73. North of John Day<br />

Revised December 2011<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

Southern Washington/Northern Oregon<br />

Sum of the flows on the following lines:<br />

Line<br />

Metered End<br />

Raver-Paul 500 kV<br />

Raver<br />

Wautoma-Ostrander 500 kV Wautoma<br />

Wautoma-Rock Creek 500 kV Wautoma<br />

Ashe-Marion 500 kV<br />

Ashe<br />

Ashe-Slatt 500 kV<br />

Ashe<br />

Lower Monumental-McNary 500 kV McNary<br />

Limits established in SOL studies<br />

Spring – 8000 MW<br />

Summer – 7800 MW<br />

Winter – 7700 MW<br />

Two Palo Verde unit loss<br />

PDCI Bipole<br />

The path is limited for outages that local steady state voltage instability.<br />

System Operating Limit (SOL) studies are completed on an annual basis as<br />

part of <strong>Path</strong> 66.<br />

Load: light winter, heavy spring, and heavy summer<br />

California-Oregon Intertie (north to south) – 4800 MW<br />

California-Oregon intertie (south to north) – 3675 MW<br />

Pacific DC Intertie (north to south) - 3100 MW<br />

Coulee generation - 5600 MW - 7000 MW<br />

Lower Columbia generation low (spring and summer fish flush levels)<br />

All applicable BPA and WECC/NERC criteria.<br />

Third AC RAS - Gen Drop at Chief Jo, Coulee, John Day, McNary/Chief Jo<br />

Brake. RAS Reactive Switching in the Northwest. FACRI - Fort Rock series<br />

capacitors and Malin MSC.<br />

Accepted COI vs NJD seasonal operating nomograms developed by NOPSG<br />

for winter, spring, and summer. Refer to BPA Dispatcher Standing Order<br />

#306, “COI/NW-Sierra, PDCI, North of John Day nomogram operation with<br />

north to south powerflow and NOPSG reports for COI+Alturas/PDCI vs.<br />

NJD nomograms.<br />

COI (<strong>Path</strong> 66)<br />

PDCI (<strong>Path</strong> 65)<br />

Berhanu Tesema (TPP-OPP-3)<br />

Bonneville Power Administration<br />

7600 NE 41 st Street, Suite 340 P.O. Box 61409<br />

PART VI Item 1-185