41. Sylmar to SCE Revised February 2003 PART VI Item 1-116
41. Sylmar to SCE Revised February 2005 Accepted Rating Existing Rating Other Location: Definition: Transfer Limit: Critical Disturbance that limits the transfer capability: When: System Conditions: Study Criteria: Remedial Actions Required: Formal Operating Procedure: Allocation: Interaction w/Other Transfer Paths: Contact Person: Los Angeles County, California Flows on the three 220/230 kV transformer banks at Sylmar switching station. Metered at LDWP side of the banks. North to South: 1600 MW (non-simultaneous) South to North: 1600 MW (non-simultaneous) Transfer limit based on the emergency thermal rating of the two existing transformers (800 MW each) for the loss of the third transformer. The rating was approved by letter dated May 24, 2004 subsequent to WECC approval of the Comprehensive Progress Report titled Sylmar to SCE – Path 41 Upgrade Rating Report submitted on April 23, 2004. North to South flows (LDWP to SCE) are typical during heavy summer conditions with imports from the Northwest into southern California through the Pacific DC intertie. South to North flows (SCE to LDWP) occur during light winter, South to North PDCI flows. WECC, LDWP, SCE None None The transformer capability of the path is divided between: PG&E CDWR City of Anaheim SCE LDWP City of Riverside SDGE City of Pasadena None Steven E. Mavis Southern California Edison Three Innovation Way Pomona, CA 91768 (909) 274-1587 (909) 274-1601 - fax steven.mavis@sce.com John Burnett Los Angeles Dept. Of Water & Power P. O. Box 111, Room 1246 111 N. Hope Street Los Angeles, CA 90051 (213) 367-1744 (213) 367-5132 john.burnett@ladwp.com PART VI Item 1-117
- Page 75 and 76: Contact Person: Barrie Kokanos, PhD
- Page 77 and 78: 24. PG&E - Sierra Revised February
- Page 79 and 80: 25. PacifiCorp/PG&E 115 kV Intercon
- Page 81 and 82: Study Criteria (continued) Remedial
- Page 83 and 84: Revised February 2007 26. Northern
- Page 85 and 86: Revised February 2003 27. Intermoun
- Page 87 and 88: System Conditions: The Accepted Rat
- Page 89 and 90: Revised January 2013 28. Intermount
- Page 91 and 92: Revised February 2003 29. Intermoun
- Page 93 and 94: Revised November 2007 Contact Perso
- Page 95 and 96: 30. TOT 1A Revised December 2012 Ac
- Page 97 and 98: 31. TOT 2A Revised January 2013 PAR
- Page 99 and 100: Revised January 2013 Remedial Actio
- Page 101 and 102: Revised February 2005 32. Pavant -
- Page 103 and 104: 33. Bonanza West Revised December 2
- Page 105 and 106: 34. SEE PATHS 78 AND 79 PART VI Ite
- Page 107 and 108: Revised January 2013 35. TOT 2C (Pa
- Page 109 and 110: 36. TOT 3 Revised January 2013 Acce
- Page 111 and 112: Created on 8/10/10 TABLE 1-1A: TOT3
- Page 113 and 114: 37. TOT 4A Revised January 2012 Acc
- Page 115 and 116: PART VI Item 1-105
- Page 117 and 118: 38. TOT 4B Revised January 2012 Acc
- Page 119 and 120: WYOMING SYSTEM OPERATING CURVE SYST
- Page 121 and 122: 39. TOT 5 Revised January 2013 Acce
- Page 123 and 124: 40. TOT 7 Revised February 2003 PAR
- Page 125: Revised January 2006 Allocation: In
- Page 129 and 130: 42. IID - SCE Revised February 2004
- Page 131 and 132: 43. North of San Onofre Revised Jan
- Page 133 and 134: 44. South of San Onofre Revised Feb
- Page 135 and 136: 45. SDG&E - CFE Revised December 20
- Page 137 and 138: Revised February 2003 46. West of C
- Page 139 and 140: Revised February 2007 Allocation: N
- Page 141 and 142: Revised January 2006 47. Southern N
- Page 143 and 144: Revised February 2007 48. Northern
- Page 145 and 146: Revised January 2010 Allocation: In
- Page 147 and 148: Revised January 2013 49. East of th
- Page 149 and 150: Revised January 2013 Utah Navajo Pa
- Page 151 and 152: 50. Cholla - Pinnacle Peak Revised
- Page 153 and 154: 51. Southern Navajo Revised Februar
- Page 155 and 156: Revised December 2010 Contact Perso
- Page 157 and 158: Revised February 2003 52. Silver Pe
- Page 159 and 160: 53. Deleted March 2007 INTENTIONALL
- Page 161 and 162: Revised December 2010 54. Coronado-
- Page 163 and 164: 55. Brownlee East Revised January 2
- Page 165 and 166: 56. Deleted February 1999 INTENTION
- Page 167 and 168: Revised February 2003 58. Eldorado
- Page 169 and 170: Revised February 2003 59. WALC Blyt
- Page 171 and 172: Revised February 2003 60. Inyo - Co
- Page 173 and 174: Revised February 2003 61. Lugo - Vi
- Page 175 and 176: 62. Eldorado - McCullough 500 kV Li
41. Sylmar to SCE<br />
Revised February 2005<br />
Accepted <strong>Rating</strong><br />
Existing <strong>Rating</strong><br />
Other<br />
Location:<br />
Definition:<br />
Transfer Limit:<br />
Critical<br />
Disturbance<br />
that limits the<br />
transfer<br />
capability:<br />
When:<br />
System<br />
Conditions:<br />
Study Criteria:<br />
Remedial<br />
Actions<br />
Required:<br />
Formal<br />
Operating<br />
Procedure:<br />
Allocation:<br />
Interaction<br />
w/Other<br />
Transfer <strong>Path</strong>s:<br />
Contact Person:<br />
Los Angeles County, California<br />
Flows on the three 220/230 kV transformer banks at Sylmar switching<br />
station. Metered at LDWP side of the banks.<br />
North to South: 1600 MW (non-simultaneous)<br />
South to North: 1600 MW (non-simultaneous)<br />
Transfer limit based on the emergency thermal rating of the two existing<br />
transformers (800 MW each) for the loss of the third transformer.<br />
The rating was approved by letter dated May 24, 2004 subsequent to WECC<br />
approval of the Comprehensive Progress Report titled Sylmar to SCE – <strong>Path</strong><br />
41 Upgrade <strong>Rating</strong> Report submitted on April 23, 2004.<br />
North to South flows (LDWP to SCE) are typical during heavy summer<br />
conditions with imports from the Northwest into southern California through<br />
the Pacific DC intertie.<br />
South to North flows (SCE to LDWP) occur during light winter, South to<br />
North PDCI flows.<br />
WECC, LDWP, SCE<br />
None<br />
None<br />
The transformer capability of the path is divided between:<br />
PG&E CDWR City of Anaheim<br />
SCE LDWP City of Riverside<br />
SDGE City of Pasadena<br />
None<br />
Steven E. Mavis<br />
Southern California Edison<br />
Three Innovation Way<br />
Pomona, CA 91768<br />
(909) 274-1587<br />
(909) 274-1601 - fax<br />
steven.mavis@sce.com<br />
John Burnett<br />
Los Angeles Dept. Of Water &<br />
Power<br />
P. O. Box 111, Room 1246<br />
111 N. Hope Street<br />
Los Angeles, CA 90051<br />
(213) 367-1744<br />
(213) 367-5132<br />
john.burnett@ladwp.com<br />
PART VI Item 1-117