12.11.2014 Views

PPC Package

PPC Package

PPC Package

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

mc_typ char(6) Machine type<br />

nxt_sec char(3) Next section code<br />

opn_typ char(1) Operation type<br />

opn_des char(60) Operation description<br />

lab_cd char(3) Labour code<br />

lab_cl char(3) Labour class<br />

lab_hr decimal(6,3) Labour hour required<br />

rat_100 money(13,4) Rate per set<br />

cum_rat money(13,4) Cummulative rate upto this operation<br />

mc_hr decimal(5,2) Machine hour required<br />

set_up_tm decimal(4,2) Setup time<br />

delay<br />

decimal(4,2)<br />

ref_itm char(10) Referrence item<br />

crit<br />

char(1)<br />

tgt_opn_no char(3) Target operation number<br />

wip_ind char(1) WIP indicator<br />

price_qty decimal(11,3) Priced quantity(to indicate how much labour<br />

has to be authorized for<br />

producing the required qty. It is excess<br />

to nthe required qty by the rejection<br />

percentage)<br />

multiply_ind char(1) Whether required qty is to be multiplied by<br />

the warrant qty<br />

rej_pct decimal(4,2) Rejection percent<br />

1. Operation Number: Consecutive numbers for operations.<br />

2. Alternate operation number: 0 for the original operation number, 1 for the first operation,<br />

2 for the second operation and so on.<br />

3. Secondary alternate: For set of operations to be considered togehter, this<br />

increments by one while operation number and<br />

alternate operation number remains same.<br />

4. Rate per set: Rate for producing the qty per set mentioned in the<br />

header.<br />

5. Cummulative rate: Cumulative rate upto this operation. If a new<br />

operation is inserted before this operation, then this<br />

field in this record and all the subsequent records gets<br />

updated.<br />

6. Priced quantity: If the estimated quantity is to be produced then labour<br />

has to be allowed for some more quantity considering<br />

the rejection. That is called price quantity.<br />

7. Section code: Validated for being a valid a section code.<br />

Operation detail<br />

est_no char(10) Estimate number<br />

Ordnance Factories Institute of Learning, Dehradun 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!