12.11.2014 Views

PPC Package

PPC Package

PPC Package

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Item Code : [ ] [ ]<br />

Warrant Quantity : [ ] Qty. Produced : [ ]<br />

Qty. Accepted : [ ]<br />

Section Code : [ ] Inspn. Typ : [ ]<br />

Warrant Issue Date: [ ] Warrant PDC : [ ]<br />

Est. Material Val : [ ] Material Val Drawn: [ ]<br />

Est. Labour Val : [ ] Labour Val Drawn : [ ]<br />

Est. Total Val : [ ]<br />

Input:<br />

Work order number,<br />

Warrant number,<br />

Warrant closure date,<br />

Action:<br />

Once this option is executed, No more material or labour can be<br />

drawn against this warrant. In case the warrant is closed after all<br />

the warranted quantity is produced and accepted against it then the<br />

warrant is normally closed. Otherwise this is short closed.<br />

After entering these details, the user is shown details of<br />

material or labour drawal anomaly and asked if the process is to be<br />

continued. After confirmation, the warrant is marked closed / Short<br />

closed so that no more labour or material can be drawn against this<br />

warrant.<br />

Ordnance Factories Institute of Learning, Dehradun 110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!