79. TOT 2B2<br />

Revised January <strong>2013</strong><br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Southern Utah to N. Arizona<br />

Definition: Sigurd‐Glen Canyon 230 kV Line. This line combined with the Pinto –Four<br />

Corners 345 kV line make up the TOT 2B <strong>Path</strong>. Metering point is at Glen<br />

Canyon.<br />

Transfer Limit: North to South: 265 MW<br />

South to North: 300 MW<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

Non‐simultaneous: Steady state thermal limit of the Sigurd 230kV phase<br />

shifting transformer.<br />

Simultaneous: Huntington‐Pinto, Pinto‐Four Corners, Sigurd‐Three Peaks or<br />

Three Peaks‐Red Butte 345 kV line outages.<br />

<strong>Rating</strong>s were verified in Gateway South TOT 2B/2C <strong>Path</strong> <strong>Rating</strong> Study<br />

Report approved by WECC on June 21, 2011.<br />

Parallel 345 kV lines are at moderate levels. This line is limited to 250 MW<br />

(north to south) when TOT 2B1 and TOT 2C flows are heavy.<br />

NERC Planning Standards, WECC System Performance Criteria, PacifiCorp<br />

Internal Reliability Criteria.<br />

None<br />

Per most recent Summer Operating Limit (SOL) Study.<br />

PacifiCorp<br />

Gateway South TOT 2B/2C <strong>Path</strong> <strong>Rating</strong> Study demonstrated interaction with<br />

TOT 2B1, TOT 2C and IPPDC line under moderate to heavy IPPDC import<br />

conditions. Previous COI studies have identified interaction with TOT 2.<br />

William Hall<br />

PacifiCorp, Transmission Planning<br />

1407 W. North Temple – Suite 275<br />

Salt Lake City, UT 84116<br />

(801) 220‐4274<br />

William.Ruthruff@PacifiCorp.com<br />

PART VI Item 1-199

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!