Revised December 2010<br />

54. Coronado-Silver King 500 kV<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Eastern Arizona<br />

Sum of flows on the following transmission lines:<br />

Line<br />

Metered End<br />

Coronado-Silver King 500 kV Coronado<br />

Transfer Limit: Coronado to Silver King: 1494 MW<br />

Silver King to Coronado: Not rated<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

The critical disturbance is loss of the Coronado-Silver King 500 kV line<br />

which causes the Cholla-Preacher Canyon 345 kV line to reach the<br />

emergency rating with the Coronado Unit 2 tripping.<br />

On March 12, 2007, Salt River Project (SRP) initiated the <strong>Rating</strong> Review<br />

Process for <strong>Path</strong> 54 (Coronado-Silver King 500 kV line) with an accepted<br />

rating of 1494 MW associated with the addition of Springerville Unit # 4.<br />

Phase II status was granted by TSS on June 20, 2007. The Accepted <strong>Rating</strong><br />

was approved by the PCC Chairman on November 15, 2007.<br />

2008 Heavy Summer conditions. Pre and Post- Springerville #4 benchmark<br />

cases were developed in which the eastern Arizona transmission paths were<br />

stressed until a thermal, stability or post-transient limit was reached.<br />

However, the accepted rating will be valid under all system conditions.<br />

NERC/WECC Reliability Criteria For Transmission System Planning<br />

Coronado Unit 2 tripping for the critical outage of the Coronado-Silver King<br />

500 kV line.<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person: John Hernandez, POB 100<br />

Salt River Project<br />

P.O. Box 52025<br />

Phoenix, AZ 85072-2025<br />

(602) 236-0968<br />

(602) 236-3896 - fax<br />

e-mail address:<br />

johnny.hernandez@srpnet.com<br />

Coronado-Silver King line operating procedure #45407. Additional operating<br />

procedures may be required and will be developed in the future.<br />

Salt River Project<br />

Potential interaction with <strong>Path</strong> 22. If necessary, possible <strong>Path</strong> 22/<strong>Path</strong> 54<br />

operating nomogram limits will be developed.<br />

PART VI Item 1-151