78. TOT 2B1<br />

Revised January <strong>2013</strong><br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

Southern Utah to N. Arizona/W. New Mexico<br />

Pinto‐Four Corners 345 kV Line. This line combined with the Sigurd‐Glen<br />

Canyon 230 kV line make up the TOT 2B <strong>Path</strong>. Metering point is at Four<br />

Corners.<br />

600 MW bidirectional<br />

Non‐simultaneous: Steady state thermal limit of the Pinto 345 kV phase<br />

shifting transformers.<br />

Simultaneous: Sigurd‐Three Peaks 345 kV or Three Peaks‐Red Butte 345 kV<br />

line outage and Intermountain‐Adelanto 500 kV bi‐pole DC line outage<br />

limiting element: Pinto 345 kV phase shifting transformers.<br />

Bidirectional rating was established in Gateway South TOT 2B/2C <strong>Path</strong><br />

<strong>Rating</strong> Study Report approved by WECC on June 21, 2011.<br />

<strong>Rating</strong>s determined for peak summer and off peak conditions with maximum<br />

simultaneous TOT 2B/2C flows and near maximum overall TOT 2 flow<br />

conditions.<br />

NERC Planning Standards, WECC System Performance Criteria, PacifiCorp<br />

Internal Reliability Criteria.<br />

None.<br />

TOT 2B1 export vs. Intermountain‐Mona 345 kV line imports nomogram per<br />

most recent Summer Operating Limit (SOL) Study.<br />

PacifiCorp<br />

Gateway South TOT 2B/2C <strong>Path</strong> <strong>Rating</strong> Study demonstrated interaction with<br />

TOT 2B2, TOT 2C, and IPPDC line under moderate to heavy IPPDC import<br />

conditions. Previous COI studies have identified interaction with TOT 2.<br />

William Hall<br />

PacifiCorp, Transmission Planning<br />

1407 W. North Temple – Suite 275<br />

Salt Lake City, UT 84116<br />

(801) 220‐4274<br />

William.Hall2@PacifiCorp.com<br />

PART VI Item 1-197

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!