12.11.2014 Views

PPC Package

PPC Package

PPC Package

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

db050est ESTIMATE HEADER MAINTENANCE DB005ESTHD<br />

EP code :[ ] Drawing number :[ ]<br />

Estimate num :[ ] Revision num :[ ]<br />

Estimate date :[ ] Last revision date :[ ]<br />

Date effective :[ ] Last operation num :[ ]<br />

Unit quantity :[ ] Section code :[ ]<br />

Per Quantity :[ ] Labour cost :[ ]<br />

Estimate cost :[ ] Material cost :[ ]<br />

Input: End product code, estimate number, revision number, estimate date, last revision date, date<br />

effective, per quantity<br />

Action: The estimate header details are registered on pressing the escape key<br />

required data.<br />

after entering the<br />

Option: Modify an estimate<br />

db050est ESTIMATE HEADER MAINTENANCE DB005ESTHD<br />

EP code :[ ] Drawing number :[ ]<br />

Estimate num :[ ] Revision num :[ ]<br />

Estimate date :[ ] Last revision date :[ ]<br />

Date effective :[ ] Last operation num :[ ]<br />

Unit quantity :[ ] Section code :[ ]<br />

Per Quantity :[ ] Labour cost :[ ]<br />

Estimate cost :[ ] Material cost :[ ]<br />

Input: End product code<br />

Second input: Estimate date, last revision date, date effective, last operation number, section code,<br />

per quantity, labour cost, estimate cost,material cost<br />

Action: On entering the end product code and pressing escape, the rest of the record details are<br />

displayed and the second input details may be modified if required. The escape key has to be used to<br />

record the modifications in the system.<br />

Option: Inquire an estimate<br />

db050est ESTIMATE HEADER MAINTENANCE DB005ESTHD<br />

Ordnance Factories Institute of Learning, Dehradun 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!