Revised January <strong>2013</strong><br />

35. TOT 2C<br />

(<strong>Path</strong> rating change applicable to 2014 summer is included in Section III‐12.)<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

Southwest Utah to Southern Nevada<br />

Red Butte‐Harry Allen 345 kV line, Harry Allen 345 kV phase shifting and<br />

345/230 kV transformers. Metering point is at the NV‐UT state line.<br />

North to South: 400 MW<br />

South to North: 580 MW<br />

Non-simultaneous: Steady state operating limit of Red Butte SVS prior to<br />

June 2015.<br />

Simultaneous: Intermountain‐Adelanto 500 kV bi‐pole DC line outage.<br />

<strong>Rating</strong> were established in Gateway South TOT 2B/2C <strong>Path</strong> <strong>Rating</strong> Study<br />

Report approved by WECC on June 21, 2011.<br />

<strong>Rating</strong>s determined for peak summer and off peak conditions with maximum<br />

simultaneous TOT 2B/2C flows and near maximum overall TOT 2 flow<br />

conditions.<br />

NERC Planning Standards, WECC System Performance Criteria, PacifiCorp<br />

Internal Reliability Criteria.<br />

None. However, Huntington generator tripping for heavy Red Butte area load<br />

conditions with maximum simultaneous TOT 2B1 and TOT 2C transfers and<br />

loss of Sigurd Three Peaks or Three Peaks Red Butte 345 kV line.<br />

TOT 2C export vs. Intermountain‐Mona 345 kV line imports nomogram per<br />

most recent Summer Operating Limit (SOL) Study.<br />

PacifiCorp/NV Energy<br />

Gateway South TOT 2B/2C <strong>Path</strong> <strong>Rating</strong> Study demonstrated interaction with<br />

TOT 2B1, TOT 2B2, and IPPDC line under moderate to heavy IPPDC<br />

imports. Previous COI studies have identified interaction with TOT 2.<br />

William Hall<br />

PacifiCorp<br />

1407 W. North Temple – Suite 275<br />

Salt Lake City, UT 84116<br />

(801) 220‐4274<br />

William.Hall2@PacifiCorp.com<br />

Edi Von Engeln<br />

NV Energy<br />

6100 Neil Road, M/S S3B40<br />

Reno, Nevada 89511<br />

(775) 834‐4456<br />

(775) 834‐3047‐fax<br />

evonengeln@nvenergy.com<br />

PART VI Item 1-97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!