9. IID - SCE March 2013 Accepted
Revised January <strong>2013</strong><br />
III-10. TOT 4A (Post-Gateway)<br />
PART VI Item 1-232