Revised November 2007<br />

III-2. Palo Verde-Devers #2/<br />

<strong>Path</strong> 46 <strong>Rating</strong><br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

The WOR lines interconnect southern Nevada and Arizona to southern<br />

California<br />

The sum of the flows on the following transmission lines:<br />

Line<br />

Metered End<br />

(Northern System)<br />

Eldorado-Lugo 500 kV<br />

Eldorado<br />

Eldorado-Lugo 230 kV lines 1 & 2<br />

Eldorado<br />

Mohave-Lugo 500 kV<br />

Mohave<br />

Julian Hinds-Mirage 230 kV<br />

Mirage<br />

McCullough-Victorville 500 kV lines 1 & 2<br />

McCullough<br />

Hoover-Victorville 287 kV<br />

Hoover<br />

Marketplace-Adelanto 500 kV<br />

Marketplace<br />

(Southern System)<br />

North Gila-Imperial Valley 500 kV<br />

North Gila<br />

Palo Verde-Devers 500 kV<br />

Devers<br />

Palo Verde-Devers 500 kV #2<br />

(Underlying System)<br />

El Centro-Imperial Valley 230 kV<br />

Imperial Valley<br />

Ramon-Mirage 230 kV<br />

Mirage<br />

Coachella-Devers 230 kV<br />

Devers<br />

11,823 MW<br />

Loss of the Palo Verde-North Gila or Palo Verde-Devers 500 kV lines.<br />

By letter dated May 17, 2006, Palo Verde #2, <strong>Path</strong> 46 <strong>Rating</strong> was granted<br />

Phase III status by the PCC Chair.<br />

<strong>Rating</strong> valid under all system conditions.<br />

NERC/WECC Reliability Standards<br />

None<br />

PART VI Item 1-213