PPC Package
PPC Package
PPC Package
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Option: Machine breakdown<br />
mm100ahdor<br />
MM001AHDOR<br />
HANDOVER OF MACHINE FOR MAINTENANCE<br />
Machine number [ ]<br />
Machine Des [ ]<br />
Machine location [ ] Section [ ][ ]<br />
Maintenance type [ ] [ ]<br />
Breakdown date [ ]<br />
Breakdown time [ ]<br />
Complaint book serial number [ ]<br />
Input:<br />
Action:<br />
Machine number, maintenance type, breakdown date, breakdown time,complaint<br />
serial number<br />
When a machine has to be handed over to the maintenance department for some<br />
maintenance activity, the machine handover details are entered into the computer.<br />
Control B may be used to view the types of maintenance jobs that may be done.<br />
Various maintenance types are Electrical, Mechanical, Electronic etc. On entering<br />
the required information and pressing escape, the handover details are registered into<br />
the computer. If the user gives any details about the nature of breakdown then that<br />
also will be registered. Later this will be available to the maintenance personnel.<br />
Option: Machine PDC<br />
mm101ppdc<br />
MM100PPDC<br />
PLANNED DATE OF COMPLETION<br />
Machine number [ ] [ ]<br />
Planned date of completion [ ]<br />
Maintenance Category [ ] [ ]<br />
Maintenance Type [ ] [ ]<br />
Machine location [ ]<br />
Input:<br />
Action:<br />
Machine number, planned date of completion, maintenance category<br />
Once a machine has been handed over to the maintenance department for some<br />
maintenance activity, the maintenance department has to enter the planned date of<br />
Ordnance Factories Institute of Learning, Dehradun 80