Option: Add PM activity<br />
mm200apmdt<br />
MM200APMDT<br />
ENTER MACHINE/PM ACTIVITY<br />
Machine Number [ ] PM check code [ ]<br />
Machine Des [ ] Machine locat. [ ]<br />
PM description [ ] Interval Hr. [ ]<br />
Interval Mnth. [ ] Cum Hours<br />
wrkd since [ ]<br />
Last PM date [ ] last PM<br />
Number of PM done [ ] Exp duration [ ]<br />
(in hours)<br />
for PM<br />
Input:<br />
Action:<br />
Option:<br />
Machine number, PM check code (type of PM that needs to be done), interval in<br />
hours or month , cumulative hours worked since last PM,last PM date, number of PM<br />
done, expected duration of PM activity<br />
The different preventive maintenance activities that are to be performed on a<br />
machine are recorded in this option. Each activity may be identified by the PM check<br />
code. Preventive maintenance is done periodically to keep the machine in running<br />
condition and therefore the periodic interval (hours/months) after which the activity<br />
is to be done again is to be entered. On pressing the escape key after entering the<br />
required information, the PM activity details are recorded into the system.<br />
Update scheduled PM date<br />
mm200apmsc Enter PM Schedules for Specific Machines<br />
MM200EPMSC<br />
Machine Number : [ ]<br />
Machine Description : [ ]<br />
Preventive Maintenance<br />
Check Code : [ ]<br />
PM Check Description : [ ]<br />
Scheduled Date : [ ]<br />
Input: Machine number, PM check code, Scheduled PM date<br />
Action: The PM schedule for specific machines is registered in this option.<br />
On pressing the escape key, the information entered is recorded in the computer.<br />
Option: Spares management<br />