III-4. <strong>Path</strong> C (Post Gateway)<br />

Revised January 2011<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

Northern Utah/Southern Idaho<br />

Sum of the flows on the following transmission lines:<br />

Line<br />

Malad- American Falls *138 kV<br />

Ben Lomond-Populus *1 345 kV<br />

Ben Lomond-Populus *2 345 kV<br />

Treasureton-Sun Beam-Brady* 230 kV<br />

Fish Creek – Goshen *161 kV<br />

Terminal-Populus *345 kV<br />

Three Mile Knoll 138/345* kV Transformer<br />

Three Mile Knoll 138*/115 kV Transformer<br />

North to South: 2250 MW (nominal)<br />

South to North: 2250 MW (nominal)<br />

Operating limits are based on both path rating studies and System Operating<br />

Limit (SOL) studies.<br />

Populus- Ben Lomond 345 kV #1 & #2<br />

Populus- Ben Lomond 345 kV #1 & Terminal-Populus 345 kV.<br />

When: <strong>Path</strong> rating granted January 5, 2011.<br />

System<br />

No limitations.<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

• Steady state pre disturbance voltages between .95 p.u. and 1.05 p.u.<br />

• Post-disturbance voltages between .90 p.u. and 1.10 p.u.<br />

• Post-disturbance line loadings less than “emergency ratings.”<br />

• First-swing transient voltage dips not to exceed .80 p.u.<br />

Northbound: Seperation of the 138 kV system between Ben Lomond and<br />

Treasureton and the 138 kV tie to American Falls. Additional studies will be<br />

performed to refine the optimal location.<br />

Southbound: None<br />

Defined<br />

Allocation:<br />

100% PacifiCorp<br />

PART VI Item 1-220