Path Rating Catalog 2013 - Western Electricity Coordinating Council Path Rating Catalog 2013 - Western Electricity Coordinating Council
Added January 2013 III-7. Bridger/Anticline West Path (Post Gateway) To THERMOPOLIS To THERMOPOLIS Riverton 230 kV (5) 230 kV (5) Wyopo CASPER WINDSTAR 230 kV (5) 230 kV (5) DAVE JOHNSTON 230 kV (5) SPENCE 230 kV (5) 230 kV (5) Towards 3 Mile Knoll WIND RIVER 230 kV (5) ATLANTIC CITY Mustang DIFFICULTY 230 kV (5) 230 kV (5) Populus 345 kV (5) Towards Monument 500 kV (5) 345 kV (25) 345 kV (5) 230 kV (5) ROCK SPRINGS 230 kV (5) 230 kV (5) 230 kV (5) 230 kV (5) Point of Rocks 230 kV (5) Bitter Creek 230 kV (5) BRIDGER/ ANTICLINE 230 kV (5) Bar X 500 kV (5) Echo Springs 230 kV (5) 230 kV (5) 230 kV (5) Latham MINERS Platte WYOMING 230 kV (5) 230 kV (5) AEOLUS CHEYENNE COLORADO 500 kV (5) Legend Planned Voltage Existing Voltage CLOVER 500 kV 345 kV 230 kV 230 kV PART VI Item 1-226
Added January 2013 III-7. Bridger/Anticline West Path (Post Gateway) Accepted Rating Existing Rating Other Location: New 500 kV and 345 kV transmission lines in southwest Wyoming and southeastern Idaho. Definition: Sum of flows on the following lines: Line Metered End Anticline – Populus 500 kV Anticline Jim Bridger-Three Mile Knoll 345 kV Jim Bridger Jim Bridger-Populus 345 kV #1 Jim Bridger Jim Bridger-Populus 345 kV #2 Jim Bridger Transfer Limit: East to West : 4100 MW West to East : Not defined Critical Loss of the Aeolus-Anticline 500 kV line. This outage requires tripping Disturbance 600 MW of wind generation and capacitor switching in Wyoming. that limits the Following this critical outage, and generating tripping, transfer capabilities transfer on this path are limited by loading on the Miners-Platte 230 kV line. capability: When December 2010 System Requires the Gateway South – Stage 1facilities in order to reach the Stage 1 Conditions: rating on the Bridger/Anticline West path. Study Criteria: Remedial Action Required: Formal Operating Procedure: Allocation: Interaction w/Other Transfer Paths: Contact Person: NERC/WECC standards. Trip wind generation in Eastern Wyoming. Switch capacitors in Eastern Wyoming and Central Utah. TBD 100% PacifiCorp Based on Gateway West path rating studies the following Nomogram relationship have been defined: JB/AC West vs. Aeolus South , JB/AC West vs. Path C (Path 20), JB/AC West vs. Bonanza West (Path 33), JB/AC West vs. PacifiCorp Internal Paths (Monument-Naughton, RS/Firehole West) Craig Quist PacifiCorp 1407 W. North Temple - Suite 275 Salt Lake City, UT 84140 (801) 220-4264 (801) 220-2842-fax craig.quist@pacificorp.com PART VI Item 1-227
- Page 185 and 186: Revised January 2013 Remedial Actio
- Page 187 and 188: 68. Deleted February 1999 INTENTION
- Page 189 and 190: 70. Deleted February 1999 INTENTION
- Page 191 and 192: 71. South of Allston Revised Januar
- Page 193 and 194: 72. Deleted February 1999 INTENTION
- Page 195 and 196: 73. North of John Day Revised Decem
- Page 197 and 198: 74. Deleted February 1999 INTENTION
- Page 199 and 200: Revised January 2013 75. Hemingway
- Page 201 and 202: 76. Alturas Project Revised Februar
- Page 203 and 204: Revised February 2002 Contact Perso
- Page 205 and 206: 77. Crystal - Harry Allen Revised N
- Page 207 and 208: 78. TOT 2B1 Revised January 2013 Ac
- Page 209 and 210: 79. TOT 2B2 Revised January 2013 Ac
- Page 211 and 212: 80. Montana Southeast Revised Janua
- Page 213 and 214: 81. Centennial Revised November 200
- Page 215 and 216: 82. TotBeast Revised January 2013 P
- Page 217 and 218: Revised January 2013 Formal Operati
- Page 219 and 220: III-1. Devers-Palo Verde #2 Path 49
- Page 221 and 222: Revised November 2007 System Condit
- Page 223 and 224: Revised November 2007 III-2. Palo V
- Page 225 and 226: Updated November 2007 III-3. Montan
- Page 227 and 228: simultaneous analysis, only heavy s
- Page 229 and 230: III-4. Path C (Post Gateway) Revise
- Page 231 and 232: Revised January 2011 Interaction w/
- Page 233 and 234: III-5. Aeolus South Project Added J
- Page 235: Added January 2013 III-6. Aeolus We
- Page 239 and 240: III-9. TOT 4A (Pre-Gateway) Revised
- Page 241 and 242: Contact Person: Craig Quist PacifiC
- Page 243 and 244: Added January 2013 III-10. TOT 4A (
- Page 245 and 246: III-11. TOT 4B (Pre-Gateway) Revise
- Page 247 and 248: Operating operating agent and uses
- Page 249 and 250: III-12. SunZia Southwest Transmissi
- Page 251 and 252: Contact Person Mark L. Etherton, P.
- Page 253 and 254: Revised January 2013 Formal Operati
- Page 255 and 256: Revised January 2013 Allocation: In
- Page 257 and 258: January 2013 III-15. TotBeast with
- Page 259 and 260: January 2013 III-16. Idaho to North
- Page 261 and 262: January 2013 Study Criteria: Remedi
- Page 263 and 264: Revised January 2013 III-17. TOT3 A
- Page 265 and 266: Remedial Actions Required: Formal O
- Page 267 and 268: Phase II Projects PART VI Item 1-25
- Page 269 and 270: Revised December 2010 II-1. Navajo
- Page 271 and 272: Added January 2010 II-3. TransWest
- Page 273 and 274: II-5. Path 45 Uprate Project Revise
- Page 275 and 276: Contact Person: Ing. Jesús Moya Je
- Page 277 and 278: Added February 2010 II-6. Southwest
- Page 279 and 280: Intertie, Normally Close) Interacti
- Page 281 and 282: II-8. IID - SCE March 2013 Accepted
- Page 283: II-9. IID - SCE March 2013 Accepted
Added January <strong>2013</strong><br />
III-7. Bridger/Anticline West <strong>Path</strong> (Post<br />
Gateway)<br />
To<br />
THERMOPOLIS<br />
To<br />
THERMOPOLIS<br />
Riverton<br />
230 kV (5)<br />
230 kV (5)<br />
Wyopo<br />
CASPER<br />
WINDSTAR<br />
230 kV (5)<br />
230 kV (5)<br />
DAVE<br />
JOHNSTON<br />
230 kV (5)<br />
SPENCE<br />
230 kV (5)<br />
230 kV (5)<br />
Towards 3<br />
Mile Knoll<br />
WIND RIVER<br />
230 kV (5)<br />
ATLANTIC CITY<br />
Mustang<br />
DIFFICULTY<br />
230 kV (5)<br />
230 kV (5)<br />
Populus<br />
345 kV (5)<br />
Towards<br />
Monument<br />
500 kV (5)<br />
345 kV (25)<br />
345 kV (5)<br />
230 kV (5)<br />
ROCK<br />
SPRINGS<br />
230 kV (5)<br />
230<br />
kV (5)<br />
230<br />
kV (5)<br />
230 kV (5)<br />
Point of<br />
Rocks<br />
230<br />
kV (5)<br />
Bitter<br />
Creek<br />
230 kV (5)<br />
BRIDGER/<br />
ANTICLINE<br />
230<br />
kV (5)<br />
Bar X<br />
500 kV (5)<br />
Echo<br />
Springs<br />
230<br />
kV (5)<br />
230<br />
kV (5)<br />
230 kV<br />
(5)<br />
Latham<br />
MINERS<br />
Platte<br />
WYOMING<br />
230 kV (5)<br />
230 kV (5)<br />
AEOLUS<br />
CHEYENNE<br />
COLORADO<br />
500 kV (5)<br />
Legend<br />
Planned Voltage Existing Voltage<br />
CLOVER<br />
500 kV<br />
345 kV<br />
230 kV<br />
230 kV<br />
PART VI Item 1-226