III-5. Aeolus South Added January 2011 230 kV (5) WINDSTAR 230 kV (5) 230 kV (5) DAVE JOHNSTON DIFFICULTY 230 kV (5) 230 kV (5) 500(5) 230 kV (5) BRIDGER/ Anticline 500(5) 230 kV (5) MINERS 230 kV (5) AEOLUS Aeolus South Platte WYOMING 500(5) COLORADO Legend CLOVER Planned Voltage Existing Voltage 500 kV 230 kV 345 kV 230 kV PART VI Item 1-222

III-5. Aeolus South Project Added January 2011 Accepted Rating Existing Rating Other Location: New 500 kV transmission line from eastern Wyoming to central Utah. Definition: Aeolus- Clover 500 kV metered at Aeolus. Transfer Limit: Northeast to Southwest : 1700 MW Critical West of Aeolus or West of Anticline 500 kV line outages. Disturbance that limits the transfer capability: When Gateway South-Aeolus South Phase 2 rating report, Dec 16 2010 System Requires the Gateway West Stage 1 facilities to achieve rating. Conditions: Study Criteria: NERC/WECC planning standards. Remedial Generator tripping at Aeolus for loss of Aeolus- Clover 500 kV or Aeolus- Action Anticline 500 kV lines; or generator tripping at Bonanza for loss of Required: Bonanza- Mona 345 kV line. Formal TBD Operating Procedure: Allocation: Interaction w/Other Transfer Paths: Contact Person: 100% PacifiCorp Based on Gateway South path rating studies the following nomogram relationship have been defined: Aeolus South vs. Aeolus West (New Path), Aeolus South vs. Bridger/Anticline West (Path 19) and Aeolus South vs. IPP DC line (Path 27) Craig Quist PacifiCorp 1407 West North Temple Suite 275 Salt Lake City, UT 84116 (801) 220-4264 (801) 220-2842 – fax Craig.Quist@PacifiCorp.com PART VI Item 1-223

III-5. Aeolus South Project<br />

Added January 2011<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location: New 500 kV transmission line from eastern Wyoming to central Utah.<br />

Definition: Aeolus- Clover 500 kV metered at Aeolus.<br />

Transfer Limit: Northeast to Southwest : 1700 MW<br />

Critical West of Aeolus or West of Anticline 500 kV line outages.<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When Gateway South-Aeolus South Phase 2 rating report, Dec 16 2010<br />

System Requires the Gateway West Stage 1 facilities to achieve rating.<br />

Conditions:<br />

Study Criteria: NERC/WECC planning standards.<br />

Remedial Generator tripping at Aeolus for loss of Aeolus- Clover 500 kV or Aeolus-<br />

Action Anticline 500 kV lines; or generator tripping at Bonanza for loss of<br />

Required: Bonanza- Mona 345 kV line.<br />

Formal TBD<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact<br />

Person:<br />

100% PacifiCorp<br />

Based on Gateway South path rating studies the following nomogram<br />

relationship have been defined: Aeolus South vs. Aeolus West (New <strong>Path</strong>),<br />

Aeolus South vs. Bridger/Anticline West (<strong>Path</strong> 19) and Aeolus South vs.<br />

IPP DC line (<strong>Path</strong> 27)<br />

Craig Quist<br />

PacifiCorp<br />

1407 West North Temple<br />

Suite 275<br />

Salt Lake City, UT 84116<br />

(801) 220-4264<br />

(801) 220-2842 – fax<br />

Craig.Quist@PacifiCorp.com<br />

PART VI Item 1-223