Revised November 2007<br />

III-1. Devers-Palo Verde #2 (DPV2)<br />

<strong>Path</strong> 49 <strong>Rating</strong><br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

<strong>Western</strong> Arizona<br />

Sum of the flows on the following transmission lines:<br />

Line<br />

Metered End<br />

Navajo-Crystal-McCullough 500 kV Navajo<br />

Moenkopi-Eldorado 500 kV Eldorado<br />

Liberty-Peacock-Mead 345 kV Liberty<br />

Palo Verde-Devers 500 kV Palo Verde<br />

Palo Verde-Devers 500 kV #2<br />

Hassayampa-North Gila 500 kV Hassayampa<br />

Perkins-Mead 500 kV<br />

Perkins<br />

East to West: 9255 MW (Non-simultaneous)<br />

West to East: Not rated<br />

Other<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

The non-simultaneous transfer rating was established in 2005 by the <strong>Western</strong><br />

Arizona Transmission Systems (WATS) Task Force. The Task Force was<br />

comprised of members from the following companies:<br />

Arizona Public Service Company<br />

El Paso Electric Company<br />

DOE-<strong>Western</strong> Area Power Administration<br />

Imperial Irrigation District<br />

Los Angeles Department of Water and Power<br />

Nevada Power Company<br />

Public Service Company of New Mexico<br />

Salt River Project<br />

San Diego Gas and Electric Company<br />

Southern California Edison Company<br />

Southern California Public Power Authority<br />

Tucson Electric Power Company<br />

SCE sponsored studies conducted within a WECC Review Group that led to<br />

approval of the Accepted <strong>Rating</strong> Report, and was granted Accepted <strong>Rating</strong><br />

Status by the August 30, 2005 letter from the PCC Chairman.<br />

PART VI Item 1-210