12.11.2014 Views

PPC Package

PPC Package

PPC Package

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

wr160rwtre<br />

REPLACEMENT WARRANT RELEASE<br />

Work Order No. : [ ] Main Warrant No. : [ ]<br />

Item Code : [ ] [ ]<br />

Extract No : [ ] Warrant Rqn. No : [ ]<br />

Section Code : [ ] Inspn. Type : [ ]<br />

Desc. : [ ] Desc. : [ ]<br />

Estimate No : [ ] Revision No : [ ]<br />

Max Replace qty. : [ ] Warrant Quantity : [ ]<br />

Warrant Issue Date : [ ] Warrant PDC : [ ]<br />

1. Est. Material Val : [ ] Est. Labour Val : [ ]<br />

2. Total Val : [ ] Repl. Warrant No: [ ]<br />

Input:<br />

Work order number,<br />

Warrant number<br />

Second input: Estimate number,<br />

Revision number,<br />

Warrant Quantity,<br />

Warrant issue date,<br />

Planned date of completion<br />

Action:<br />

This option is to be used when a warrant is short closed and for<br />

the remaining remaining quantity another warrant is to be released.<br />

After the first set of input, the user is shown the relevant details<br />

on the screen. He notices the remaining quantity yet to be<br />

manufactured.<br />

Then warrant can be released only upto the maximum of remaining<br />

quantity.<br />

Option:<br />

wr200wtclo<br />

Close / Short close a warrant<br />

WARRANT CLOSURE<br />

Work Order No. : [ ] Warrant No. : [ ]<br />

Warrant Status : [ ] Warrant Closure Dt: [ ]<br />

Warrant Type : [ ]<br />

Ordnance Factories Institute of Learning, Dehradun 109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!