12.11.2014 Views

PPC Package

PPC Package

PPC Package

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

D) Delete<br />

Deletes tool requisition details<br />

E) Authorize<br />

Authorizes a pending requisition. Updates requisition-status, authorized-qty, remarks in<br />

t_tlrqsn.<br />

Data expected<br />

requisition no<br />

accept(A/R)<br />

authorized qty<br />

remarks<br />

2. TOOL REQUIREMENT<br />

(tc100ntlrq.4ge)<br />

A) Add Requirements<br />

Adds the quantity of each tool required for a period i.e. a particular year and quarter in<br />

w_tlreqd. If the tool exists in<br />

m_stkitm then it has been purchased else if it exists in<br />

m_manitm it has been manufactured.<br />

Data expected<br />

tool no<br />

year<br />

quarter no<br />

required quantity<br />

B) Modify Requirements<br />

In case the quantity required for a period and/or the status (whether purchased or<br />

manufactured) of the tool needs to be modified then this option is used.<br />

Data expected<br />

year<br />

quarter no<br />

make or buy status<br />

required quantity<br />

3. TOOL TRANSFER/RETURN (tc400ntsts.4ge)<br />

Ordnance Factories Institute of Learning, Dehradun 91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!