Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Revised January <strong>2013</strong><br />
Remedial<br />
Actions<br />
Required:<br />
Formal<br />
Operating<br />
Procedure:<br />
Allocation:<br />
Interaction<br />
w/Other<br />
Transfer<br />
<strong>Path</strong>s:<br />
Contact<br />
Person:<br />
Depending on the outage and the magnitude and direction of flow, one or more<br />
of the following remedial actions may be used:<br />
Northwest generator dropping<br />
Chief Jo Brake insertion<br />
Fort Rock Series Capacitor insertion<br />
Northwest load dropping<br />
Feather River generator dropping<br />
Northern and central California pump dropping<br />
Round Mt 500/230 kV transformer bank opening<br />
Series capacitor bypassing on the Olinda-Tracy 500 kV line<br />
Series capacitor bypassing on the Malin-Round Mt. #1 and #2 500 kV<br />
lines<br />
MSC insertion at Malin, Table Mt, Olinda, and/or Tracy 500 kV stations<br />
Shunt reactors switching at Olinda and Tracy 500 kV stations<br />
NE/SE Separation Scheme<br />
Northwest Shunt Reactive Switching<br />
BPA Standing Order 306 and California ISO T-102 (COI/PDCI/North of John<br />
Day Nomogram Operation)<br />
California ISO T-120 (Adverse Operating Conditions)<br />
Northwest: BPA (58.8%), PacifiCorp (8.3%), PGE (17.7%), NW capacity<br />
Owners (15.1%)<br />
California: PACI participants (2/3), COTP Participants (1/3)<br />
Nomograms are routinely developed to identify simultaneous operating<br />
constraints between this path and other paths including: the Pacific DC Intertie<br />
(<strong>Path</strong> 65), North of John Day(<strong>Path</strong> 73), Montana-Northwest (<strong>Path</strong> 8), Idaho-<br />
Northwest (<strong>Path</strong> 14), and Reno-Alturas (<strong>Path</strong> 76).<br />
California:<br />
Kang-Ling Ching<br />
PG&E<br />
Mail Code B15A<br />
P.O. Box 770000<br />
San Francisco, CA 94177<br />
(415) 973-7637<br />
(415) 973-8804 – fax<br />
kxc5@pge.com<br />
Northwest:<br />
Berhanu Tesema (TPP-<br />
OPP-3)<br />
Bonneville Power<br />
Administration<br />
7600 NE 41 st Street,<br />
Suite 340<br />
P.O. Box 61409<br />
Vancouver, WA<br />
98666-1409<br />
(360) 619-6819<br />
(360) 619-6589 – fax<br />
bktesema@bpa.gov<br />
Kirk Sornborger<br />
WAPA-SNR<br />
114 Parkshore Drive<br />
Folsom, CA 95630<br />
(916) 353-4063<br />
(916) 985-6438 – fax<br />
Sornborg@wapa.gov<br />
Don Johnson<br />
Portland General<br />
Electric<br />
121 S. W. Salmon<br />
Street, 3WTC0402<br />
Portland, OR 97204<br />
(503)464-7400<br />
(503) 464-7796 – fax<br />
don.johnson@pgn.com<br />
Dilip Mahendra<br />
SMUD<br />
P. O. Box 15830<br />
Sacramento, CA 95852<br />
(916) 732-6180<br />
(916) 732-7517 - fax<br />
dmahend@smud.org<br />
Larry Frick<br />
PacifiCorp, Transmission<br />
Planning<br />
Lloyd Ctr Tower Rm 1800<br />
825 NE Multnomah<br />
Portland, OR 97232<br />
(503) 813-6236<br />
(503) 813-6508 -fax<br />
Larry.Frick@PacifiCorp.com<br />
PART VI Item 1-175