Revised January <strong>2013</strong><br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer<br />

<strong>Path</strong>s:<br />

Contact<br />

Person:<br />

Depending on the outage and the magnitude and direction of flow, one or more<br />

of the following remedial actions may be used:<br />

Northwest generator dropping<br />

Chief Jo Brake insertion<br />

Fort Rock Series Capacitor insertion<br />

Northwest load dropping<br />

Feather River generator dropping<br />

Northern and central California pump dropping<br />

Round Mt 500/230 kV transformer bank opening<br />

Series capacitor bypassing on the Olinda-Tracy 500 kV line<br />

Series capacitor bypassing on the Malin-Round Mt. #1 and #2 500 kV<br />

lines<br />

MSC insertion at Malin, Table Mt, Olinda, and/or Tracy 500 kV stations<br />

Shunt reactors switching at Olinda and Tracy 500 kV stations<br />

NE/SE Separation Scheme<br />

Northwest Shunt Reactive Switching<br />

BPA Standing Order 306 and California ISO T-102 (COI/PDCI/North of John<br />

Day Nomogram Operation)<br />

California ISO T-120 (Adverse Operating Conditions)<br />

Northwest: BPA (58.8%), PacifiCorp (8.3%), PGE (17.7%), NW capacity<br />

Owners (15.1%)<br />

California: PACI participants (2/3), COTP Participants (1/3)<br />

Nomograms are routinely developed to identify simultaneous operating<br />

constraints between this path and other paths including: the Pacific DC Intertie<br />

(<strong>Path</strong> 65), North of John Day(<strong>Path</strong> 73), Montana-Northwest (<strong>Path</strong> 8), Idaho-<br />

Northwest (<strong>Path</strong> 14), and Reno-Alturas (<strong>Path</strong> 76).<br />

California:<br />

Kang-Ling Ching<br />

PG&E<br />

Mail Code B15A<br />

P.O. Box 770000<br />

San Francisco, CA 94177<br />

(415) 973-7637<br />

(415) 973-8804 – fax<br />

kxc5@pge.com<br />

Northwest:<br />

Berhanu Tesema (TPP-<br />

OPP-3)<br />

Bonneville Power<br />

Administration<br />

7600 NE 41 st Street,<br />

Suite 340<br />

P.O. Box 61409<br />

Vancouver, WA<br />

98666-1409<br />

(360) 619-6819<br />

(360) 619-6589 – fax<br />

bktesema@bpa.gov<br />

Kirk Sornborger<br />

WAPA-SNR<br />

114 Parkshore Drive<br />

Folsom, CA 95630<br />

(916) 353-4063<br />

(916) 985-6438 – fax<br />

Sornborg@wapa.gov<br />

Don Johnson<br />

Portland General<br />

Electric<br />

121 S. W. Salmon<br />

Street, 3WTC0402<br />

Portland, OR 97204<br />

(503)464-7400<br />

(503) 464-7796 – fax<br />

don.johnson@pgn.com<br />

Dilip Mahendra<br />

SMUD<br />

P. O. Box 15830<br />

Sacramento, CA 95852<br />

(916) 732-6180<br />

(916) 732-7517 - fax<br />

dmahend@smud.org<br />

Larry Frick<br />

PacifiCorp, Transmission<br />

Planning<br />

Lloyd Ctr Tower Rm 1800<br />

825 NE Multnomah<br />

Portland, OR 97232<br />

(503) 813-6236<br />

(503) 813-6508 -fax<br />

Larry.Frick@PacifiCorp.com<br />

PART VI Item 1-175