Chapter – 8<br />
Quality Assurance Module<br />
This module is used to raise and authorize inspection notes once the production is started. Daya to<br />
day production data will be entered operationwise. Some of the operations will be identified as<br />
inspection stages. Inspection notes will be prepared for these stages.<br />
Options: Add, Modify, Inquire, Delete, Authorize, Print<br />
Add: Used to enter an inspection note into the system. Inspection notes can be of two types:<br />
Material and Production. In case of material I-Note, Bond No along with other details has to<br />
be given at the time of raising an Inspection Note. In case of production type inspection note,<br />
Previous Inspection Note no has to be given. In case of first time manufacturing, we have to<br />
enter the material inspection note number.<br />
Data expected: Inote date,<br />
Work order number, Warrant number<br />
Operation number (in case of produced items)<br />
Item code (In case of Material Inote)<br />
Section code<br />
Submitted quantity<br />
Material I-note in case of first time<br />
production, otherwise previous I-note.<br />
In case of material inspection note, Bond number of the material has to be<br />
given.<br />
Action taken: An Inspection note record will be registered in the system which will be<br />
sentenced later by inspection authority.<br />
Authorize:<br />
Data expected: Inote number, Accepted/rejected quantities<br />
Action taken : Inspection note status will be changed and inspection quantities will be plotted in<br />
warrant. In case this is the final operation, then accepted quantity in the<br />
warrant will also be enhanced so that EP can be isuued.<br />
In case of rejection, rejection reason is also captured from the screen. This<br />
will be printed in the inspection note.<br />
Print:<br />
Either a particular Inspection note or the summary report giving the list of all<br />
the pending Inspection notes can be printed.<br />