III-9. TOT 4A (Pre-Gateway)<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

Added January <strong>2013</strong><br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Southwest Wyoming<br />

Sum of the flows on the following transmission lines:<br />

Line<br />

Metered End<br />

Riverton-Wyopo 230 kV<br />

Riverton<br />

Miners-Platte 230 kV<br />

Miners<br />

Spence-Mustang 230 kV<br />

Spence<br />

Northeast to Southwest: 937 MW (Non-simultaneous)<br />

Southwest to Northeast: Not defined<br />

Depending on flows on the adjacent TOT 4B path, the real-time rating can<br />

range between a minimum of 0 MW and a maximum of 937 MW<br />

(Reference attachment). Typically, the real-time rating centers around 650<br />

MW.<br />

The critical disturbances and limiting elements vary with the various<br />

points on the nomogram. Reference attachment for further information.<br />

When: <strong>Rating</strong> Study Approved on 10/8/2010<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

This rating is independent of transfer levels between major areas of<br />

WECC. Historically, the flows have all been northeast to southwest across<br />

the path.<br />

(Summary)<br />

System intact:<br />

• Per unit voltages between 0.95 p.u. and 1.05 p.u.<br />

• All lines and transformers loaded to less than continuous rating.<br />

Single contingency outage conditions:<br />

• Per unit voltages between 0.90 p.u. and 1.10 p.u.<br />

• All facilities loaded to less than 100% of emergency ratings.<br />

Remedial actions are required to achieve the rated transfer capability.<br />

Following an outage, all overloaded lines and transformers must have their<br />

loading reduced to continuous ratings within 15 minutes. This is<br />

accomplished by reducing schedules and adjusting generation.<br />

There is a formal operating proceduredated 4/12/1991. PAC is the<br />

operating agent and uses real-time flows to monitor the path.<br />

PAC has the entire transfer capability of the path.<br />

See attachment<br />

PART VI Item 1-230