If this target operation has no dependant operation with wip_<br />

ind = 3 then that operation is recorded as first operation in<br />

w_fstopn.<br />

If there are dependant operations, then the dependant operation<br />

is processed in a similar way. This process is repeated until<br />

there are no more target operations<br />

and coressponding dependant operations.<br />

Then for all the first operations the interstage stock(scheduled<br />

qty in m_wtprio) is added in m_pndjob. Red Warrant priority<br />

processing. All work order and warrants in m_pndjob which have a<br />

red priority status are selected. Then for each of the work<br />

order and warrants of the same priority the number of jobs<br />

pending is obtained from m_pndjob. These operations are then<br />

scheduled on capable machines in the best possible way. The<br />

finishing slot is calculated as First Free Slot After EST +<br />

Number Of Slots Required. To Schedule the Full Qty On That<br />

Machine.If that machine is not available then its alternate is<br />

considered. If alternate is also not available then next machine<br />

is considered for scheduling. This process is repeated until<br />

entire qty is scheduled or no more machines are available. After<br />

that if there is still some balance qty not scheduled then it is<br />

written in m_unschd. The pending job is deleted from m_pndjob.<br />

Similarly, the w_rpend file is processed. Green Warrant<br />

priority processing. The processing of green priority warrants<br />

is exactly similar to red warrants.<br />

Deletion of dummy schedules:-<br />

All dummy schedules in m_schfle are deleted.<br />

OPERATIONS SCHEDULING REPORT<br />

(ds010rsprt.4gl)<br />

Data expected<br />

start date<br />

start time<br />

end date<br />

end time<br />

Generates the operation schedule details workorder,warrant,<br />

operation wise. The start date should be the same as or after<br />

first available schedule date and end date should be on or<br />

earlier than last available schedule date.<br />

12. MACHINE LOADING REPORT<br />

(ds011rmprt.4gl)<br />

Data expected<br />

start date<br />

start time<br />

end date<br />

end time<br />

Generates the operation schedule details machine number wise.<br />

The start date should be on or after the first available<br />

schedule date and end date should be on or earlier than last<br />

available schedule date.<br />

Ordnance Factories Institute of Learning, Dehradun 117