Revised February 2005<br />

32. Pavant - Gonder 230 kV<br />

Intermountain - Gonder 230 kV<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

Allocation:<br />

Interaction<br />

w/Other<br />

Transfer <strong>Path</strong>s:<br />

Contact Person:<br />

Central Eastern Nevada/Central <strong>Western</strong> Utah<br />

Sum of the flows on the following transmission lines:<br />

Line<br />

Metered Point<br />

Gonder-Pavant 230 kV<br />

NV-UT stateline<br />

Gonder-Intermountain 230 kV Gonder<br />

East to West: 440 MW<br />

West to East: 235 MW<br />

East to West: Pavant 230 kV bus voltage for loss of the IPP-Gonder 230 kV<br />

line.<br />

West to East: Falcon 345/230 XFMR thermal overload for loss of the Valmy-<br />

Coyote Crk 345 kV line. Also, Ft. Churchill 230/120 kV XFMR thermal<br />

overload for loss of the Falcon-Gonder 345 kV line.<br />

A comprehensive progress report was accepted on August 27, 1999. A Phase<br />

II report was approved by the PCC chairman on 12/19/00.<br />

East to west transfers were studied on light winter and heavy summer<br />

conditions. West to east transfers were studied on heavy summer conditions.<br />

Both WECC and Sierra Pacific reliability criteria were used in the<br />

comprehensive progress report and the Phase II report.<br />

None.<br />

Mt. Wheeler is allocated 40 MW during the summer and 22 MW during the<br />

winter on the Gonder-Pavant 230 kV line.<br />

None.<br />

Edi Von Engeln<br />

NV Energy<br />

6100 Neil Road, M/S S3B40<br />

Reno, NV 89511<br />

(775) 834-4456<br />

(775) 834-3047 - fax<br />

evonengeln@nvenergy.com<br />

PART VI Item 1-91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!