PPC Package
PPC Package
PPC Package
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
After plan quantity, it is distributed into 4 quarterly quantities in 20%, 25%, 25%,<br />
30% proportion.<br />
In modify option the above quarterly distribution can be altered and plan quantity will be the<br />
aggregate of the modified quarterly planned quantities. Key for modification (EP Code, Plan<br />
year)<br />
2. Gross requirement calculations (mp002ngros.4ge)<br />
a) Run gross requirement calculation (mp002tgros.4ge),(mp002sgros,<br />
mp002tgros, mp002gdate, mp002estrv, mp002globl)<br />
Data expected:<br />
Starting year<br />
Starting quarter<br />
End year<br />
End quarter<br />
Action:<br />
Inserts rows in m_epgros indicating material requirement upto the raw<br />
material level. Production target is taken from m_plan.<br />
b) Query on gross calculation (mp002igros.4ge)<br />
(mp002globl, mp002igros)<br />
Query on:<br />
EP Code<br />
Item code<br />
Component code<br />
Qty required<br />
Year<br />
QuarterUnit of quantity<br />
Required date<br />
Required quantity<br />
Makes query on m_epgros<br />
c) Run adhoc requirement calculation (mp004tadhc.4ge)<br />
(mp004tadhc, mp004sadhc, mp004globl, mp002estrv, mp002gdate)<br />
Data expected:<br />
EP code<br />
Year<br />
Quarter<br />
Scheduled quantity<br />
Action:<br />
Inserts rows in m_adhmp indicating material requirement upto the raw<br />
material level. Production target is taken on adhoc basis.<br />
d) Query on adhoc calculation (mp004niadh.4ge)<br />
(mp004niadh, mp004iadh)<br />
Query on:<br />
Item code<br />
Required year<br />
Required month<br />
Unit of quantity<br />
Adhoc quantity<br />
Ordnance Factories Institute of Learning, Dehradun 17