11.11.2014 Views

City of Bayswater Annual Report

City of Bayswater Annual Report

City of Bayswater Annual Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Like us<br />

Follow us<br />

61 Broun Avenue<br />

Morley Western Australia 6062<br />

Telephone: 08 9272 0622<br />

Facsimile: 08 9272 0665<br />

TTY: 08 9371 8493<br />

Postal Address:<br />

PO Box 467<br />

Morley Western Australia 6943<br />

Email: mail@bayswater.wa.gov.au<br />

w w w . b a y s w a t e r . w a . g o v . a u<br />

<strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> <strong>Annual</strong> <strong>Report</strong><br />

2011-12


<strong>City</strong> <strong>of</strong> <strong>Bayswater</strong><br />

Facts &<br />

Figures<br />

Population (ABS 2011 Census): 61,262<br />

Families (ABS 2011 Census): 16,266<br />

Born in Australia: 58.7 %<br />

Born overseas: 41.3 %<br />

Electors (September 2010) 40,477<br />

Residential premises: 26,976<br />

Commercial premises: 1,657<br />

Total area: 32.8km 2<br />

Parks and reserves: 168<br />

Swan River foreshore:<br />

10.2km<br />

Roads:<br />

380km*<br />

Footpaths:<br />

290km<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> includes the suburbs <strong>of</strong><br />

<strong>Bayswater</strong>, Bedford, Embleton, and Maylands, as<br />

well as parts <strong>of</strong> Morley, Noranda, Mount Lawley,<br />

Dianella and Beechboro.<br />

* includes portion <strong>of</strong> Tonkin Highway and Guildford Road<br />

<strong>City</strong> <strong>of</strong> <strong>Bayswater</strong><br />

Full Financial Statements<br />

2011-12<br />

Compact Disk


Contents<br />

Mayor’s <strong>Report</strong> 2<br />

Members <strong>of</strong> Council 3<br />

Chief Executive Officer’s <strong>Report</strong> 4<br />

Executive Services 6<br />

Administration and Community Services 9<br />

Technical Services 17<br />

Planning and Development Services 23<br />

Financial Services 28<br />

Statutory <strong>Report</strong>ing 34<br />

Attendance Summary 38<br />

Abridged Financial Statements 40<br />

Independent Auditor’s <strong>Report</strong> 41<br />

Statement by the Chief Executive Officer 42<br />

Statement <strong>of</strong> Comprehensive Income 43<br />

Statement <strong>of</strong> Financial Position 47<br />

Statement <strong>of</strong> Changes in Equity 48<br />

Statement <strong>of</strong> Cash Flows 49<br />

Rate Setting Statement 51<br />

North Ward<br />

Area 7km 2<br />

Parts <strong>of</strong> Noranda, Morley,<br />

Dianella and Beechboro<br />

Central Ward<br />

Area 9km 2<br />

Parts <strong>of</strong> Morley, Embleton,<br />

<strong>Bayswater</strong>, Dianella and<br />

Beechboro<br />

North Ward<br />

Central Ward<br />

West Ward<br />

Area 11km 2<br />

Bedford and parts <strong>of</strong><br />

<strong>Bayswater</strong>, Embleton,<br />

Morley and Dianella<br />

South<br />

Ward<br />

West Ward<br />

South Ward<br />

Area 5km 2<br />

Maylands and part <strong>of</strong><br />

Mt Lawley<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

1


Mayor’s <strong>Report</strong><br />

The 2011-12 year<br />

saw the culmination<br />

<strong>of</strong> a number <strong>of</strong> major<br />

projects that the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> delivered on<br />

behalf <strong>of</strong> the community.<br />

These projects<br />

represent a significant<br />

investment in the<br />

future <strong>of</strong> our city and<br />

they will make major<br />

contributions to the<br />

quality <strong>of</strong> life enjoyed by<br />

our residents.<br />

Since its <strong>of</strong>ficial opening in July<br />

2011, The RISE multipurpose<br />

community centre in Maylands<br />

has become a popular hub for the<br />

community and visitors alike. This<br />

$21 million centre provides a home<br />

for a range <strong>of</strong> community services<br />

and facilities, including a massive<br />

sports arena, state-<strong>of</strong>-the-art<br />

library, well-equipped gymnasium,<br />

community rooms, function suite<br />

and café.<br />

The RISE is important because<br />

it provides a vibrant social,<br />

recreational, cultural and civic hub<br />

that links to the economic and<br />

commercial activities <strong>of</strong> the nearby<br />

Maylands town centre.<br />

Another <strong>of</strong>ficial opening that took<br />

place during the 2011-12 year was<br />

that <strong>of</strong> the WA Ballet Company in<br />

its new home in the former Senses<br />

Building on Whatley Crescent<br />

in Maylands. Purchased by the<br />

<strong>City</strong>, the Ballet Company invested<br />

around $8 million in the building’s<br />

refurbishment. The <strong>City</strong>’s vision<br />

for this project is that it will add<br />

further impetus to the revitalisation<br />

underway in Maylands and act as<br />

a catalyst towards the creation <strong>of</strong> a<br />

performing arts cultural hub.<br />

Once again, during the year the<br />

<strong>City</strong> delivered a highly successful<br />

calendar <strong>of</strong> free community events<br />

that included such highlights as the<br />

Avon Descent Finish Line event<br />

in August 2011 and the Autumn<br />

River Festival in April 2012. During<br />

2011-12, the <strong>City</strong> decided to vary<br />

the venues for some <strong>of</strong> the events<br />

to take advantage <strong>of</strong> new facilities,<br />

such as The RISE and the<br />

Lightning Park Recreation Centre<br />

in Noranda. The effect <strong>of</strong> this has<br />

been to make the <strong>City</strong>’s events<br />

even more accessible to the local<br />

community.<br />

During 2011-12, the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> continued to focus on<br />

its Garden <strong>City</strong> ethos and delivered<br />

a wide range <strong>of</strong> environmental<br />

programs aimed at making our city<br />

a green and great place in which to<br />

live, work and play.<br />

As Mayor <strong>of</strong> the <strong>City</strong>, I had the<br />

great pleasure during 2011-12 <strong>of</strong><br />

presiding over meetings that saw<br />

two <strong>of</strong> the <strong>City</strong>’s longest serving<br />

Councillors invested as Freeman<br />

<strong>of</strong> the <strong>City</strong>. Deputy Mayor Cr<br />

Barry McKenna and Cr Marlene<br />

Robinson have served on Council<br />

for more than 20 years and during<br />

that time they have been hard<br />

working, dedicated and committed<br />

servants <strong>of</strong> their community. Their<br />

contribution to the work <strong>of</strong> the<br />

Council and the development <strong>of</strong> the<br />

<strong>City</strong> over the last two decades has<br />

been outstanding and they have<br />

been involved in just about every<br />

major project the <strong>City</strong> has taken<br />

forward during that time. On behalf<br />

<strong>of</strong> Council, I want to acknowledge<br />

their work and congratulate them<br />

on their Freeman status.<br />

Finally, I want to thank my fellow<br />

Councillors, including those<br />

Councillors who left the <strong>City</strong><br />

following last October’s elections,<br />

and the <strong>City</strong>’s staff for their great<br />

support and hard work during<br />

the year. Together they have<br />

delivered the myriad <strong>of</strong> services<br />

and programs to the community<br />

that comprises today’s local<br />

government.<br />

Cr Terence G Kenyon JP<br />

Mayor, <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong><br />

2<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Current <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> Councillors<br />

Back row: Cr Chris Cornish, Cr Graham Pittaway OAM, Cr Alan Radford<br />

Centre row: Deputy Mayor Cr Barry McKenna, Mayor Terry Kenyon JP, Cr Martin Toldo<br />

Front row: Cr Sonia Turkington, Cr Michael Sabatino, Cr Sylvan Albert, Cr Mike Anderton JP, Cr Marlene Robinson<br />

Councillors 1 July 2011 to 15 October 2011<br />

Cr Terry Blanchard<br />

West Ward<br />

Cr Sally Palmer<br />

Central Ward<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> Council comprises 11 Councillors representing four Wards - West, Central, North and South. The<br />

positions <strong>of</strong> Mayor and Deputy Mayor are filled by serving Councillors.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

3


Chief Executive<br />

Officer’s <strong>Report</strong><br />

During the 2011-12 financial<br />

year the <strong>City</strong> was faced with a<br />

number <strong>of</strong> challenges, including<br />

the need to respond to the State<br />

Government’s independent panel<br />

that was appointed to review the<br />

structure <strong>of</strong> local government in<br />

metropolitan Perth.<br />

This involved diverting substantial<br />

resources to prepare the <strong>City</strong>’s<br />

response to the independent<br />

panel’s issues paper and its<br />

subsequent draft findings that<br />

were released to the sector in<br />

April 2012.<br />

A priority for the organisation<br />

during 2011-12 was to progress<br />

the work needed to deliver all<br />

<strong>of</strong> the elements <strong>of</strong> the State<br />

Government’s Integrated Planning<br />

Framework by their June 2013<br />

deadline.<br />

This has involved setting up<br />

cross-organisational teams<br />

aimed at taking forward the <strong>City</strong>’s<br />

Asset Management Plan, 10-<br />

year Strategic Community Plan,<br />

Workforce Plan and Long Term<br />

Financial Plan. This preparatory<br />

work means that the <strong>City</strong> can<br />

be confident that it will meet its<br />

statutory obligations.<br />

The <strong>City</strong> further strengthened its<br />

ability to plan for the future needs<br />

<strong>of</strong> our community through the<br />

development and adoption <strong>of</strong> the<br />

Local Housing Strategy, which<br />

provides a framework to meet the<br />

<strong>City</strong>’s current and future housing<br />

needs, provides for more housing<br />

choice and manages the pressures<br />

that comes with a rapidly growing<br />

population in a developed urban<br />

environment.<br />

As an organisation, we continued<br />

a strong focus on asset and<br />

infrastructure maintenance, so<br />

that our facilities remain fit for<br />

purpose and continue to serve the<br />

community. An example <strong>of</strong> that<br />

was the focus during 2011-12 on<br />

refurbishing the irrigation systems<br />

within the <strong>City</strong>’s parks and gardens,<br />

such as Robert Thompson<br />

Reserve.<br />

The new irrigation systems use<br />

less water and are more reliable,<br />

which strengthened the <strong>City</strong>’s<br />

green credentials.<br />

The 2011-12 financial year was<br />

both challenging and rewarding<br />

and I want to thank the Mayor<br />

and his fellow Councillors for their<br />

continued support over the past 12<br />

months. I also want to pay tribute<br />

to my Directors and their staff for<br />

their hard work and commitment<br />

in ensuring the <strong>City</strong> continued to<br />

deliver a high standard <strong>of</strong> service<br />

to our residents.<br />

Francesca Lefante<br />

Chief Executive Officer<br />

4<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


The Senior Management Group<br />

1 2<br />

3<br />

4<br />

5<br />

Senior Management Group<br />

1. Ted Budzinski<br />

Director <strong>of</strong> Finance (retired<br />

30 March 2012).<br />

2. Jeremy Edwards<br />

Director <strong>of</strong> Administration and<br />

Community Services<br />

3. Doug Pearson<br />

Director <strong>of</strong> Technical Services<br />

4. Des Abel<br />

Director <strong>of</strong> Planning and<br />

Development Services<br />

5. Francesca Lefante<br />

Chief Executive Officer<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

5


Executive Services<br />

Our People<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> recognises<br />

that our staff, with a unique set <strong>of</strong><br />

skills and talents, are our greatest<br />

asset. We are committed to<br />

becoming an Employer <strong>of</strong> Choice,<br />

supporting and recognising the<br />

valuable contribution made by<br />

our workforce and improving our<br />

capacity to attract talented new<br />

people.<br />

The successful inclusion <strong>of</strong><br />

Security Staff into the current<br />

Collective Agreement continued<br />

the drive to align and improve<br />

conditions <strong>of</strong> employment for all<br />

staff.<br />

During the year the <strong>City</strong><br />

demonstrated its commitment<br />

to the community through the<br />

developmental opportunities<br />

for young people, increasing<br />

the number <strong>of</strong> apprentices, and<br />

providing work experience for local<br />

students to enhance their career<br />

prospects.<br />

Learning and<br />

Development<br />

The <strong>City</strong> is supportive <strong>of</strong> staff<br />

enhancing their skills and<br />

pr<strong>of</strong>essional knowledge through<br />

developmental opportunities.<br />

In 2011, a Management/<br />

Leadership program was<br />

developed and conducted<br />

specifically for the <strong>City</strong>, with all<br />

managers attending, providing an<br />

opportunity to obtain a Diploma<br />

qualification.<br />

For the second year running,<br />

the <strong>City</strong> entered a team in the<br />

Local Government Management<br />

Association’s Management<br />

Challenge. The challenge provides<br />

an opportunity to develop the<br />

management potential <strong>of</strong> its staff.<br />

During the year, the <strong>City</strong>’s induction<br />

program for new staff was reviewed<br />

to ensure all relevant information<br />

is conveyed. The program is now<br />

also delivered electronically.<br />

Equity and Diversity<br />

The <strong>City</strong> is committed to providing<br />

an inclusive environment, which<br />

embraces and values the individual<br />

differences between people, with<br />

workplaces free from discrimination<br />

and harassment.<br />

Representation:<br />

People from<br />

culturally<br />

diverse<br />

30.95%<br />

backgrounds<br />

Women 63.1%<br />

Indigenous<br />

Australians<br />

2.38%<br />

People with<br />

disabilities<br />

2.38%<br />

Mature workers 33.33%<br />

Occupational Safety and<br />

Health<br />

The <strong>City</strong> has a strong commitment<br />

to safety, promoting a safety culture<br />

across the organisation. This focus<br />

on workplace safety to reduce<br />

hazards and minimise injuries,<br />

and the education <strong>of</strong> staff, has<br />

been effective demonstrated by a<br />

reduction in lost time injuries.<br />

Media/Public Relations<br />

The Media/Public Relations section<br />

is responsible for providing the<br />

<strong>City</strong> with a proactive media liaison<br />

service, and during the 2011-12<br />

financial year the section produced<br />

over 135 media releases and<br />

responded to 113 media inquiries<br />

about the <strong>City</strong>’s programs and<br />

policies.<br />

6<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


As part <strong>of</strong> the <strong>City</strong>’s commitment to keeping residents and<br />

ratepayers informed about the <strong>City</strong>’s 200 plus services, the section<br />

produced two <strong>Bayswater</strong> Brief six page resident newsletters,<br />

as well as 11 full page, full colour advertorials that appeared in<br />

the Eastern <strong>Report</strong>er Community Newspaper. The advertorials<br />

represented a mix <strong>of</strong> news stories and advertisements about the<br />

<strong>City</strong>’s events program.<br />

Media/Public Relations was also responsible for producing the<br />

weekly Mayoral Column and writing or editing speeches for the<br />

Mayor, Deputy Mayor and Chief Executive Officer. Over the year,<br />

this involved producing 52 Mayoral Columns and writing or editing<br />

67 speeches.<br />

During 2011-12, the section produced a number <strong>of</strong> corporate<br />

publications, including the Budget Bulletin newsletter in July 2011<br />

and the <strong>City</strong>’s <strong>Annual</strong> <strong>Report</strong>, which was considered at the <strong>City</strong>’s<br />

<strong>Annual</strong> General Meeting <strong>of</strong> Electors held in December 2011. In<br />

both cases, this involved preparing and editing contributions,<br />

organising the photography and laying out the publications ready<br />

for print.<br />

In support <strong>of</strong> the work <strong>of</strong> other areas within the <strong>City</strong>, the section<br />

provided advice and assistance with the production <strong>of</strong> a number<br />

<strong>of</strong> publications, such as the layout <strong>of</strong> a schools’ information pack<br />

on behalf <strong>of</strong> the Sustainable Environment section within Technical<br />

Services.<br />

Governance<br />

The <strong>City</strong>’s governance program aims to strengthen the organisation<br />

in its ability to meet its statutory obligations and ensure a well run<br />

and administered <strong>City</strong>. As part <strong>of</strong> the governance program 14<br />

Councillor Workshops were held during the year. These workshops<br />

were opportunities to brief Councillors on emerging issues, such as<br />

changes to legislation. The workshops included presentations on<br />

a range <strong>of</strong> matters, such as local government structural reform, the<br />

State Government’s Integrated Planning Framework and the State<br />

Government’s Public Transport Strategy for Perth.<br />

In October 2011, the independent panel set up by the State<br />

Government to review the structure <strong>of</strong> local government in<br />

metropolitan Perth, released an issues paper seeking a response<br />

to 24 questions covering local government governance and the<br />

challenges facing metropolitan Perth.<br />

This was followed in April 2012 by a paper setting out the panel’s<br />

draft findings. The <strong>City</strong> was one <strong>of</strong> a number <strong>of</strong> local governments<br />

that responded to both <strong>of</strong> these papers. The <strong>City</strong>’s responses are<br />

available on its web site: www.bayswater.wa.gov.au. It is likely<br />

that the State Government will announce the outcome <strong>of</strong> the local<br />

government review in 2012-13.<br />

The governance team was also involved in supporting the <strong>City</strong><br />

<strong>of</strong> <strong>Bayswater</strong>’s local government election held in October 2011.<br />

The election was undertaken by postal vote administered by the<br />

Western Australian Electoral Commission, with five seats contested<br />

in the four wards and a participation rate <strong>of</strong> 26.32 per cent <strong>of</strong><br />

voters.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

7


The <strong>City</strong>’s new minutes and agenda s<strong>of</strong>tware system<br />

(Minute Manager) was rolled out during 2011-12. The new<br />

system streamlined the agenda and report preparation<br />

process and it is also compatible with the <strong>City</strong>’s Dataworks<br />

Document Management System.<br />

Integrated Planning Framework<br />

During 2011-12, work began to develop a range <strong>of</strong> strategic<br />

documents to meet the <strong>City</strong>’s obligations under the State<br />

Government’s Strategic Planning Framework initiative. This<br />

initiative involves developing the <strong>City</strong>’s 10-year Strategic<br />

Community Plan, Asset Management Plan, Workforce Plan<br />

and Long-term Financial Plan. As part <strong>of</strong> the preparatory<br />

work there was an enhanced focus on corporate business<br />

planning within the organisation and in addition, a<br />

community perceptions survey was commissioned, with the<br />

outcome <strong>of</strong> that survey to be reported to Council in early<br />

2012-13.<br />

Advocacy<br />

As part <strong>of</strong> the <strong>City</strong>’s advocacy program a number <strong>of</strong> briefing<br />

sessions were held throughout the course <strong>of</strong> the year<br />

to lobby both State and Federal politicians in support <strong>of</strong><br />

the <strong>City</strong>’s priorities. The briefings covered proposals for<br />

the redevelopment <strong>of</strong> the Mertome Retirement Village;<br />

expansion <strong>of</strong> the <strong>Bayswater</strong> Hostel to provide an ageing<br />

in place facility; the Morley <strong>City</strong> Centre Master Plan;<br />

redevelopment <strong>of</strong> the Les Hansman Community Centre; a<br />

wide range <strong>of</strong> environmental programs; and the allocation<br />

<strong>of</strong> funding from the State’s landfill levy towards a number <strong>of</strong><br />

waste management projects.<br />

8<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Administration &<br />

Community Services<br />

Events<br />

The <strong>City</strong>’s program <strong>of</strong> free-to-enter community events provides a number <strong>of</strong><br />

opportunities to bring the local community together and celebrate their way <strong>of</strong><br />

life in the <strong>City</strong>.<br />

Events that the <strong>City</strong> contributed towards during 2011-12 included:<br />

Scholarship Program and Presentation Evening June/July 2011<br />

<strong>Annual</strong> Art Awards and Exhibition September/October 2011<br />

North <strong>of</strong> Perth Music Festival September 2011<br />

Dance Festival October 2011<br />

North <strong>of</strong> Perth Music Festival Winners Concerts October 2011<br />

Early Settlers Civic Luncheon November 2011<br />

Feature in the Amphitheatre November 2011<br />

Volunteers Christmas Luncheon December 2011<br />

Christmas Lights and Garden Awards December 2011<br />

Australia Day Community BBQ January 2012<br />

Feature in the Park March 2012<br />

Autumn River Festival April 2012<br />

Volunteers Function May 2012<br />

June Community Concert June 2012<br />

In addition, seven Citizenship Ceremonies were held over the course <strong>of</strong><br />

2011-12 with around 60 new citizens attending each event.<br />

Avon Descent:<br />

Celebrating its 39th year, the Avon Descent Finish Line<br />

event once again proved to be very popular and close<br />

to 8,000 spectators and support crews made their<br />

way down to Riverside Gardens in <strong>Bayswater</strong> to<br />

cheer on the competitors. The day was filled with lots<br />

<strong>of</strong> family entertainment and great action on the river.<br />

Art Awards:<br />

The <strong>City</strong>’s Art Awards was once again held<br />

at the<br />

Noranda Shopping Village. The exhibition included 115<br />

pieces <strong>of</strong> artwork from a wide range <strong>of</strong> artists<br />

- from hobbyists<br />

to pr<strong>of</strong>essionals. The winner <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> Open Award<br />

was Carmen McFaull with her piece entitled, ‘Time Waits for No Man’.<br />

Autumn River Festival:<br />

The ever popular Autumn River Festival enticed over 6,000 people down<br />

to the <strong>Bayswater</strong> Riverside Gardens to enjoy all the event had to <strong>of</strong>fer<br />

and celebrate the <strong>City</strong>’s association with the Swan River. The event<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

9


featured attractions suitable for<br />

people <strong>of</strong> all ages, with activities<br />

and entertainment including petting<br />

farms, face painting, bouncy<br />

castles, craft activities and monster<br />

balls and chess sets.<br />

Community Services<br />

YAC<br />

The Youth Advisory Committee<br />

(YAC) is a forum for local young<br />

people, aged 12-25, to have a<br />

voice in their community, plan<br />

events and activities for young<br />

people and for Council to find out<br />

what is important to them.<br />

During the year, YAC coordinated a<br />

series <strong>of</strong> youth events including:-<br />

1. 2012 Sound Overload Battle<br />

<strong>of</strong> the Bands competition<br />

In its second year, Sound<br />

Overload 2012 invited young<br />

music groups from across Perth<br />

to play in front <strong>of</strong> a live audience<br />

with the chance to win cash and<br />

prizes, including: studio recording<br />

time and a photo shoot. The top<br />

three bands went through to the<br />

grand final held in June 2012 at<br />

the Morley Sport and Recreation<br />

Centre, with duo ‘Reilly and Chris’<br />

claiming first place.<br />

2. Urban Art Project<br />

The urban art workshop series,<br />

organised in conjunction with the<br />

Public Transport Authority, was<br />

held at the Morley Library and<br />

the Les Hansman Community<br />

Centre over a three day period in<br />

July 2011. Participants learnt the<br />

basics <strong>of</strong> urban art design. The<br />

completed art is now on display<br />

at The RISE in the Maylands<br />

Library’s Youth Area.<br />

3. Youth Photographic<br />

Competition and Workshop<br />

The <strong>City</strong> was successful in<br />

obtaining grant funding for<br />

a new initiative to celebrate<br />

National Youth Week in April<br />

2012. Photographic workshops<br />

were held during the April school<br />

holidays and provided young<br />

people with the opportunity to<br />

learn a new skill, and express<br />

their ideas and creativity.<br />

Following the workshops,<br />

participants had the opportunity<br />

to show others “their world”<br />

through photographic images,<br />

which were displayed in The<br />

RISE foyer. The competition<br />

was judged on creativity,<br />

interpretation and technical<br />

quality in four categories -<br />

Community, Faces, Being Young<br />

and Family.<br />

The <strong>City</strong> recognises and values the<br />

important role that young people<br />

play in the community and seeks<br />

to partner with others to develop<br />

sustainable initiatives to support<br />

young people in reaching their full<br />

capacity. Two examples <strong>of</strong> these<br />

programs during 2011-12 included:<br />

YouthCARE<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> continued<br />

it’s partnership with YouthCARE<br />

to help fund Chaplaincy school<br />

programs in the local <strong>Bayswater</strong><br />

area. The <strong>City</strong> has supported<br />

YouthCARE since 2001 and<br />

YouthCARE now provides services<br />

to two high schools and five<br />

primary schools.<br />

Outcare<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> provided<br />

funding to Outcare for two<br />

programs for young people<br />

in our community, including:<br />

a mentoring program at Weld<br />

Square Primary School that aims<br />

to improve respect, self discipline,<br />

responsibility and leadership <strong>of</strong> the<br />

students along with a Certificate in<br />

Hospitality Management for youth<br />

considered at risk.<br />

Volunteers<br />

The <strong>City</strong> has over 200 volunteers<br />

supporting it’s program to deliver<br />

vital services that enhance the<br />

quality <strong>of</strong> life for many residents<br />

within the community. These<br />

services include Meals on Wheels,<br />

Justice <strong>of</strong> the Peace, Books on<br />

Wheels and driving the community<br />

The Sound Overload Battle<br />

<strong>of</strong> the Bands competition<br />

is coordinated by the <strong>City</strong>’s<br />

Youth Advisory Committee<br />

10<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


uses. During International<br />

Volunteer Day in December and<br />

Volunteer Week in May, the <strong>City</strong><br />

held functions to acknowledge the<br />

contributions <strong>of</strong> the volunteers.<br />

Community Bus Service<br />

The <strong>City</strong>, with the support <strong>of</strong><br />

volunteer bus drivers, provides a<br />

community bus hire service. The<br />

<strong>City</strong> has three community buses<br />

that are available for use by not for<br />

pr<strong>of</strong>it organisations and community<br />

groups.<br />

Senior Citizen Centres<br />

The <strong>City</strong> operates three Senior<br />

Citizens Centres, which are<br />

located in <strong>Bayswater</strong>, Morley<br />

and Maylands. All three Centres<br />

are managed by an incorporated<br />

Executive Management Committee<br />

along with the support from a part<br />

time <strong>City</strong> <strong>of</strong>ficer.<br />

The 500 plus members <strong>of</strong> the<br />

three centres enjoyed a variety<br />

<strong>of</strong> activities and also participated<br />

in trips and outings with the <strong>City</strong><br />

providing financial support <strong>of</strong><br />

$2,000 to each centre.<br />

A subsidised community based<br />

podiatry service was provided at<br />

the three centres and was available<br />

to seniors on a low income. A<br />

hairdressing service was also<br />

available at the <strong>Bayswater</strong> and<br />

Morley Senior Citizen Centres.<br />

In March 2012, the <strong>City</strong> received<br />

grant funding to conduct a<br />

Neighbour Day morning tea at<br />

Mertome Village and the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> Hostel. Know Your<br />

Neighbour Day was established as<br />

a focus to draw attention to people<br />

in the community who may be<br />

isolated and lonely.<br />

The Maylands Autumn Centre<br />

celebrated 50 years by hosting a<br />

family fun open day in May 2012.<br />

Community Housing Program<br />

The <strong>City</strong>, in joint venture with the<br />

Department <strong>of</strong> Housing, manages<br />

10 units in the community housing<br />

program. Many <strong>of</strong> the units have<br />

long standing tenants.<br />

Home and Community Care<br />

Home and Community Care<br />

(HACC) provides a range <strong>of</strong><br />

services to older people and<br />

people with disabilities, and their<br />

carers within the community.<br />

Services available to eligible<br />

residents included domestic<br />

assistance, social support, day<br />

centres, meals on wheels, meal<br />

preparation, community transport<br />

and assistance with advocacy and<br />

information.<br />

The <strong>City</strong> has increased support<br />

to eligible residents with the<br />

introduction <strong>of</strong> the Pets and<br />

Wellbeing Program (PAWS), the<br />

weekend drop in centre at Olive<br />

Tree House and the BLIS program<br />

at The RISE.<br />

A Funky Friday monthly disco for<br />

younger people with disabilities<br />

has continued to grow for clients<br />

at Olive Tree House. The disco<br />

provides an opportunity for people<br />

with disabilities, their family, friends<br />

and carers to socialise and enjoy a<br />

variety <strong>of</strong> activities.<br />

In April 2012, the <strong>City</strong> relocated<br />

the BLIS program for people with<br />

disabilities to the Youth Wing at<br />

The RISE. This new location has<br />

facilitated opportunity for clients<br />

to participate within an inclusive<br />

environment in activities such as<br />

the health club, group fitness,<br />

sports hall and library.<br />

The Meals on Wheels program<br />

provided freshly prepared two<br />

course hot and nutritional balanced<br />

meals to those people in the<br />

community who are unable to cook<br />

for themselves. Over 31,000 meals<br />

were delivered by a team <strong>of</strong> 50<br />

dedicated volunteers throughout<br />

the year to eligible clients<br />

needing support to continue living<br />

independently at home.<br />

Members <strong>of</strong> the Maylands<br />

Autumn Centre celebrating the<br />

Centre’s 50th year.<br />

In November 2011, the <strong>City</strong><br />

was recognised as a finalist<br />

in the category for Health and<br />

Wellbeing for the BLIS program<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

11


and the Wellness in the Kitchen program at the National Disability Awards in<br />

Canberra.<br />

HACC Service<br />

Total Services Hours<br />

Domestic Assistance 6,361<br />

Meal Preparation 1,056<br />

Adult Day Centre 13,286<br />

<strong>Bayswater</strong> Leisure Information Service (BLIS) 9,716<br />

Transport 11,138<br />

Social Support 4,556<br />

Meals on Wheels 23,136<br />

Counselling 2,937<br />

The <strong>City</strong>’s HACC program underwent a quality review audit in March 2012,<br />

with all key outcomes being met in each <strong>of</strong> three standards.<br />

Library Services<br />

The 2011-12 financial year was an exciting period for the <strong>City</strong>’s Library<br />

Service. The year saw the opening <strong>of</strong> a new library, the implementation <strong>of</strong><br />

a free Wi-Fi service and a large increase in the number <strong>of</strong> people attending<br />

activity programs.<br />

On 5 July 2011, after 23 years <strong>of</strong> service to the community, the much loved<br />

library housed in the old Maylands Hall was decommissioned and moved to<br />

its modern new home in The RISE. The new library, which opened on 18 July<br />

2011, features modern attractive furniture, a patron self check-out kiosk, a free<br />

Wi-Fi service and 14 internet enabled public use computers. The library also<br />

incorporates purpose-designed areas for activity sessions. These areas are<br />

utilised by young adults and children.<br />

The new Maylands Library has proven to be very popular, with patron visits<br />

up 39.5 per cent, attendance at children’s events up 51 per cent and items<br />

borrowed up 25 per cent.<br />

Maylands Library<br />

Patron Visits<br />

Items Borrowed<br />

120000<br />

120000<br />

100000<br />

100000<br />

80000<br />

80000<br />

60000<br />

60000<br />

40000<br />

40000<br />

20000<br />

20000<br />

0<br />

Year 07-08 08-09 09-10 10-11 11-12<br />

0<br />

Year 07-08 08-09 09-10 10-11 11-12<br />

Activity Sessions<br />

Of special note during the financial year was the success <strong>of</strong> the various<br />

activity session programs that support the “Life Long Learning” service<br />

philosophy. Attendance at sessions have been growing steadily for several<br />

years, but this year’s increase <strong>of</strong> 3,665 or 28.1 per cent, demonstrated their<br />

increasing popularity within the community.<br />

12<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Free Wi-Fi Service<br />

The <strong>City</strong>’s Library Service continued to embrace the eLibrary concept.<br />

During 2011-12, free internet enabled Wi-Fi services were implemented at<br />

both the Gerry Leeuwangh (Morley) and Maylands Libraries. By the end<br />

<strong>of</strong> the financial year, around 50 to 60 users were logging on to the service<br />

each week. Infrastructure that will allow this service to be expanded to the<br />

<strong>Bayswater</strong> Library was installed in June 2012, with an estimated launch date<br />

<strong>of</strong> late August 2012.<br />

Library Services - Summary <strong>of</strong> Key Performance Indicators<br />

Indicator<br />

Usage<br />

2011-12<br />

Variation<br />

Items loaned 427,000 up 0.5%<br />

Patron visits 339,000 up 3.9%<br />

Children’s & adult<br />

activity session<br />

attendances<br />

Membership<br />

applications<br />

Onsite Internet/PC Service<br />

16,700 up 28.1%<br />

5,200 up 19.7%<br />

Hours <strong>of</strong> use 48,650 up 4.7%<br />

No. sessions 73,000 up 11%<br />

Comment<br />

An average <strong>of</strong> 1,570<br />

loans per day<br />

An average <strong>of</strong> 1,250<br />

visits per day<br />

As at 30/06 2012<br />

memberships totalled<br />

27,252<br />

An average <strong>of</strong> 180 hours<br />

per day<br />

An average <strong>of</strong> 270<br />

sessions per day<br />

Ranger Services<br />

Ranger Services deal with customer requests and administer laws relating to<br />

specific legislation in order to maintain and improve community safety.<br />

Rangers also act as “Eyes on the Street” and report any illegal activity to<br />

police.<br />

Parking Program<br />

During 2011-12, rangers continued to focus on managing illegal parking within<br />

the city. The program has been expanded from school parking monitoring to<br />

include providing a high priority response to vehicles obstructing footpaths.<br />

The program will be further expanded in 2012-13 to include training <strong>of</strong> the<br />

<strong>City</strong>’s outside staff to monitor and report vehicles parking on or over footpaths,<br />

as well as educating drivers <strong>of</strong> their responsibilities through features in the<br />

media.<br />

Security Watch Service<br />

The Security Watch Services responds to requests for assistance from<br />

residents and the service’s vehicles patrol the streets around the clock, seven<br />

days a week. As part <strong>of</strong> their role, Security Officers also provide assistance to<br />

the rangers, report any graffiti observed, assist the local police when required<br />

and upon request, will check the premises <strong>of</strong> residents who are on holiday.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

13


Holiday Watch Program<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> currently provides a patrol service where residents can<br />

register their address when they are away on holidays. To provide additional<br />

peace <strong>of</strong> mind for residents, Security Officers will patrol the street.<br />

24 Hour Security Patrols<br />

The <strong>City</strong> has 11 Security Officers that patrol our streets seven days a weeks,<br />

24 hours per day. This means that at any point in time there can be up to four<br />

Security Officers acting as Eyes on our Streets.<br />

Security Appraisals<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> Security Service provides a direct customer program<br />

that aims to assist our community to improve their security.<br />

The program provides easy to access information about a large range<br />

<strong>of</strong> products and services available from various government and nongovernment<br />

agencies.<br />

Residents are encouraged to contact the Ranger and Security Services to<br />

express their interest in participating in the program.<br />

Customer Requests<br />

In 2011-12, Rangers and Security Services investigated 11,500 requests for<br />

assistance from our community.<br />

During the year, 320 impounded dogs were returned to their owners and a<br />

further 76 were found new homes.<br />

The following is a break down <strong>of</strong> the customer requests received by Ranger<br />

and Security Services from 2008-09 to 2011-12:<br />

Ranger Customer<br />

Requests<br />

2008-09 2009-10 2010-11 2011-12<br />

Dogs 791 772 960 960<br />

Abandoned Vehicles 365 285 491 425<br />

Bush Fire Control 31 27 47 186<br />

Parking Control 721 672 968 1161<br />

Security Customer<br />

Requests<br />

2008-09 2009-10 2010-11 2011-12<br />

Security Watch Property 851 751 901 1008<br />

Security Watch Persons 795 838 1000 1057<br />

Security Watch Damage 153 526 747 449<br />

Disturbance 206 204 176 121<br />

Vehicles / Traffic 199 190 296 584<br />

Requests 202 531 721 837<br />

Graffiti - 782 3480 3733<br />

14<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

The <strong>City</strong>’s events program<br />

provides something for<br />

people <strong>of</strong> all ages.


Recreation Facilities<br />

<strong>Bayswater</strong> Waves<br />

Perth’s premier indoor aquatic<br />

playground, <strong>Bayswater</strong> Waves’<br />

mission is to enrich community<br />

life and enhance the wellbeing <strong>of</strong><br />

people <strong>of</strong> all ages, particularly the<br />

residents <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong>,<br />

by providing high quality leisure<br />

facilities and services.<br />

During the year, <strong>Bayswater</strong> Waves<br />

received a gold certificate from the<br />

Water Corporation in recognition<br />

<strong>of</strong> its work to reduce water use by<br />

over 35 per cent compared to 2007<br />

levels.<br />

The facility also received a<br />

delegation <strong>of</strong> government<br />

representatives from South East<br />

Asia that toured Perth looking<br />

at recreation facilities to obtain<br />

ideas for future facilities in their<br />

respective countries.<br />

Several capital works projects<br />

were undertaken to improve the<br />

facilities at <strong>Bayswater</strong> Waves and<br />

enhance the programs available at<br />

the Centre. Swim school platforms<br />

that allowed for a greater number<br />

<strong>of</strong> enrolments, alterations to the<br />

group fitness studio and a store<br />

room have allowed for increased<br />

fitness class sizes and the creation<br />

<strong>of</strong> a health suite.<br />

A grant <strong>of</strong> approximately $150,000<br />

was awarded to the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> for the purpose <strong>of</strong><br />

reducing carbon emissions at<br />

<strong>Bayswater</strong> Waves. This grant<br />

will be used over the next<br />

two financial years to reduce<br />

energy consumption <strong>of</strong> the pool<br />

circulation pumps and lighting.<br />

Once installed, the equipment is<br />

expected to achieve approximately<br />

$100,000 worth <strong>of</strong> savings<br />

annually.<br />

36,000 individual attendances<br />

recorded. The facility is extremely<br />

popular with families with young<br />

children and during the summer<br />

the facility promoted five family fun<br />

days attracting over 2,771 visits. In<br />

addition, the facility hosted birthday<br />

parties attended by a total <strong>of</strong><br />

11,567 people.<br />

The facility opened one week<br />

later than usual as a result <strong>of</strong> the<br />

police utilising the foreshore and<br />

car park for operations relating<br />

to the Commonwealth Heads <strong>of</strong><br />

Government Meeting (CHOGM).<br />

The RISE<br />

The RISE opened with an<br />

extremely successful community<br />

open day on 16th July 2011, which<br />

saw the <strong>of</strong>ficial opening taking<br />

place by Mayor Terry Kenyon, the<br />

Hon Stephen Smith MLA and the<br />

Hon Donna Faragher MLC.<br />

The facility has been very well<br />

attended in its first year, with<br />

over 500 fitness memberships,<br />

three different successful sporting<br />

competitions and the library being<br />

significantly busier than anticipated.<br />

The function room commenced<br />

operations with the mayoral dinner<br />

in October 2011 and steadily<br />

became busier throughout the<br />

remainder <strong>of</strong> the year recording<br />

around 183 individual bookings in<br />

the final six months <strong>of</strong> the financial<br />

year.<br />

The central feature <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> Christmas celebrations<br />

was located at The RISE during<br />

December. The snow dome<br />

attracted 2,122 people during the<br />

month and assisted in securing a<br />

large number <strong>of</strong> food donations<br />

from the public towards the annual<br />

Christmas food appeal.<br />

Maylands Waterland<br />

This popular outdoor aquatic<br />

facility operated from 5 November<br />

2011 until 30 April 2012, with over<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

15


The <strong>City</strong>’s free to enter Autumn<br />

River Festival 2012 provided a<br />

great family day out<br />

Recreation Services<br />

Skate Events<br />

Wotton Skate Park hosted the ninth<br />

annual Boomshanka skate and<br />

BMX event in March 2012, which<br />

provided an opportunity for local<br />

youth to compete in skate, scooter<br />

and BMX competitions.<br />

Playground Replacements<br />

The <strong>City</strong> invested $180,000 in<br />

playground maintenance and<br />

renewals. Local playgrounds were<br />

replaced at Deschamp Reserve,<br />

Charles Street, Bath Street,<br />

Moses Saunders and Emberson<br />

Reserves. All playgrounds are<br />

regularly inspected and maintained<br />

to ensure compliance with industry<br />

standards.<br />

Club Development Initiatives<br />

The <strong>City</strong> received $150,000 grant<br />

funding from the Department <strong>of</strong><br />

Sport and Recreation to deliver<br />

a club development program in<br />

conjunction with the <strong>City</strong> <strong>of</strong> Swan<br />

over a three year period. The club<br />

development program assists clubs<br />

to adopt policies and practices<br />

that contribute to their longer term<br />

success. A range <strong>of</strong> workshops<br />

and information sessions have<br />

been delivered to inform and<br />

update clubs on key topic areas,<br />

such as governance, social media<br />

networking, sponsorship and<br />

financial management.<br />

The <strong>City</strong> received an additional<br />

$55,000 from the Department <strong>of</strong><br />

Sport and Recreation to deliver the<br />

KidSport program to allow up to<br />

200 eligible children between the<br />

ages <strong>of</strong> 5 - 18 years to apply for a<br />

financial contribution towards club<br />

joining fees.<br />

Capital Improvements<br />

An investment <strong>of</strong> $39,000 was<br />

made at Noranda Sports Complex<br />

to resurface three outdoor tennis<br />

courts and additional fencing was<br />

installed at Wotton Reserve to<br />

provide a perimeter fence around<br />

the soccer pitch to meet amended<br />

league requirements.<br />

Community Leases<br />

Council approved 19 lease<br />

agreements with community<br />

not-for-pr<strong>of</strong>it organisations for<br />

the ongoing use <strong>of</strong> buildings and<br />

facilities.<br />

Seasonal Bookings<br />

The <strong>City</strong> assisted over 75 sporting<br />

clubs and organisations to access<br />

a broad range <strong>of</strong> sports facilities<br />

across the <strong>City</strong>.<br />

The Gym at the<br />

<strong>Bayswater</strong> Waves<br />

Aquatic Centre<br />

16<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Technical Services<br />

Engineering<br />

The Engineering Section continued<br />

to maintain and construct a wide<br />

range <strong>of</strong> assets to improve the<br />

<strong>City</strong>’s amenity and infrastructure in<br />

2011-12. More than $3.46 million<br />

was spent on road infrastructure<br />

works, while a further $2.4 million<br />

was invested in operational<br />

maintenance for engineering<br />

works, including street lighting,<br />

street sweeping, bus shelters,<br />

graffiti removal, signs, roads,<br />

drains, paths and kerbing.<br />

Construction<br />

One <strong>of</strong> the major projects for<br />

2011-12 was the design and<br />

construction <strong>of</strong> the on and <strong>of</strong>f street<br />

car parks and associated path<br />

works surrounding The RISE in<br />

Maylands. The car park design<br />

included a water sensitive urban<br />

design, incorporating swales and<br />

an industry first, permeable ‘water<br />

sensitive’ asphalt surfacing to<br />

improve infiltration and limit storm<br />

water run<strong>of</strong>f.<br />

The <strong>City</strong> also installed a floating<br />

jetty alongside the Claughton<br />

Reserve boat ramp in <strong>Bayswater</strong><br />

at a cost <strong>of</strong> $193,032. This was<br />

co-funded by the Department <strong>of</strong><br />

Transport. The jetty allows for<br />

safer access for boating along the<br />

Swan River.<br />

Road and Footpath<br />

Improvements<br />

The <strong>City</strong> has continued to replace<br />

its network <strong>of</strong> slab footpaths with<br />

concrete, in order to improve<br />

amenity, eliminate trip hazards and<br />

reduce maintenance costs.<br />

The <strong>City</strong> resurfaced 11.4 kilometres<br />

<strong>of</strong> road in 2011-12 to ensure the<br />

road network remained at a high<br />

quality standard for motorists and<br />

cyclists. Roads resurfaced during<br />

the year included:<br />

q Beechboro Road from<br />

Benara Road to Wandoo<br />

Road;<br />

q Railway Parade West from<br />

Grand Promenade to Central<br />

Avenue;<br />

q Railway Parade from<br />

Beechboro Road South to<br />

Bassendean Road; and<br />

q Emberson Road from Benara<br />

Road to Spruce Road.<br />

The right <strong>of</strong> way (ROW) upgrading<br />

program continued this year with<br />

the construction and sealing <strong>of</strong> the<br />

ROWs between Morrison Street/<br />

Ferguson Street and Morrison<br />

Street/Caledonian Avenue,<br />

Maylands.<br />

Miscellaneous Works<br />

As part <strong>of</strong> Council’s commitment to<br />

safety and security, regular three to<br />

four monthly inspections <strong>of</strong> street<br />

lights were undertaken and any<br />

faults reported directly to Western<br />

Power for repair.<br />

This financial year also saw the<br />

continuation <strong>of</strong> the program <strong>of</strong><br />

upgrading all street signs in the<br />

<strong>City</strong> to the new reflective standard.<br />

The new signs will be clearer<br />

during the day and at night.<br />

The maintenance teams, along<br />

with their regular scheduled works,<br />

attended to 620 customer requests<br />

this year. The <strong>City</strong>’s crossover and<br />

verge bond section dealt with over<br />

1,200 verge bond inspections and<br />

the construction <strong>of</strong> 260 crossovers.<br />

Traffic Management<br />

Education <strong>of</strong> driver behaviour<br />

has been a key focus with<br />

speed advisory trailers rotated<br />

throughout the <strong>City</strong> at schools<br />

and arterial roads. This visual<br />

presence received positive<br />

feedback from many sections<br />

<strong>of</strong> the community and local<br />

Police. All traffic concerns are<br />

investigated in accordance with the<br />

<strong>City</strong>’s Traffic Management Policy<br />

and Guidelines, utilising traffic<br />

classifiers to measure vehicle<br />

volumes and speeds.<br />

Graffiti Removal<br />

In 2011-12, there were 4,415<br />

incidents <strong>of</strong> removed graffiti at<br />

a total cost <strong>of</strong> $170,277, or $39<br />

per incident. This represents an<br />

increase over 2010-11 (3,922).<br />

However, the cost <strong>of</strong> attending<br />

to each incident fell by $5 per<br />

instance.<br />

The dedicated graffiti removal team<br />

track known hotspots to ensure<br />

graffiti is removed prior to receiving<br />

reports from the public and the<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

17


<strong>City</strong>’s Rangers and Security<br />

Services. The rapid removal <strong>of</strong><br />

graffiti is an important component<br />

<strong>of</strong> discouraging repeat graffiti<br />

<strong>of</strong>fenders.<br />

Green Fleet Vehicles<br />

The <strong>City</strong> now has six hybrid low<br />

carbon emission vehicles within<br />

its fleet. A hybrid vehicle is also<br />

being trialed as part <strong>of</strong> the Security<br />

Watch fleet and is showing a<br />

reduction <strong>of</strong> up to 40 per cent<br />

in fuel consumption and carbon<br />

emissions.<br />

Geographic Services<br />

In 2011-12, the <strong>City</strong> released its<br />

new Adobe Flash Player version<br />

<strong>of</strong> the online Interactive <strong>City</strong><br />

Maps mapping application. The<br />

application is very responsive<br />

and provides users <strong>of</strong> the site<br />

with simple property search<br />

tools to access a variety <strong>of</strong><br />

services, including: town planning<br />

information, building and<br />

development application status,<br />

archived aerial imagery and waste<br />

collection times. It was released on<br />

9 November 2011 and has been<br />

very well utilised.<br />

In addition, the <strong>City</strong> was a finalist<br />

in the Department <strong>of</strong> Finance<br />

and Deregulations “Excellence<br />

in eGovernment Awards 2012”<br />

for its development work on the<br />

Interactive <strong>City</strong> Maps application.<br />

To access the mapping application,<br />

go to www.bayswater.wa.gov.au<br />

and follow the online mapping portal<br />

links.<br />

During the year, data in relation to<br />

23,000 verge trees was uploaded<br />

into the <strong>City</strong>’s spatial environment.<br />

Information captured for each tree<br />

included location, botanic name,<br />

common name, height, health,<br />

age, aesthetics and more. The<br />

information captured aids in the<br />

management <strong>of</strong> the <strong>City</strong>’s tree<br />

assets and this register will be<br />

audited at regular intervals and<br />

made available for operational use.<br />

The <strong>City</strong> also released the 2011<br />

edition <strong>of</strong> its mapping atlas. This<br />

edition contains detailed street<br />

layouts, footpath networks, parks<br />

information and some general<br />

demographic information about the<br />

locality. It comes in A4 or A3 size<br />

booklets and can be purchased at<br />

the Civic Centre.<br />

Waste Management<br />

The <strong>City</strong>’s total expenditure on<br />

waste management collection for<br />

2011-12 was approximately $8.45<br />

million.<br />

The existing waste management<br />

service provided by the <strong>City</strong><br />

incorporates the following<br />

components:<br />

q Weekly 240 litre bin for<br />

general waste;<br />

q Fortnightly 240 litre bin for<br />

co-mingled recyclables;<br />

q Fortnightly 240 litre bin for<br />

green waste;<br />

q Up to three bulk bins or<br />

tip passes per residential<br />

property every year;<br />

q Free refrigerator collection for<br />

residents;<br />

q Free oil disposal (up to<br />

20 litres) for residents<br />

(non-commercial);<br />

q Household hazardous<br />

collection days; and<br />

q Dry cell battery, mobile phone<br />

and compact fluorescent<br />

lamp disposal.<br />

General Household Waste<br />

The <strong>City</strong>’s contractor collected<br />

more than 27,913 tonnes <strong>of</strong><br />

general household waste during<br />

the year from 28,223 residential<br />

premises and 1,043 commercial<br />

premises. The total waste<br />

collected represents an increase <strong>of</strong><br />

1.62 per cent or 453 tonnes over<br />

the previous year.<br />

Co-mingled Recycling<br />

In 2011-12, the quantity <strong>of</strong> comingled<br />

recyclables collected from<br />

the yellow top bins <strong>of</strong> domestic<br />

premises included:<br />

Recyclable<br />

Materials<br />

Tonnes<br />

Recycled<br />

Newspaper 2603<br />

Cardboard 260<br />

Mixed paper 516<br />

Glass 336<br />

PET plastic 42<br />

HDPE plastic 57<br />

Other plastic 36<br />

Steel cans 66<br />

Aluminium cans 31<br />

Bulk steel 33<br />

The co-mingled material is<br />

sorted at the material recovery<br />

facility operated by Transpacific<br />

Cleanaway on <strong>City</strong> owned land<br />

in Collier Road, <strong>Bayswater</strong>. All<br />

<strong>of</strong> the recovered material is then<br />

sold to companies within Australia<br />

for processing or export to plants<br />

overseas to be remanufactured into<br />

various products.<br />

The <strong>City</strong> receives a royalty for each<br />

tonne <strong>of</strong> material that is processed<br />

through the material recovery<br />

facility.<br />

Green Waste<br />

More than 4,856 tonnes <strong>of</strong><br />

green waste was collected from<br />

residents during 2011-12. This<br />

is an increase <strong>of</strong> 10.3 per cent<br />

or 501 tonnes over 2010-11. The<br />

collected material was delivered to<br />

the Eastern Metropolitan Region<br />

Council landfill facility at Red Hill,<br />

where it was treated to produce soil<br />

conditioner and mulch.<br />

Bulk Bin Service<br />

The bulk bin service continued<br />

to be extremely popular with<br />

householders, with each household<br />

entitled to up to three bulk bins<br />

every year.<br />

18<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


In 2011-12, more than 21,037 bulk<br />

bins were delivered comprising<br />

10,723 week day bulk bin orders<br />

and 10,072 weekend orders.<br />

A total <strong>of</strong> 4,987 cubic metres <strong>of</strong><br />

waste was collected through the<br />

bulk bin system and taken to<br />

landfill.<br />

The bulk bin system eliminates the<br />

need for unsightly verge collections<br />

and the problem <strong>of</strong> wind blown<br />

litter. Also, it is more convenient for<br />

residents to order bins when they<br />

are needed.<br />

Tip Passes<br />

Residents have the option <strong>of</strong><br />

ordering up to three bulk bins<br />

or alternatively they can receive<br />

three tip passes for the <strong>Bayswater</strong><br />

Transfer Station. During 2011-<br />

12, more than 10,723 tip passes<br />

were issued. Most tip passes (52<br />

per cent) were generated from<br />

the <strong>City</strong>’s Galleria <strong>of</strong>fice with the<br />

remainder (48 per cent) from the<br />

Civic Centre.<br />

Customer Service Requests<br />

Residents who experience<br />

problems with any <strong>of</strong> their bins can<br />

request a repair or replacement<br />

from the <strong>City</strong>. These requests are<br />

logged electronically and the total<br />

service requests for the year were<br />

5,421.<br />

The <strong>City</strong>’s agreement with its waste<br />

contractor, Transpacific Cleanaway,<br />

ensures that service requests are<br />

dealt within one to two working<br />

days.<br />

Refrigerator Collection<br />

Program<br />

The <strong>City</strong> provides a free refrigerator<br />

collection service for residents.<br />

During the year there were 519<br />

requests for refrigerators to be<br />

collected. The refrigerators were<br />

taken to the <strong>Bayswater</strong> Transfer<br />

Station where they were de-gassed<br />

and recycled for scrap metal.<br />

Environmental Health<br />

Immunisation Program<br />

In 2011-12, the <strong>City</strong> conducted free<br />

immunisation clinics each Monday,<br />

on a rotational basis, at <strong>Bayswater</strong>,<br />

Morley, Hampton Park and<br />

Noranda Child Health clinics. An<br />

immunisation clinic was also held<br />

on the second Wednesday <strong>of</strong> each<br />

month at The RISE, Maylands.<br />

Due to the popularity <strong>of</strong> this clinic,<br />

from March 2012 Council provided<br />

an additional clinic at The RISE<br />

held on the last Wednesday <strong>of</strong><br />

each month.<br />

In March 2012, the <strong>City</strong>’s<br />

<strong>Bayswater</strong> Child Health Clinic<br />

relocated to rooms situated at<br />

the rear <strong>of</strong> the <strong>Bayswater</strong> Library.<br />

This has created a larger area for<br />

families attending the clinic.<br />

The clinics have proven to be<br />

very popular with parents who<br />

have a child under the age <strong>of</strong><br />

five who require vaccinations.<br />

Since the commencement <strong>of</strong> the<br />

immunisation program, numbers<br />

have continued to increase<br />

steadily. This year there were<br />

1,438 babies vaccinated which<br />

equates to 2,962 vaccines given at<br />

the <strong>City</strong>’s clinics, this is an increase<br />

<strong>of</strong> 134 babies vaccinated over the<br />

previous year.<br />

At the commencement <strong>of</strong> 2011,<br />

parents and grandparents <strong>of</strong><br />

newborn babies up to the age <strong>of</strong><br />

six months were <strong>of</strong>fered a free<br />

whooping cough vaccination.<br />

This has been popular with<br />

approximately 328 adults<br />

being vaccinated since the<br />

commencement <strong>of</strong> the program.<br />

With support from local schools,<br />

the <strong>City</strong> was able to continue to<br />

provide a school based vaccination<br />

program for 12 year olds who<br />

attend school within the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong>. This program was<br />

successful, with over 515 children<br />

vaccinated with one or more <strong>of</strong><br />

the following vaccines: Hepatitis<br />

B, diphtheria, tetanus, whooping<br />

cough, chickenpox and HPV<br />

Gardasil®. All vaccinations were<br />

administered by a doctor with<br />

the assistance <strong>of</strong> a registered<br />

nurse. Any child who misses their<br />

vaccinations at school can receive<br />

their vaccinations at any <strong>of</strong> <strong>City</strong>’s<br />

immunization clinics at no charge.<br />

Mosquito Control<br />

The mosquito control unit reported<br />

another busy year following the<br />

2010-11 mosquito season, where<br />

high numbers <strong>of</strong> mosquitoes<br />

were detected breeding in the<br />

salt marshes in Maylands and<br />

<strong>Bayswater</strong> foreshores.<br />

Other breeding sources - such as<br />

containers, blocked gutters, unused<br />

swimming pools in residential<br />

properties, as well as roadside<br />

gullies and drains - were also<br />

treated. The <strong>City</strong> meets regularly<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

19


with other local governments<br />

adjacent to the Swan River and the<br />

Department <strong>of</strong> Health to implement<br />

effective and coordinated strategies<br />

to control mosquito numbers.<br />

Food Handler Training<br />

The <strong>City</strong> held a series <strong>of</strong> free<br />

food handler training seminars<br />

throughout the 2011-12 financial<br />

year.<br />

These seminars were very popular,<br />

as they assisted food businesses<br />

in meeting their training obligations<br />

and they also helped to increase<br />

the overall standard <strong>of</strong> food<br />

hygiene within the <strong>City</strong>.<br />

The <strong>City</strong> also <strong>of</strong>fered free online<br />

Food Handler Training called<br />

“I’m Alert”. The number <strong>of</strong> people<br />

accessing this training during the<br />

course <strong>of</strong> the year increased to<br />

160.<br />

Food Surveillance<br />

Routine inspections <strong>of</strong> food<br />

premises were undertaken during<br />

the year to ensure that a high level<br />

<strong>of</strong> food hygiene is maintained. In<br />

total 1,051 inspections <strong>of</strong> food<br />

businesses were carried out to<br />

determine compliance with the<br />

Food Act 2008. The majority <strong>of</strong> the<br />

food premises were satisfactory,<br />

however 31 infringement notices<br />

were issued and four prosecutions<br />

initiated.<br />

Food Sampling<br />

Over 50 food samples were<br />

collected during 2011-12 and<br />

submitted for analysis. These<br />

samples were collected as part<br />

<strong>of</strong> routine food sampling or in<br />

response to customer complaints.<br />

Of the food samples collected, 26<br />

were found to be unsatisfactory<br />

and required follow-up action to<br />

ensure compliance with the Food<br />

Act 2008.<br />

Food Recalls<br />

The WA Department <strong>of</strong> Health<br />

notified the <strong>City</strong> <strong>of</strong> over 60 food<br />

recalls during 2011-12. The<br />

products were recalled for a variety<br />

<strong>of</strong> reasons, including the presence<br />

<strong>of</strong> foreign objects, incorrect labeling<br />

and contamination.<br />

Emergency Management<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> Local<br />

Emergency Management<br />

Committee met every three months<br />

during 2011-12 to ensure the safety<br />

<strong>of</strong> the community should there be<br />

an emergency event such<br />

as fire, flood or any other type <strong>of</strong><br />

emergency.<br />

To help facilitate community safety<br />

in the event <strong>of</strong> an emergency,<br />

during construction <strong>of</strong> The RISE in<br />

Maylands, the building was wired<br />

so that a generator can be used to<br />

provide emergency power for an<br />

evacuation centre should a disaster<br />

occur.<br />

20<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


During June 2012, there were<br />

two severe storm events that<br />

affected residents. The worst<br />

affected areas were in Morley<br />

and Dianella. Approximately a<br />

dozen residential homes and<br />

several business premises were<br />

damaged. The <strong>City</strong>’s staff provided<br />

assistance to property owners and<br />

the SES during the events and an<br />

Emergency Management Review<br />

meeting was held following these<br />

severe storm events to assess<br />

what lessons were to be learned<br />

and improve the <strong>City</strong>’s response to<br />

future incidents.<br />

Parks and Gardens<br />

Water, both potable and bore, is<br />

in very high demand by Western<br />

Australia’s rapidly growing<br />

population and expanding industry<br />

and its use for irrigation purposes<br />

is closely monitored by an<br />

increasingly interested public.<br />

During 2011-12, the <strong>City</strong> further<br />

demonstrated its commitment to<br />

water conservation by continuing<br />

its infield irrigation infrastructure<br />

replacement program. Systems<br />

were renewed at the following<br />

reserves and parks throughout<br />

the <strong>City</strong>: F J Beales, Robert<br />

Thompson, Charlwood, Chesney,<br />

Mills and Chobham.<br />

In addition to replacing irrigation<br />

pipe work, valves and sprinklers,<br />

the bores and pumps were<br />

replaced at Boxhill, Rhodes,<br />

Remembrance and Craven<br />

Reserves.<br />

Since being replaced with entirely<br />

new components, these systems<br />

are designed to use less water<br />

and be reliable and functioning to<br />

capacity for another 15 to 20 years.<br />

Irrigation maintenance and asset<br />

replacement has received a high<br />

priority to ensure the <strong>City</strong>’s highly<br />

valued ovals and landscaped areas<br />

remain at a high standard.<br />

The <strong>City</strong> continued to invest in<br />

providing high quality sporting<br />

surfaces for a diverse range <strong>of</strong><br />

user groups. Sporting facilities,<br />

including ovals, are constantly<br />

in high demand and a significant<br />

amount <strong>of</strong> effort is needed to<br />

maintain the grassed surfaces in a<br />

condition suitable for competitive<br />

sports. Accordingly, a program <strong>of</strong><br />

maintenance and rehabilitation was<br />

conducted for each <strong>of</strong> the playing<br />

areas.<br />

Landscape maintenance and<br />

improvements to parks, gardens<br />

and streetscapes continued the<br />

theme <strong>of</strong> reducing water use<br />

and adapting to a drier climate.<br />

New garden refurbishments were<br />

undertaken at Widgee Road, John<br />

D’Orazio, Frank Drago, portions <strong>of</strong><br />

Bardon and Maylands Peninsula<br />

parks. In addition, five new<br />

sites and the WA Ballet building<br />

surrounds were added to the<br />

maintenance rounds.<br />

Sustainable<br />

Environment<br />

Conserving and protecting our<br />

natural areas are key pillars <strong>of</strong><br />

the <strong>City</strong>’s Strategic Plan. During<br />

2011-12, $175,000 was spent<br />

on managing the <strong>City</strong>’s major<br />

bushland areas which included<br />

Claughton Reserve, Gobba Lake,<br />

Eric Singleton Bird Sanctuary,<br />

Baigup Wetland, Tranby Foreshore,<br />

Berringa Park, Swan Lake and<br />

Lightning Swamp/Lightning Park<br />

Bushlands.<br />

2011-12 was the inaugural year for<br />

the <strong>City</strong>’s bushland management<br />

crew. The three man crew includes<br />

an indigenous conservation<br />

and land management trainee<br />

and the new team enables<br />

the <strong>City</strong> to manage its natural<br />

areas “in-house” and be more<br />

responsive to problems in the<br />

natural environment. As the<br />

climate has changed, weeds are<br />

flowering at different times <strong>of</strong> the<br />

year, the creation <strong>of</strong> the bushland<br />

management crew allows a more<br />

flexible approach and the weeds<br />

can be treated before they set<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

21


seed, maintaining the quality <strong>of</strong> our<br />

natural bushland areas.<br />

The <strong>City</strong> also continued to<br />

implement a number <strong>of</strong> its key<br />

sustainability strategies. These<br />

include ACER (Achieving Carbon<br />

and Energy Reduction), The ICLEI<br />

Water Campaign (water reduction),<br />

Future Pro<strong>of</strong>ing (climate change<br />

adaption) and the Regional<br />

Environmental Strategy.<br />

Some <strong>of</strong> the Sustainable<br />

Environment Capital projects<br />

the <strong>City</strong> implemented in 2011-12<br />

included:<br />

Lightning Swamp Boardwalk<br />

The <strong>City</strong>, in partnership with<br />

Lotterywest, constructed a 75<br />

metre boardwalk utilising recycled<br />

plastic materials adjacent to the<br />

Lightning Swamp eastern wetland.<br />

The material looks like a wood<br />

finish; however, it is fire, termite<br />

and water resistant. In conjunction<br />

with this, a new form <strong>of</strong> footing that<br />

does not require footing holes to be<br />

dug was also used to preserve both<br />

the environmental and Ngyoonar<br />

heritage values <strong>of</strong> the area.<br />

Ribbons <strong>of</strong> Blue Schools<br />

River Education Days<br />

In partnership with the Swan River<br />

Trust, the <strong>City</strong> hosted a two day<br />

education fair at Riverside Gardens<br />

with around 400 pupils attending<br />

from Hillcrest Primary, Weld<br />

Square Primary and Maylands<br />

Peninsula Primary Schools. The<br />

day included workshops for<br />

students on water quality within the<br />

<strong>Bayswater</strong> Catchment, live native<br />

animal experiences from Native<br />

Animal Rescue and Ngyoonar<br />

cultural workshops from the<br />

Department <strong>of</strong> Environment.<br />

Great Gardens Workshops<br />

During 2011-12, the <strong>City</strong> hosted<br />

six Great Gardens Workshops.<br />

The popular workshops have been<br />

running for almost 10 years and<br />

have attracted approximately 6,000<br />

eager gardeners over this time.<br />

The workshops provide residents<br />

with an opportunity to find out<br />

more about sustainable gardening<br />

techniques.<br />

Swan Lake Restoration<br />

This year saw the formation <strong>of</strong> the<br />

Friends <strong>of</strong> Swan Lake and also the<br />

implementation <strong>of</strong> the first stage <strong>of</strong><br />

the Swan Lake Restoration Plan,<br />

which included trialing a floating<br />

island, landscaping, restoration<br />

and planting. Swan Lake was<br />

a naturally occurring wetland,<br />

however, due to the urbanisation<br />

<strong>of</strong> <strong>Bayswater</strong> over the last century,<br />

the lake is now less than five per<br />

cent <strong>of</strong> its original size and urban<br />

pressures have resulted in the<br />

need for greater management<br />

intervention to improve the quality<br />

<strong>of</strong> the water body.<br />

Tranby Foreshore<br />

Restoration<br />

The <strong>City</strong> completed stage four <strong>of</strong><br />

the Tranby foreshore restoration<br />

project which involved the<br />

removing <strong>of</strong> a decrepit wooden<br />

wall, stabilising the riverbank with<br />

rocks and geotextile materials and<br />

revegetating the area with native<br />

sedges and rushes. The project<br />

also involved renourishing woody<br />

debris in the river for fish habitat.<br />

Water quality treatment underway at Swan Lake.<br />

22<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Planning &<br />

Development Services<br />

Strategic Planning<br />

Local Housing Strategy<br />

In May 2012, the <strong>City</strong> adopted<br />

its Local Housing Strategy<br />

following an extensive community<br />

consultation process. The purpose<br />

<strong>of</strong> the Local Housing Strategy is<br />

to establish a strategic framework<br />

to guide and provide for the <strong>City</strong><br />

<strong>of</strong> <strong>Bayswater</strong>’s current and future<br />

housing needs.<br />

The key objectives <strong>of</strong> the strategy<br />

are to:<br />

1. Provide a strategic direction<br />

for Council, developers and<br />

the community in relation<br />

to residential densities and<br />

housing issues in the <strong>City</strong>;<br />

2. Facilitate a mix <strong>of</strong> housing<br />

choices to accommodate all<br />

ages and diverse lifestyles;<br />

and<br />

3. Identify locations that have<br />

the capacity to accommodate<br />

population growth and<br />

change.<br />

The strategy promotes high quality<br />

development, local character and<br />

sustainability throughout the <strong>City</strong>.<br />

The strategy includes a number <strong>of</strong><br />

‘Focus Areas for Change’ aimed<br />

at creating vibrant, desirable and<br />

safe places in which to live, work<br />

and socialise. They will have<br />

increased development potential,<br />

and will facilitate a mix <strong>of</strong> housing<br />

choices, while focusing on quality<br />

streetscapes for pedestrians. In<br />

return, developers will be required<br />

to build high quality developments<br />

to enhance the character <strong>of</strong> the<br />

area. Further detailed studies will<br />

be prepared in consultation with<br />

the local community.<br />

Most <strong>of</strong> the <strong>City</strong> lies outside <strong>of</strong> the<br />

‘Focus Areas for Change’ and is<br />

predominantly residential. Minimal<br />

change is proposed to the planning<br />

framework in these areas.<br />

Maylands Activity Centre<br />

On 14 December 2011 the<br />

“Maylands Activity Centre Zone”<br />

was gazetted.<br />

The rezoning was a major<br />

step in implementing the<br />

recommendations <strong>of</strong> the Maylands<br />

Activity Centre Urban Design<br />

Framework endorsed in December<br />

2009 following widespread<br />

community consultation.<br />

The rezoning divides the centre<br />

into precincts, based on land use<br />

and built form, with each precinct<br />

informed by Special Control Area<br />

provisions. The Special Control<br />

Area provisions outline a vision for<br />

each precinct and provide detailed<br />

development requirements such as<br />

minimum and maximum building<br />

heights, setbacks and other<br />

development standards.<br />

The Special Control Area<br />

provisions will allow the Maylands<br />

town centre to develop as a<br />

collection <strong>of</strong> unique ‘places’ within<br />

a common framework .<br />

The Maylands Activity Centre<br />

zone provides more development<br />

potential on each lot and a wider<br />

range <strong>of</strong> potential land uses.<br />

The zone will assist in creating a<br />

vibrant, desirable and safe place in<br />

which to live, work and socialise.<br />

Heritage Grants<br />

The <strong>City</strong> continued its successful<br />

heritage grants program to assist in<br />

the conservation and enhancement<br />

<strong>of</strong> important heritage properties.<br />

In 2011-12, $13,676 was allocated<br />

as grant funding. To be eligible<br />

for funding, the properties had<br />

to be more than 50 years old<br />

and included on the <strong>City</strong>’s list <strong>of</strong><br />

heritage places.<br />

Morley <strong>City</strong> Centre<br />

In March 2012, an amendment to<br />

Town Planning Scheme<br />

No. 23 was gazetted, removing<br />

potential barriers and providing<br />

increased flexibility to facilitate the<br />

redevelopment <strong>of</strong> the Morley city<br />

centre.<br />

The amendment means the <strong>City</strong><br />

can consider a wider range <strong>of</strong> land<br />

uses within Morley city centre,<br />

in accordance with the adopted<br />

Morley <strong>City</strong> Centre Masterplan.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

23


Statutory Planning<br />

Development Applications<br />

During 2011-12, the <strong>City</strong> received 795 development applications. Although the<br />

number was down from the peak period 2009 to 2011, overall development<br />

activity remained high. Turnaround times for development application were<br />

reduced, with an average time for processing development applications, not<br />

requiring advertising, <strong>of</strong> 20 days. This is down from 26 days in 2010-11 and<br />

32 days in 2009-10.<br />

Of the development applications received that did not require advertising, 70<br />

per cent were completed within the statutory time frame. This is up four per<br />

cent over 2010-11, with the caveat that this does not allow for delays caused<br />

by the applicant.<br />

Recent amendments to Town Planning Schemes No. 23 and No. 24 have<br />

exempted minor developments from requiring planning approval. Landowners<br />

are no longer required to submit a development application for sheds,<br />

patios and carports for single, grouped or multiple dwellings providing they<br />

meet certain requirements. The amendments have reduced the number <strong>of</strong><br />

development applications received during the year and it is anticipated that<br />

this reduction will continue. This means that it is now quicker and easier for<br />

residents and ratepayers to start minor development such as carports and<br />

sheds.<br />

1200<br />

Development Applications Received<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12<br />

Development Applications Received 2010-11 & 2011-12<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Jul<br />

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun<br />

10-11 11-12<br />

24<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Subdivision Applications<br />

The <strong>City</strong> received 168 subdivision applications, down by 22 per cent on<br />

the previous year, mainly due to economic conditions. However, overall<br />

development activity remains high and the number <strong>of</strong> clearance applications<br />

received remained consistent.<br />

25<br />

Subdivision Applications 2010-11 and 2011-12<br />

20<br />

15<br />

10<br />

5<br />

0<br />

Jul<br />

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun<br />

10-11 11-12<br />

Seventy nine per cent <strong>of</strong> subdivision applications were completed within<br />

the statutory timeframe, up four per cent from 2010-11, with an average<br />

processing time <strong>of</strong> only 13 days.<br />

Development Assessment Panels<br />

On 1 July 2011, the Minister for Planning introduced Development<br />

Assessment Panels or DAPs, across Western Australia. This meant that<br />

applications for development with a value <strong>of</strong> $7million or more are required<br />

to be determined by a DAP. Additionally, applicants have the ability to ‘opt in’<br />

and have their application determined by the DAP where the application has a<br />

value between $3million to $7million.<br />

Since the inception <strong>of</strong> DAPs, the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> has received five<br />

applications that have been determined by a Development Assessment Panel.<br />

Building Service<br />

Statutory Approvals<br />

In April 2012, the State Government passed legislation through Parliament<br />

that changed the building approvals process. The new Building Act 2011 and<br />

its supporting Regulations introduced the following changes to the approvals<br />

process for Local Governments:<br />

q Private Certification;<br />

q Permit Authorities;<br />

q Timeframe for approvals;<br />

q Occupancy Permits and Building Approval Certificates; and<br />

q Consent to affect other land.<br />

The Building Act also sets out the role <strong>of</strong> a Local Government as a Permit<br />

Authority with three main functions:<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

25


1. Building Approval Certificates (Uncertified Applications);<br />

2. Permit approval and issue Building and Occupancy Permits; and<br />

3. Enforcement.<br />

The 2011-12 financial year saw a reduction in both the overall number <strong>of</strong><br />

approvals issued and the value <strong>of</strong> works approved. Some <strong>of</strong> this can be<br />

attributed to the down turn in the building industry. The overall reduction was<br />

fourteen percent in the number <strong>of</strong> approvals and twenty eight percent in the<br />

value <strong>of</strong> works.<br />

There was however a noticeable increase in the number <strong>of</strong> commercial,<br />

industrial, shop fitouts & public buildings compared to last financial year which<br />

saw an increase in the number <strong>of</strong> applications, mainly due to the internal fitout<br />

<strong>of</strong> the Coventry Square Markets.<br />

Type <strong>of</strong> Construction<br />

No. <strong>of</strong><br />

approvals<br />

2011-12<br />

Variance<br />

from 2010-11<br />

(%)<br />

Value <strong>of</strong> Work<br />

$<br />

Dwellings & additions 416 -18 91,570,968<br />

Outbuildings, patios &<br />

pergolas<br />

351 -23 3,030,216<br />

Commercial, industrial,<br />

Shop fitouts & public<br />

198 273 27,760,462<br />

buildings<br />

Swimming pools 54 -31 1,095,825<br />

Other: (fences, retaining<br />

walls, strata inspections)<br />

153 -33 741,731<br />

Demolition 141 -33 -<br />

Total 1313 -14 124,199,202<br />

Building Works<br />

Building Maintenance/ Asset Management<br />

Coventry Square Markets<br />

During 2011-12, as part <strong>of</strong> updating the Build Pak asset management data<br />

base, the <strong>City</strong> continued an extensive audit <strong>of</strong> all <strong>of</strong> our built assets. This<br />

program is a vital part <strong>of</strong> our commitment to ensuring that all facilities are fully<br />

maintained and kept to a safe standard for community use.<br />

During 2011-12, the following maintenance works were completed:<br />

Building Maintenance $279,732<br />

Preventative Maintenance $137,748<br />

Special Building Maintenance $200,112<br />

Cleaning Maintenance $430,680<br />

26<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Building Approvals by Category 2011-12<br />

141<br />

54<br />

153<br />

198<br />

416<br />

Dwellings and additions<br />

Outbuildings, Patios and Pergolas<br />

Commercial, Industrial, Shop fit-out<br />

and Public Buildings<br />

Swimming pools<br />

Other (fences, retaining walls and<br />

strata inspections).<br />

Demolition<br />

351<br />

Capital Works<br />

The <strong>City</strong> completed a number <strong>of</strong> significant capital works projects in 2011-12,<br />

including:<br />

Halliday Park Lacrosse Clubrooms<br />

Stage three <strong>of</strong> the building refurbishments to the two-storey facility was the<br />

construction <strong>of</strong> a viewing balcony on the upper level <strong>of</strong> the clubrooms and<br />

renovations to the kitchen and the ground floor change room facilities. The<br />

works were completed in May 2012 and the Club presented the <strong>City</strong> with a<br />

certificate <strong>of</strong> appreciation in recognition <strong>of</strong> the long term support given to the<br />

<strong>Bayswater</strong> Lacrosse Club, which was established in 1939.<br />

<strong>Bayswater</strong> Waves<br />

Several areas within <strong>Bayswater</strong> Waves were renovated and have been given<br />

a facelift. These included:<br />

q Removal <strong>of</strong> the bar area, painting the walls and ceiling, replacing the<br />

carpet and installation <strong>of</strong> coloured window tinting to the group fitness<br />

room; and<br />

q Repainting the walls <strong>of</strong> the gymnasium and crèche.<br />

Embleton Public Golf Course<br />

Work to construct the new curators shed, which provides an <strong>of</strong>fice as well<br />

as houses the green keeper’s machinery and equipment, commenced in<br />

February 2012 and was completed in June 2012.<br />

Maylands Yacht Club - Kitchen upgrade<br />

This project involved the removal <strong>of</strong> a large unused storage cupboard within<br />

and upgrading <strong>of</strong> the existing kitchen cupboards in the clubrooms and<br />

separating it from the bar area. The work was carried out by the <strong>City</strong>’s inhouse<br />

tradesmen and was completed in June 2012.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

27


Financial Services<br />

<strong>Annual</strong> Budget<br />

A balanced budget was achieved<br />

in 2011-12, with provision for<br />

several new capital and asset<br />

replacement programs. Provision<br />

was also made for increases in<br />

utility charges (electricity, gas and<br />

water), fuel and the operational<br />

costs associated with new assets<br />

such as The RISE.<br />

Investments<br />

The <strong>City</strong> has an investment policy<br />

that sets out the requirements for<br />

the <strong>City</strong>’s policy on diversification<br />

for the purposes <strong>of</strong> risk<br />

minimisation. Rates income,<br />

monies held in trust, cash backed<br />

reserve funds and municipal<br />

funds are invested in the short<br />

term money market (3 - 6 month<br />

term deposit and ‘at call’ ) and the<br />

interest earnings are treated as<br />

income. Returns will fluctuate to<br />

some degree due to changes in<br />

the cash rate set by the Reserve<br />

Bank and rates collection. Total<br />

investments as at 30 June 2012<br />

were $29.5 million, compared to<br />

$25.7 million in the previous year.<br />

Aged Care<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> is unique<br />

in that it is heavily involved in<br />

providing residential aged care<br />

accommodation, with a mix <strong>of</strong><br />

hostel and independent living<br />

aged care units. The Financial<br />

Services Division administers the<br />

prudential and governance issues<br />

<strong>of</strong> the aged care facilities including<br />

the accommodation bonds and<br />

entry contributions. The day to day<br />

operating issues <strong>of</strong> the aged care<br />

residents are managed under a<br />

long term agreement with Uniting<br />

Church Homes.<br />

Childcare<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> is also<br />

indirectly involved in childcare<br />

services through the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> Child Care Association<br />

(Inc) which is reported as a<br />

separate entity in the <strong>Annual</strong><br />

Financial Statements. Councillors<br />

<strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> form<br />

the Board <strong>of</strong> the Child Care<br />

Association, which operates under<br />

its own constitution and provides<br />

a mix <strong>of</strong> long day care, before and<br />

after school care, and vacation<br />

care across several sites.<br />

Morley Sport and<br />

Recreation Centre<br />

Financial Services also provides<br />

prudential and governance<br />

support for the Morley Sport<br />

and Recreation Centre, which is<br />

managed by the YMCA under a<br />

long term agreement with the <strong>City</strong>.<br />

Customer Services<br />

The <strong>City</strong> provides shop front style<br />

customer services at the Civic<br />

Centre in Broun Avenue, Max<br />

Tulley Office and Information<br />

Centre at the Centro Galleria<br />

Shopping Centre and the new<br />

RISE facility in Maylands. All <strong>of</strong><br />

these shop fronts are available<br />

to residents to pay rates and<br />

infringements, and to access<br />

advice on the <strong>City</strong>’s services such<br />

as events, waste management,<br />

child immunisation and animal<br />

control. A Justice <strong>of</strong> the Peace<br />

service is also available at all three<br />

shopfronts and this important<br />

service assists an average <strong>of</strong> 120<br />

clients per month.<br />

Building and development<br />

applications can be lodged at the<br />

Civic Centre, and 200 applications<br />

are processed per month on<br />

average.<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> provides a<br />

number <strong>of</strong> payment methods for<br />

rates and infringements. To expand<br />

this service, the Financial Services<br />

Division commenced work in 2011-<br />

12 on introducing over the counter<br />

payment services at Australia Post<br />

<strong>of</strong>fices.<br />

Information Technology<br />

The information technology section<br />

maintains business continuity,<br />

data integrity and access security<br />

across numerous core and ancillary<br />

information systems. The section<br />

also maintains the <strong>City</strong>’s network<br />

and communications infrastructure,<br />

including data lines and telephone<br />

systems.<br />

A major communication upgrade<br />

project commenced in 2010-11 with<br />

fibre optic connections between the<br />

Civic Centre and the out centres.<br />

This project continued through<br />

2011-12 to improve data speed<br />

and reliability. A data recovery<br />

project was also commenced<br />

in 2011-12 to maintain critical<br />

information systems in the event<br />

<strong>of</strong> a significant loss <strong>of</strong> power. A<br />

new minutes and agenda system<br />

was also implemented during this<br />

period for business efficiency,<br />

and an intranet was launched to<br />

assist internal communication and<br />

augment the <strong>City</strong>’s website.<br />

28 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Operating Revenues<br />

Operating Expenses<br />

$2,428,856<br />

$2,924,700<br />

$473,396<br />

$2,300,477 $725,793<br />

$1,465,344<br />

$4,180,810<br />

$6,932,462<br />

$2,007,941<br />

$1,370,708<br />

$9,317,144<br />

$9,197,107<br />

$31,108,258<br />

$107,140<br />

$18,138,359<br />

$24,779,635<br />

$10,834,847<br />

Rates<br />

Income from Council fees<br />

and charges<br />

Grants and subsidies<br />

Contributions<br />

Interest Earned<br />

Other<br />

Recreation and Culture<br />

Transport<br />

Economic Services<br />

Governance and<br />

Administration<br />

Law, Order and Public<br />

Safety<br />

Health<br />

Other Property and Services<br />

Welfare and Education<br />

General Purpose funding<br />

Health<br />

Community Amenities<br />

Purchasing and<br />

Tendering<br />

The Financial Services Division<br />

is responsible for ensuring that<br />

the <strong>City</strong> meets the compliance<br />

requirements for its purchasing<br />

and tender practices, including<br />

maintaining the Tender Register<br />

and general contract management<br />

issues.<br />

<strong>Annual</strong> Financial<br />

Statements<br />

The set <strong>of</strong> financial statements<br />

show the position <strong>of</strong> the <strong>City</strong> as<br />

<strong>of</strong> 30 June 2012 and they give an<br />

indication <strong>of</strong> the <strong>City</strong>’s financial<br />

performance during the preceding<br />

12 months. The statements have<br />

been prepared in accordance with<br />

the Local Government Act 1995 (as<br />

amended), the Local Government<br />

(Financial Management)<br />

Regulations 1996 (as amended)<br />

and the Australian Accounting<br />

Standards (including the Australian<br />

Accounting Interpretations).<br />

The <strong>City</strong> follows the accrual<br />

method <strong>of</strong> accounting for revenues<br />

and expenses. Revenues are<br />

recognised in the year in which<br />

they are earned and measurable.<br />

Expenses are recognised as they<br />

are incurred and measurable as<br />

a result <strong>of</strong> the delivery <strong>of</strong> goods<br />

or services and/or upon the<br />

creation <strong>of</strong> a legal obligation to pay.<br />

Expenses paid in the current period<br />

and attributable to a future period<br />

are recorded as prepaid.<br />

The Statement <strong>of</strong> Financial Position<br />

is also referred to as the ‘Balance<br />

Sheet’ and is a summary <strong>of</strong> what<br />

the <strong>City</strong> owns (assets) and what it<br />

owes (liabilities) The bottom line <strong>of</strong><br />

this statement is the accumulated<br />

equity.<br />

Current assets and liabilities are<br />

those which will fall due in the next<br />

12 months.<br />

The Statement <strong>of</strong> Changes in<br />

Equity shows the movements in the<br />

<strong>City</strong>’s cash back reserves. These<br />

reserves provide for future financial<br />

commitments, including capital<br />

replacement. Funds are transferred<br />

to and from these reserves during<br />

the year to maintain liquidity ratios<br />

and allocate surplus operating<br />

funds.<br />

The Statements <strong>of</strong> Comprehensive<br />

Income are also referred to as<br />

‘Pr<strong>of</strong>it and Loss Statements’ as<br />

they show the sources <strong>of</strong> the <strong>City</strong>’s<br />

revenue under various income<br />

headings and the expenditure<br />

incurred in running the <strong>City</strong>’s<br />

operations during the year. These<br />

expenses do not include the<br />

capital costs associated with the<br />

purchase <strong>of</strong>, or the construction <strong>of</strong><br />

assets, however provision is made<br />

for depreciation <strong>of</strong> assets. The<br />

comprehensive result is equal to<br />

the movement in net assets or total<br />

equity from the previous year.<br />

The Statements <strong>of</strong> Cash Flows<br />

summarise the <strong>City</strong>’s cash<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

29


payments and cash receipts for<br />

the year. The amounts in the<br />

Statements <strong>of</strong> Cash Flows differ<br />

from the values in the Statements<br />

<strong>of</strong> Comprehensive Income which is<br />

prepared on the accrual accounting<br />

basis.<br />

Cash, in the context <strong>of</strong> these<br />

statements, refers to bank deposits<br />

and cash received into the <strong>City</strong>’s<br />

bank account from ratepayers<br />

and sundry debtors and the<br />

interest earnings from investments<br />

but does not include the costs<br />

associated with the sale <strong>of</strong> assets.<br />

It also includes the payments to<br />

staff, creditors and other persons<br />

but does not include the costs<br />

associated with the creation <strong>of</strong><br />

assets.<br />

The statements show the cash<br />

invested in the creation or<br />

purchase <strong>of</strong> property, infrastructure,<br />

plant and equipment, investment<br />

property and intangible assets and<br />

the cash received from the sale <strong>of</strong><br />

these assets.<br />

The Statements also show the<br />

cash flows from the receipt and<br />

repayment <strong>of</strong> borrowed funds are<br />

recorded, as well as any movement<br />

in trust funds and deposits held by<br />

the <strong>City</strong>.<br />

The bottom line <strong>of</strong> the Cash Flow<br />

Statement is the cash as at the end<br />

<strong>of</strong> the financial year. This shows<br />

the capacity <strong>of</strong> the <strong>City</strong> to meet its<br />

cash debts and other liabilities.<br />

The Rates Setting Statement<br />

shows the expenditure required<br />

from rates to fund the shortfall<br />

between operating expenditure<br />

by program area and the other<br />

revenue sources including grants<br />

and contributions.<br />

Rates and grants are recognised<br />

as revenues when the <strong>City</strong> obtains<br />

control over the assets comprising<br />

these receipts. Control over assets<br />

acquired from rates is obtained at<br />

the commencement <strong>of</strong> the rating<br />

year as it is an enforceable debt<br />

linked to the rateable property.<br />

Income from grants is recognised<br />

in the year when the <strong>City</strong> obtains<br />

control <strong>of</strong> the grant or the right to<br />

receive it and the amount <strong>of</strong> the<br />

grant can be measured reliably.<br />

The Local Government<br />

<strong>Report</strong>ing Entity<br />

All funds through which the <strong>City</strong><br />

controls resources to carry on its<br />

functions have been included in the<br />

financial statements.<br />

Principles <strong>of</strong><br />

Consolidation<br />

All entities through which the <strong>City</strong><br />

controls resources to carry on its<br />

operation have been included in<br />

the financial statements. This<br />

encompasses:<br />

q Main Entity<br />

The Municipality <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong><br />

q Consolidation<br />

The Municipality <strong>of</strong> the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong><br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> Child<br />

Care Centre Association (Inc)<br />

Statement <strong>of</strong> Financial<br />

Position<br />

The 2011 -12 Statement <strong>of</strong><br />

Financial Position results indicate<br />

that the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong><br />

experienced an increase in net<br />

assets during the financial year.<br />

Statement <strong>of</strong> Changes in<br />

Equity<br />

The 2011-12 Equity Statement<br />

shows that the <strong>City</strong> experienced<br />

an increase in cash backed<br />

reserves by $0.941 million to<br />

$10.691 million. By comparison,<br />

cash backed reserves increased<br />

in 2010-11 by $1.044 million to<br />

$9.750 million.<br />

Statement <strong>of</strong><br />

Comprehensive Income<br />

Program<br />

The Statement <strong>of</strong> Comprehensive<br />

Income for 2011-12 showed an<br />

increase in operating revenue<br />

<strong>of</strong> $6.465 million and an $8.162<br />

30<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


million increase in operating<br />

expenditure, which is a significant<br />

change in position compared to<br />

the previous year when operating<br />

revenue increased by $4.826<br />

million and operating expenditure<br />

increased by $2.662 million.<br />

The year to year difference in<br />

operating expenditure is mainly due<br />

to grants and contributions in 2010-<br />

11 <strong>of</strong> $8.719 million, (including<br />

a one-<strong>of</strong>f $7m grant from<br />

Lotterywest for construction <strong>of</strong> The<br />

RISE in Maylands). By comparison,<br />

the grant and contributions income<br />

in 2011-12 was a relatively modest<br />

$1.722 million.<br />

The significant movement in<br />

operations from $22.752 million in<br />

2010-11 to $29.32 million in 2011-<br />

12 is mainly attributed to a $24.589<br />

million revaluation <strong>of</strong> Council road<br />

infrastructure, a $2.713 million<br />

increase in equity movement <strong>of</strong><br />

the joint venture with the Eastern<br />

Metropolitan Regional Council<br />

(EMRC), and a $6.998 million<br />

reduction in capital grants.<br />

(b)<br />

<strong>City</strong> <strong>of</strong> Swan - Development<br />

<strong>of</strong> Altone Park - a<br />

community, sporting and<br />

recreation facility<br />

The financial statements reflect<br />

the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong>’s interest<br />

in the joint development with the<br />

<strong>City</strong> <strong>of</strong> Swan for the construction<br />

<strong>of</strong> the Pavilion and Community<br />

Recreation Centre at Altone Park.<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> has the<br />

following interest in the assets and<br />

liabilities <strong>of</strong> the Venture:<br />

Pavilion 50%<br />

Recreation Centre 50%<br />

Library 33%<br />

Operating costs are shared on the<br />

basis <strong>of</strong> each interest.<br />

The <strong>City</strong>’s share <strong>of</strong> the assets<br />

and liabilities to each joint venture<br />

are included in the Statement<br />

<strong>of</strong> Financial Position under the<br />

following classification:<br />

Classification 2011-12<br />

Buildings<br />

$ 109,814<br />

Community<br />

Housing<br />

Project<br />

Altone Park $1,025,343<br />

Project<br />

Total $1,135,157<br />

(c)<br />

Eastern Metropolitan<br />

Regional Council<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> is a<br />

participant in the Eastern<br />

Metropolitan Council (EMRC).<br />

The EMRC comprises six<br />

member Councils and is primarily<br />

concerned with regional waste<br />

management and the provision <strong>of</strong><br />

safety services.<br />

Pictured: 2011-12 Rates prize draw winners, Mr and Mrs Daniel McKenna, receiving the keys to<br />

their new Holden Cruze II car courtesy <strong>of</strong> Metro Motors and the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong>.<br />

Joint Ventures<br />

(a)<br />

Homeswest - Community<br />

Housing Project<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> entered<br />

into a joint venture with the then<br />

State Housing Commission (now<br />

Department <strong>of</strong> Housing) in 1991<br />

to develop stage 1 <strong>of</strong> a community<br />

housing project consisting <strong>of</strong> four<br />

units in Haddrill Street. A second<br />

joint agreement was entered into in<br />

1993 for stage 2 in Francis Street,<br />

consisting <strong>of</strong> six units.<br />

The <strong>City</strong> has a 25 percent interest<br />

in the project. Operating costs are<br />

funded from excess income over<br />

expenditure.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

31


Equity 2011-12 2010-11<br />

<strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> $14,824,118 $12,111,075<br />

<strong>City</strong> <strong>of</strong> Belmont $8,516,118 $6,873,600<br />

Town <strong>of</strong> Bassendean $3,550,574 $2,897,798<br />

Shire <strong>of</strong> Mundaring $9,357,418 $7,623,618<br />

<strong>City</strong> <strong>of</strong> Swan $27,473,865 $22,132,199<br />

Shire <strong>of</strong> Kalamunda $13,420,932 $10,935,611<br />

$77,143,313 $62,573,901<br />

The <strong>City</strong>’s interest in the joint venture calculated by the EMRC as at 30<br />

June 2012 is 19.22 per cent, representing its share <strong>of</strong> the net assets <strong>of</strong><br />

$14,824,118.<br />

Rates and Charges<br />

During the 2011-12 financial year the <strong>City</strong> levied rates and charges <strong>of</strong> $40.227<br />

million, comprising:<br />

General Rates $31,108,258<br />

Rubbish Bin Charges $8,747,301<br />

Swimming Pool Fees $30,287<br />

Admin Fees/Penalties $340,700<br />

The <strong>City</strong>’s rates debt collection rate remains consistent with 98 per cent <strong>of</strong> the<br />

rates and charges collected every year.<br />

The <strong>City</strong> levies and collects the Emergency Services Levy on behalf <strong>of</strong> the<br />

Fire and Emergency Services Authority. A total <strong>of</strong> $6.403 million was remitted<br />

to the State Government in 2011-12.<br />

Rates were based on the Gross Rental Value (GRV) <strong>of</strong> the property as<br />

determined by the Valuer General’s Office. Gross rental values throughout<br />

the district as at 1 July 2011 were $586.448 million.<br />

Grants<br />

The <strong>City</strong> receives grants and subsidies from the State and Commonwealth<br />

governments, <strong>of</strong> which the most significant is the notional Financial Assistance<br />

Grant funded by the Commonwealth and distributed through the WA Local<br />

Government Grants Commission. This grant comprises two components,<br />

local road funding and general purpose funding and distributed across the<br />

sector on a percentage basis. The <strong>City</strong> received $11.038 million in grants and<br />

subsidies from the State and Commonwealth governments. These were used<br />

in the following areas:<br />

Operating $9,317,144<br />

Non-operating $1,721,618<br />

$11,038,762<br />

General purpose funding $2,566,839<br />

Law order and public safety $46,007<br />

Health $34,272<br />

Education and welfare $6,618,426<br />

Community amenities $904<br />

Recreation and culture $467,171<br />

Transport/community amenities $1,260,597<br />

Economic Services $44,546<br />

Total $11,038,762<br />

32<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Plan for the Future<br />

The <strong>City</strong> is required under Section 5.56 9(1) and (2)<br />

<strong>of</strong> the Local Government Act 1995 to develop a four<br />

year Plan for the Future and to develop the plan in<br />

accordance with the Regulations. The <strong>City</strong>’s current<br />

plan covers the period 1 July 2008 to 30 June 2012,<br />

and was developed in accordance with the Local<br />

Government (Administration) Regulations 1996.<br />

The plan addresses the description and purpose<br />

<strong>of</strong> each <strong>of</strong> the core activity areas <strong>of</strong> the <strong>City</strong> such<br />

as library services, waste collection, parks and<br />

recreation services, community security and ranger<br />

services, welfare, aged accommodation, roads and<br />

path maintenance, planning and building services,<br />

governance and general administration. The plan<br />

also covers the objectives, funding and performance<br />

indicators for the core activity areas.<br />

Pictured: Mertome<br />

Retirement Village resident<br />

Mrs Rosa Bigelman relaxes in<br />

the village’s gardens.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

33


Statutory <strong>Report</strong>ing<br />

Disability Access and<br />

Inclusion Plan (DAIP)<br />

Outcome 1: People with a<br />

disability have the same<br />

opportunities as other people to<br />

access the services <strong>of</strong> and any<br />

events organised by, the relevant<br />

public authority.<br />

q The <strong>City</strong> considered all<br />

elements <strong>of</strong> access in the<br />

planning and implementation<br />

<strong>of</strong> events such as the Autumn<br />

River Festival, the Avon<br />

Descent, Evening in the Park<br />

and community concerts.<br />

q The <strong>City</strong>’s libraries provided<br />

inclusive options such as:<br />

large print books, a home<br />

bound library service, talking<br />

books, Rhyme Time and<br />

Story Time for pre-school<br />

children, and monthly adult<br />

activities that included:<br />

information sessions and<br />

hands on workshops.<br />

q The <strong>City</strong>’s recreation centres<br />

provided a variety <strong>of</strong> activities<br />

catering for different needs<br />

and age groups. These<br />

included gymnasiums and<br />

fitness classes, swimming<br />

lessons, sporting activities,<br />

crèche facilities and sports<br />

courts.<br />

q <strong>City</strong> events such as the Art<br />

Awards, Garden Awards,<br />

and citizenship ceremonies<br />

considered all aspects <strong>of</strong><br />

access in their planning and<br />

implementation.<br />

Outcome 2: People with a<br />

disability have the same<br />

opportunities as other people to<br />

access the buildings and other<br />

facilities <strong>of</strong> the relevant public<br />

authority.<br />

q A $100,000 Commonwealth<br />

Government funded project at<br />

the Maylands Yacht Club that<br />

included the installation <strong>of</strong> an<br />

access ramp, accessible toilet<br />

and a lift to the top floor to<br />

provide better access for all.<br />

q A <strong>Bayswater</strong> Waves Aquatic<br />

Centre upgrade included:<br />

a new accessible toilet,<br />

change room, distress alarms<br />

installed in seven toilets and<br />

a new pool hoist.<br />

q The RISE in Maylands, which<br />

opened in July 2011, is a new<br />

community recreation, leisure<br />

and information centre with<br />

access for all.<br />

q The <strong>City</strong>’s <strong>Bayswater</strong> Leisure<br />

and Information Services<br />

(BLIS) program for people<br />

with disability have new<br />

facilities at the RISE.<br />

q An audit on public access<br />

ways was completed, this<br />

information will be used<br />

for planning and budget<br />

allocation purposes to<br />

provide better access for all.<br />

q Customer request<br />

management for minor<br />

access issues are completed<br />

within five working days,<br />

(major works are dependent<br />

on budget allocation/funding<br />

grants).<br />

q Survey <strong>of</strong> footpaths and<br />

upgrading <strong>of</strong> wheelchair<br />

and pram ramps to the new<br />

Disability Standards have<br />

been completed in the Morley<br />

city centre.<br />

q Signalised intersections<br />

were introduced for safer<br />

pedestrian access at<br />

Progress Street, Walter Road<br />

West and Wellington Road<br />

to access the Morley Sport<br />

& Recreation Centre and<br />

the new Coventry Markets in<br />

Morley.<br />

q Pedestrian facilities were<br />

improved at Walter Road<br />

East and Beechboro Road<br />

North.<br />

q A pedestrian access ramp<br />

was installed at Garrett Road<br />

and Whatley Crescent to<br />

provide safer access.<br />

q Work to extend the Lightning<br />

Swamp Board Walk began to<br />

provide wheel chair access.<br />

q Shearn Memorial Park<br />

now has an accessible<br />

toilet and retro fitting for<br />

disability access and visual<br />

impairment.<br />

q Maylands Bowling Club<br />

installed an access ramp and<br />

hand rails.<br />

Outcome 3: People with a<br />

disability have the same<br />

opportunities as other people<br />

to receive information from the<br />

relevant public authority in a<br />

format that will enable them<br />

to access the information as<br />

readily as other people.<br />

q Comprehensive information<br />

is available on the You’re<br />

Welcome WA website to<br />

promote journey planning for<br />

community members.<br />

34<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


q New information technology on BrowseAloud was presented to Council.<br />

This technology will provide an important service for people with limited<br />

English pr<strong>of</strong>iciency, mild visual impairment, or a learning disability such<br />

as dyslexia.<br />

q The <strong>City</strong>’s website has been updated and now incorporates new<br />

features to alter text size and better meet individual needs.<br />

Outcome 4: People with a disability have the same opportunities as<br />

other people to receive the same level and quality <strong>of</strong> service from the<br />

staff <strong>of</strong> the relevant public authority as other people receive from the<br />

staff <strong>of</strong> that authority.<br />

q All new <strong>City</strong> staff received information about the <strong>City</strong>’s Disability Access<br />

and Inclusion Plan (DAIP). In addition, they were able to access a<br />

customer services DVD on the <strong>City</strong>’s intranet, and were updated on the<br />

<strong>City</strong>’s initiatives regarding the National Relay Service (NRS) and the<br />

Translating and Interpreting Services (TIS) to provide quality customer<br />

service.<br />

q Customer Request Management (CRM) forms for minor access issues<br />

are completed within five working days (major works are dependent on<br />

budget allocation and/or funding grants).<br />

q Disability awareness information was sent to staff via email to inform<br />

them <strong>of</strong> new initiatives. The information is also available on the <strong>City</strong>’s<br />

intranet and the <strong>City</strong>’s website for the community.<br />

Outcome 5: People with a disability have the same opportunities as<br />

other people to make complaints to the relevant public authority.<br />

q All complaints received regarding services, facilities, information and<br />

staff were treated in confidence and addressed by the relevant manager.<br />

q The <strong>City</strong> began work on a new Customer Service Charter that will<br />

articulate standards for current and future customer service.<br />

q Ongoing customer service training on how to receive and address<br />

complaints will be implemented as part <strong>of</strong> the new Customer Service<br />

Charter for all relevant staff.<br />

Outcome 6: People with a disability have the same opportunities as<br />

other people to participate in any public consultation by the relevant<br />

public authority.<br />

q Community members were invited to take part in the Age Friendly<br />

Communities Project through community forums, surveys or telephone<br />

interviews. The information obtained will be used to develop an Age<br />

Friendly Strategy.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

35


Statutory <strong>Report</strong>ing<br />

continued...<br />

Equal Opportunity<br />

The <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> is committed<br />

to providing a workplace where<br />

every individual is treated with<br />

respect in an environment free<br />

from discrimination or harassment.<br />

During 2011-12, the <strong>City</strong> reviewed<br />

its obligations under the Western<br />

Australian Equal Opportunity Act<br />

1984.<br />

In addition, the <strong>City</strong>’s processes<br />

for resolving EEO grievances and<br />

complaints were reviewed.<br />

Record Services<br />

Compliance with the State<br />

Records Act 2000:<br />

Records Services manages the<br />

records <strong>of</strong> the <strong>City</strong> in accordance<br />

with legal requirements <strong>of</strong> the State<br />

Records Act 2000 and the <strong>City</strong> <strong>of</strong><br />

<strong>Bayswater</strong> Recordkeeping Plan.<br />

During 2011-12, 95,970 documents<br />

were registered in the <strong>City</strong>’s<br />

document management system<br />

DataWorks, an increase <strong>of</strong> 27.5<br />

percent on the previous financial<br />

year.<br />

All new <strong>City</strong> employees undertake<br />

a compulsory induction training<br />

session for the <strong>City</strong>’s document<br />

management system. The<br />

induction addresses employee<br />

responsibilities in regard to their<br />

compliance with the Recordkeeping<br />

Plan, policy and procedures. After<br />

the initial induction training in the<br />

<strong>City</strong>’s document management<br />

system, follow up training sessions<br />

are conducted to ensure the <strong>City</strong>’s<br />

staff understand their record<br />

keeping responsibilities and are<br />

abiding by procedures and policy.<br />

Additionally, on-going assistance<br />

and support is provided to all<br />

<strong>City</strong> staff by Records Services to<br />

ensure continued commitment to<br />

compliance and procedures.<br />

Freedom <strong>of</strong> Information<br />

In accordance with Section 96 and<br />

97 <strong>of</strong> the Freedom <strong>of</strong> Information<br />

Act 1992, the <strong>City</strong> is required to<br />

publish an Information Statement<br />

which details the process <strong>of</strong><br />

applying for information under the<br />

Act, as well as information that the<br />

<strong>City</strong> provides outside the Act. This<br />

document is available from the <strong>City</strong><br />

<strong>of</strong> <strong>Bayswater</strong>’s <strong>of</strong>fices or via the<br />

<strong>City</strong>’s website.<br />

During 2011-12, the <strong>City</strong> received<br />

17 Freedom <strong>of</strong> Information (FOI)<br />

applications, a decrease <strong>of</strong><br />

eight from the previous financial<br />

year. The Act requires that all<br />

applications are responded to<br />

within 45 days. The <strong>City</strong>’s average<br />

processing time for applications<br />

was 15 days, an improvement <strong>of</strong><br />

13 days on the previous financial<br />

year.<br />

National Competition<br />

Policy<br />

The Competition Principles<br />

Agreement (CPA) is a contractual<br />

agreement between Federal<br />

Government and all State and<br />

Territory Governments. The<br />

CPA aims to ensure that all<br />

public enterprises operate in a<br />

transparent manner in the best<br />

interests <strong>of</strong> the public. Under<br />

the CPA, public enterprises are<br />

required to review their operations<br />

to ensure they have no competitive<br />

advantage or disadvantage as a<br />

result <strong>of</strong> their public status.<br />

Competitive Neutrality<br />

(under the CPA)<br />

Competitive neutrality addresses<br />

potential advantages or<br />

disadvantages that public<br />

36<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


enterprises may have compared with businesses operating in the private<br />

sector.<br />

The following services are provided by the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> through the open<br />

tendering process and which fall within the definition <strong>of</strong> the CPA:<br />

1. Domestic waste collection including recycling, green waste and park<br />

litter bins has been contracted to Transpacific Holdings trading as<br />

Cleanaway.<br />

2. Management <strong>of</strong> the Morley Sport and Recreation Centre is contracted to<br />

the YMCA.<br />

3. Management <strong>of</strong> the Embleton Public Golf Course and the Maylands<br />

Peninsula Public Golf Course is contracted to Golf Oracle Pty Ltd.<br />

4. The operational management <strong>of</strong> the residential aged care facilities<br />

including the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> Hostel, Carramar Hostel, independent<br />

living units, Salisbury Retreat and Noranda Retreat is contracted to<br />

Uniting Church Homes.<br />

Disclosure <strong>of</strong> <strong>Annual</strong> Salaries<br />

Legislative amendments included the insertion <strong>of</strong> Regulation 19B into the<br />

Local Government (Administration) Regulations 1986. Regulation 19B<br />

requires that the <strong>Annual</strong> <strong>Report</strong> <strong>of</strong> a local government for a financial year is<br />

to contain information on the number <strong>of</strong> employees <strong>of</strong> the local government<br />

entitled to an annual salary <strong>of</strong> $100,000 or more, and the number <strong>of</strong><br />

employees with an annual salary entitlement that falls within each band <strong>of</strong><br />

$10,000 over $100,000.<br />

Salary range $<br />

2011-12 number <strong>of</strong> employees<br />

100,000-109,999 6<br />

130,000-139,999 3<br />

140,000-149,999 1<br />

190,000-199,999 1<br />

Register <strong>of</strong> Complaints <strong>of</strong> Minor Breaches<br />

In accordance with Section 5.121 <strong>of</strong> the Local Government Act 1995 (as<br />

amended) and Section 5.53(2), the <strong>Annual</strong> <strong>Report</strong> is required to disclose the<br />

number <strong>of</strong> complaints received each year:<br />

No. <strong>of</strong><br />

complaints<br />

2010-11<br />

2<br />

Outcome Action taken during 2011-12<br />

No breach (x1) -<br />

Breach <strong>of</strong> Regulation<br />

7, Section 7(1) <strong>of</strong> the<br />

Rules <strong>of</strong> Conduct.<br />

(x1)<br />

The Local Government Standards<br />

Panel instructed that notices <strong>of</strong><br />

censure in respect to two Councillors<br />

should be placed in the West<br />

Australian and Eastern <strong>Report</strong>er<br />

newspapers. These were placed<br />

in the 11 February 2012 and 14<br />

February 2012 editions respectively.<br />

No. <strong>of</strong> complaints<br />

Action taken during 2011-12<br />

2011-12<br />

6 Complaints not determined as at 30 June 2012.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

37


Attendance Summary<br />

Attendance Summary 2011-12<br />

P Committee Member | Attendance as Deputy or Observer<br />

Number <strong>of</strong> Meetings<br />

Cr Terry Kenyon JP<br />

Cr Marlene Robinson<br />

Cr Martin Toldo<br />

from 15 October 2011<br />

Cr Barry McKenna<br />

Cr Michael Sabatino<br />

Cr Chris Cornish<br />

from 15 October 2011<br />

Cr Mike Anderton JP<br />

Cr Graham Pittaway OAM<br />

Cr Alan Radford<br />

Cr Sonia Turkington<br />

Cr Sylvan Albert<br />

Cr Sally Palmer<br />

1 July-14 October 2011<br />

Cr Terry Blanchard<br />

1 July-14 October 2011<br />

Council Meetings<br />

Ordinary 12 12 8 9 9 8 9 11 12 10 10 12 3 2<br />

Special 9 9 9 7 5 5 7 9 9 9 8 8 1 1<br />

Standing Committees<br />

Planning and Development<br />

Services & Administration<br />

and Community Services<br />

Technical Services & Finance<br />

and Personnel Committee<br />

Management Committees<br />

12<br />

12<br />

Audit and Risk 2<br />

COB Child Care Association 2<br />

Golf Course 2<br />

Halliday House 1<br />

Local Emergency<br />

Management<br />

Local Government<br />

Community Housing Program<br />

Les Hansman Community<br />

Centre<br />

Residential Aged Care<br />

Facilities Governance<br />

Senior Citizens Centres 2<br />

Skate Park 2<br />

Advisory Committees<br />

Disability Access and<br />

Inclusion Plan<br />

Heritage Development 5<br />

Security Watch 6<br />

YMCA Management 2<br />

Youth 2<br />

Roadwise 4<br />

4<br />

2<br />

1<br />

1<br />

2<br />

P<br />

12<br />

P<br />

8<br />

P<br />

2<br />

P<br />

2<br />

P<br />

-<br />

P<br />

2<br />

P<br />

4<br />

P<br />

3<br />

P<br />

11<br />

D<br />

7<br />

P<br />

1<br />

P<br />

1<br />

P<br />

2<br />

P<br />

2<br />

P<br />

1<br />

P<br />

2<br />

P<br />

4<br />

P<br />

2<br />

D<br />

4<br />

P<br />

8<br />

D<br />

1<br />

P<br />

2<br />

P<br />

2<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

2<br />

P<br />

1<br />

D<br />

1<br />

D<br />

1<br />

P<br />

1<br />

D<br />

2<br />

P<br />

10<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

2<br />

P<br />

6<br />

P D<br />

1 1<br />

D<br />

5<br />

P<br />

9<br />

D<br />

1<br />

D<br />

1<br />

D<br />

4<br />

P<br />

10<br />

D<br />

1<br />

P<br />

4<br />

P<br />

11<br />

P D<br />

8 3<br />

D<br />

2<br />

P<br />

2<br />

P<br />

2<br />

D<br />

1<br />

P<br />

1<br />

P<br />

2<br />

P<br />

2<br />

P<br />

6<br />

P<br />

1<br />

P<br />

3<br />

P<br />

9<br />

P<br />

9<br />

P<br />

1<br />

D<br />

1<br />

P<br />

1<br />

P<br />

3<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

D<br />

2<br />

P D<br />

3 1<br />

D<br />

1<br />

P<br />

4<br />

P<br />

10<br />

D<br />

8<br />

P<br />

2<br />

P<br />

1<br />

P<br />

1<br />

P<br />

4<br />

P<br />

10<br />

P<br />

0<br />

P<br />

3<br />

P<br />

6<br />

P<br />

1<br />

D<br />

3<br />

P<br />

3<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

3<br />

P<br />

4<br />

P<br />

3<br />

38<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Attendance Summary 2011-12 (...continued)<br />

P Committee Member | Attendance as Deputy or Observer<br />

Number <strong>of</strong> Meetings<br />

Cr Terry Kenyon JP<br />

Cr Marlene Robinson<br />

Cr Martin Toldo<br />

from 15 October 2011<br />

Cr Barry McKenna<br />

Cr Michael Sabatino<br />

Cr Chris Cornish<br />

from 15 October 2011<br />

Cr Mike Anderton JP<br />

Cr Graham Pittaway OAM<br />

Cr Alan Radford<br />

Cr Sonia Turkington<br />

Cr Sylvan Albert<br />

Cr Sally Palmer<br />

1 July-14 October 2011<br />

Cr Terry Blanchard<br />

1 July-14 October 2011<br />

Working Groups / Parties<br />

<strong>Bayswater</strong> Triangle Traffic<br />

Management<br />

2<br />

P<br />

1<br />

P<br />

1<br />

P<br />

2<br />

Changes They’ve Seen 4<br />

P<br />

4<br />

D<br />

1<br />

P<br />

3<br />

P<br />

3<br />

Board Meetings<br />

COB Child Care Association<br />

AGM<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

External Committees<br />

Avon Descent Liaison<br />

Committee<br />

2<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

P<br />

1<br />

D<br />

1<br />

<strong>Bayswater</strong> SES 6<br />

P<br />

3<br />

P<br />

1<br />

P<br />

1<br />

Community Aviation<br />

Consultation Group<br />

2<br />

P<br />

1<br />

Eastern Metropolitan<br />

Regional Council<br />

Management Committee<br />

10<br />

D<br />

2<br />

P<br />

10<br />

D<br />

9<br />

Eastern Metropolitan<br />

Regional Council<br />

Management Committee<br />

Special Meeting(s)<br />

1<br />

P<br />

1<br />

P<br />

1<br />

Perth Airports Municipalities<br />

Group Inc<br />

4<br />

P<br />

1<br />

WALGA East Metropolitan<br />

Zone Management<br />

Committee<br />

7<br />

P<br />

3<br />

D<br />

1<br />

P<br />

4<br />

D<br />

1<br />

P<br />

5<br />

D<br />

2<br />

D<br />

1<br />

Legend:<br />

P<br />

D<br />

Committee Member<br />

Attendance as an Observer or Deputy<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

39


Abridged Financial<br />

Statements<br />

The following statements form part <strong>of</strong> the abridged<br />

version <strong>of</strong> the 2011-12 Financial <strong>Report</strong>.<br />

A comprehensive set <strong>of</strong> financial reports, inclusive <strong>of</strong><br />

Notes to the Accounts is available on the CD attached<br />

to the inside back cover or upon request.<br />

Independent Auditor’s <strong>Report</strong> 41<br />

Statement by the Chief Executive Officer 42<br />

Statement <strong>of</strong> Comprehensive Income<br />

Statement by Nature or Type 43<br />

Statement by Program 45<br />

Statement <strong>of</strong> Financial Position 47<br />

Statment <strong>of</strong> Changes in Equity 48<br />

Statement <strong>of</strong> Cash Flows 49<br />

Rate Setting Statement 51<br />

40 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


MACRI<br />

+<br />

PARTNERS<br />

Certified Practising Accountants<br />

PARTNERS<br />

Anthony Macri FCPA<br />

Domenic Macri CPA<br />

Connie De Felice CA<br />

INDEPENDENT AUDITOR’S REPORT<br />

TO: RATEPAYERS OF CITY OF BAYSWATER<br />

We have audited the financial report <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong>, which comprises the Statement <strong>of</strong> Financial Position as at<br />

30 June 2012 and the Statement <strong>of</strong> Comprehensive Income by Nature or Type, Statement <strong>of</strong> Comprehensive Income by<br />

Program, Statement <strong>of</strong> Changes in Equity, Statement <strong>of</strong> Cash Flows and Rate Setting Statement for the year ended on that<br />

date and a summary <strong>of</strong> significant accounting policies and other explanatory notes.<br />

Council’s Responsibility for the Financial <strong>Report</strong><br />

Council is responsible for the preparation and fair presentation <strong>of</strong> the financial report in accordance with Australian<br />

Accounting Standards (including the Australian Accounting Interpretations), the Local Government Act 1995 (as amended)<br />

and the Local Government (Financial Management) Regulations 1996 (as amended). This responsibility includes<br />

establishing and maintaining internal controls relevant to the preparation and fair presentation <strong>of</strong> the financial report that is<br />

free from material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and<br />

making accounting estimates that are reasonable in the circumstances.<br />

Auditor’s Responsibility<br />

Our responsibility is to express an opinion on the financial report based on our audit. Our audit has been conducted in<br />

accordance with Australian Auditing Standards. These Auditing Standards require that we comply with the relevant ethical<br />

requirements relating to audit engagements and plan and perform the audit to obtain reasonable assurance whether the<br />

financial report is free from material mistake.<br />

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial<br />

report. The procedure selected depends on the auditor’s judgement, including the assessment <strong>of</strong> the risks <strong>of</strong> material<br />

misstatements <strong>of</strong> the financial report, whether due to fraud or error. In making those risk assessments, the auditor<br />

considers internal control relevant to the entity’s preparation and fair presentation <strong>of</strong> the financial report in order to design<br />

audit procedures that are appropriate in the circumstances, but not for the purpose <strong>of</strong> expressing an opinion on the<br />

effectiveness <strong>of</strong> the entity’s internal control. An audit also includes evaluating the appropriateness <strong>of</strong> accounting policies<br />

used and the reasonableness <strong>of</strong> accounting estimates made by the Council, as well as evaluating the overall presentation<br />

<strong>of</strong> the financial report.<br />

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.<br />

Independence<br />

In conducting our audit, we followed applicable independence requirements <strong>of</strong> Australian pr<strong>of</strong>essional ethical<br />

pronouncements.<br />

Auditor’s Opinion<br />

In our opinion, the financial report <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong>:<br />

(i) gives a true and fair view <strong>of</strong> the financial position <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> as at 30 June 2012 and <strong>of</strong> its financial<br />

performance for the year ended on that date; and<br />

(ii) complies with the Local Government Act 1995 (as amended), the Local Government (Financial Management) Regulations<br />

1996 (as amended) and the Australian Accounting Standards (including the Australian Accounting Interpretations).<br />

Statutory Compliance<br />

We did not during the course <strong>of</strong> the audit become aware <strong>of</strong> any instances where the Council did not comply with the<br />

requirements <strong>of</strong> the Local Government Act 1995 (as amended) and the Local Government (Financial Management)<br />

Regulations 1996 (as amended).<br />

Matters Relating to the Electronic Publication <strong>of</strong> the Audited Financial <strong>Report</strong><br />

This auditor’s report relates to the financial report <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> for the year ended 30 June 2012 included on<br />

the <strong>City</strong>’s website. The Council is responsible for the integrity <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong>’s website. The auditor’s report refers<br />

only to the subject matter described above. It does not provide an opinion on any other information which may have been<br />

hyperlinked to/from these statements. If users <strong>of</strong> the financial report are concerned with the inherent risk arising from<br />

publication on a website, they are advised to refer to the hard copy <strong>of</strong> the audited financial report to confirm the information<br />

contained in this website version <strong>of</strong> the annual report.<br />

MACRI PARTNERS<br />

CERTIFIED PRACTISING ACCOUNTANTS<br />

SUITE 2, 137 BURSWOOD ROAD<br />

BURSWOOD WA 6100<br />

PERTH<br />

DATED THIS 7TH DAY OF NOVEMBER 2012<br />

A MACRI<br />

PARTNER<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

+<br />

41


Statement by the Chief Executive Officer<br />

<strong>City</strong> <strong>of</strong> <strong>Bayswater</strong><br />

Financial <strong>Report</strong> for the Year Ended 30 June 2012<br />

Local Government Act 1995<br />

Local Government (Financial Management) Regulations 1996<br />

The attached financial report <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> being the annual financial report and supporting notes and other<br />

information for the financial year ended 30 June 2012 is in my opinion properly drawn up to fairly present the financial<br />

position <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Bayswater</strong> at 30 June 2012 and the results <strong>of</strong> the operations for the financial year then ended in<br />

accordance with the Australian Accounting Standards and comply with the provisions <strong>of</strong> the Local Government Act 1995<br />

and Regulations under that Act.<br />

Signed on the Seventh day <strong>of</strong> November 2012.<br />

Francesca Lefante, BA (Urb & Reg Stud), Grad Dip (Urb & Reg Plan)<br />

Chief Executive Officer<br />

42<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Statement <strong>of</strong> Comprehensive Income<br />

Statement <strong>of</strong> Comprehensive Income by Nature or Type<br />

OPERATING INCOME<br />

Main Entity<br />

Consolidated<br />

Note 11/12 Budget 10/11 11/12 10/11<br />

Rates & Charges $31,108,258 $31,246,391 $28,823,990 $31,108,258 $28,823,990<br />

Income from Council<br />

Fees and Charges 21 $18,138,359 $18,250,525 $16,556,010 $21,017,470 $19,209,521<br />

Grants & Subsidies 16 $9,317,144 $6,760,867 $7,794,380 $10,774,522 $9,040,239<br />

Contributions $2,924,700 $1,348,328 $2,292,432 $2,982,613 $2,315,911<br />

Interest Earned $2,428,856 $1,802,745 $2,011,559 $2,517,137 $2,094,343<br />

Aged Bond Retention $412,600 $334,000 $358,350 $412,600 $358,350<br />

Other $60,796 $74,500 $89,153 $60,796 $89,153<br />

TOTAL OPERATING INCOME $64,390,713 $59,817,356 $57,925,874 $68,873,396 $61,931,507<br />

OPERATING EXPENSES<br />

Employee Costs<br />

Salaries & Wages $21,070,827 $20,299,314 $18,792,294 $23,958,089 $21,567,477<br />

Superannuation $2,270,446 $2,322,316 $2,047,116 $2,535,891 $2,281,994<br />

Workers Compensation $367,396 $440,875 $322,711 $367,396 $365,195<br />

Conferences/Training $274,041 $369,315 $294,538 $291,797 $314,481<br />

$23,982,710 $23,431,820 $21,456,659 $27,153,173 $24,529,147<br />

Utility Charges $3,123,555 $3,222,961 $2,666,270 $3,167,730 $2,706,395<br />

Insurance $697,604 $834,065 $592,321 $737,848 $617,882<br />

Depreciation $10,029,742 $6,322,500 $7,576,133 $10,116,317 $7,656,195<br />

Refuse Services 8,064,606 7,955,673 7,717,041 8,064,606 7,717,041<br />

Materials/Other 18,004,047 16,381,256 15,732,072 18,770,625 16,373,798<br />

$39,919,554 $34,716,455 $34,283,837 $40,857,126 $35,071,311<br />

TOTAL OPERATING<br />

EXPENSES $63,902,264 $58,148,275 $55,740,496 $68,010,299 $59,600,458<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

43


Statement <strong>of</strong> Comprehensive Income (cont)<br />

for the year ended June 2012<br />

Statement <strong>of</strong> Comprehensive Income by Nature or Type (cont)<br />

BORROWING COSTS<br />

Main Entity<br />

Consolidated<br />

Note 11/12 Budget 10/11 11/12 10/11<br />

Interest on Financing $18,851 $22,444 $22,850 $18,851 $22,850<br />

GRANTS/CONTRIBUTIONS<br />

FOR THE DEVELOPMENT<br />

OF ASSETS<br />

Grants & Subsidies 16 $1,721,618 $1,754,922 $8,718,839 $1,726,398 $8,734,814<br />

DISPOSAL OF ASSETS<br />

Proceeds <strong>of</strong> Sale $565,936 $450,000 $572,849 $565,936 $572,849<br />

Book Value $738,861 $790,056 $719,853 $738,861 $719,853<br />

(Pr<strong>of</strong>it)/Loss on Disposal $172,925 $340,056 $147,004 $172,925 $147,004<br />

Increase In Equity -<br />

Joint Venture 15(c) $2,713,043 - $1,772,161 $2,713,043 $1,772,161<br />

NET RESULT $4,731,334 $3,061,503 $12,506,523 $5,110,762 $12,668,168<br />

Other Comprehensive Income<br />

Changes in Non-Current<br />

Assets<br />

Revaluation $24,588,692 - $10,244,951 $24,588,692 $10,244,951<br />

TOTAL<br />

COMPREHENSIVE<br />

INCOME $29,320,026 $3,061,503 $22,751,474 $29,699,454 $22,913,119<br />

This Statement <strong>of</strong> Comprehensive Income should be read in conjunction with the accompanying notes.<br />

44 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Statement <strong>of</strong> Comprehensive Income<br />

for the year ended 30 June 2012<br />

Statement <strong>of</strong> Comprehensive Income by Program<br />

OPERATING REVENUES<br />

Main Entity<br />

Consolidated<br />

11/12 Budget 10/11 11/12 10/11<br />

General Purpose Funding $36,069,328 $33,927,786 $32,665,287 $36,069,328 $32,665,287<br />

Law Order & Public Safety $150,571 $80,230 $143,513 $150,571 $143,513<br />

Health $124,907 $87,900 $124,218 $124,907 $124,218<br />

Welfare & Education $10,320,217 $8,443,629 $8,542,846 $14,802,900 $12,548,479<br />

Housing $89,674 $74,200 $70,030 $89,674 $70,030<br />

Community Amenities $10,007,895 $9,526,336 $9,323,236 $10,007,895 $9,323,236<br />

Recreation & Culture $6,534,855 $6,465,575 $5,633,328 $6,534,855 $5,633,328<br />

Transport $460,729 $487,000 $458,811 $460,729 $458,811<br />

Economic Services $549,958 $640,200 $706,878 $549,958 $706,878<br />

Other Property & Services $82,579 $84,500 $257,727 $82,579 $257,727<br />

Total operating revenue $64,390,713 $59,817,356 $57,925,874 $68,873,396 $61,931,507<br />

OPERATING EXPENSES<br />

(Excluding Finance Costs)<br />

General Purpose Funding $725,793 $552,241 $656,812 $725,793 $656,812<br />

Governance/Administration $4,180,810 $4,171,651 $3,977,608 $4,180,810 $3,977,608<br />

Law Order & Public Safety $2,007,941 $1,930,052 $1,919,126 $2,007,941 $1,919,126<br />

Health $1,370,708 $1,338,480 $1,234,653 $1,370,708 $1,234,653<br />

Welfare & Education $9,197,107 $8,917,011 $8,193,152 $13,305,142 $12,053,114<br />

Housing $107,140 $140,765 $107,234 $107,140 $107,234<br />

Community Amenities $10,834,847 $10,464,437 $10,012,241 $10,834,847 $10,012,241<br />

Recreation & Culture $24,779,635 $23,006,759 $21,542,474 $24,779,635 $21,542,474<br />

Transport $6,932,462 $4,675,195 $4,723,950 $6,932,462 $4,723,950<br />

Economic Services $1,465,344 $1,435,427 $1,200,362 $1,465,344 $1,200,362<br />

Other Property & Services $2,300,477 $1,516,257 $2,172,884 $2,300,477 $2,172,884<br />

Total operating expenses $63,902,264 $58,148,275 $55,740,496 $68,010,299 $59,600,458<br />

FINANCE COSTS<br />

Recreation & Culture $18,851 $22,444 $22,850 $18,851 $22,850<br />

$18,851 $22,444 $22,850 $18,851 $22,850<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

45


Statement <strong>of</strong> Comprehensive Income (cont)<br />

for the year ended 30 June 2012<br />

Statement <strong>of</strong> Comprehensive Income by Program (cont)<br />

Main Entity<br />

Consolidated<br />

11/12 Budget 10/11 11/12 10/11<br />

GRANTS/CONTRIBUTIONS<br />

FOR THE DEVELOPMENT<br />

OF ASSETS - $663,200 - - -<br />

Law Order Public Safety $11,695 - $5,900 $11,695 $5,900<br />

Welfare & Education $63,558 - $109,255 $68,338 $125,230<br />

Recreation & Culture $395,268 $328,310 $8,004,659 $395,268 $8,004,659<br />

Transport $1,251,098 $763,412 $599,025 $1,251,098 $599,025<br />

PROFIT/(LOSS) ON THE<br />

DISPOSAL OF ASSETS<br />

$1,721,619 $1,754,922 $8,718,839 $1,726,399 $8,734,814<br />

General Administration ($11,353) ($30,726) ($45,279) ($11,353) ($45,279)<br />

Law Order & Public Safety ($29,436) ($17,876) - ($29,436) -<br />

Health ($9,462) ($17,377) ($10,041) ($9,462) ($10,041)<br />

Welfare ($2,083) - $14,065 ($2,083) $14,065<br />

Recreation & Culture ($14,239) ($14,120) ($8,370) ($14,239) ($8,370)<br />

Transport ($25,286) ($35,176) ($21,006) ($25,286) ($21,006)<br />

Economic Services ($13,276) ($69,752) ($14,587) ($13,276) ($14,587)<br />

Other Property & Services ($67,790) ($155,029) ($61,786) ($67,790) ($61,786)<br />

Pr<strong>of</strong>it (Loss) on Disposal ($172,925) ($340,056) ($147,004) ($172,925) ($147,004)<br />

Change in Equity -<br />

Joint Venture<br />

Other Property & Services $2,713,043 - $1,772,161 $2,713,043 $1,772,161<br />

NET RESULT $4,731,334 $3,061,503 $12,506,524 $5,110,762 $12,668,168<br />

Other Comprehensive Income<br />

Changes in Non-Current<br />

Assets Revaluation<br />

Transport $24,588,692 - $10,244,951 $24,588,692 $10,244,951<br />

TOTAL<br />

COMPREHENSIVE<br />

INCOME $29,320,026 $3,061,503 $22,751,474 $29,699,454 $22,913,119<br />

46 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Statement <strong>of</strong> Financial Position<br />

as at 30 June 2012<br />

Note Main Entity Consolidated<br />

11/12 10/11 11/12 10/11<br />

ASSETS<br />

Cash and Cash Equivalents 5 $26,406,146 $22,377,081 $28,289,290 $23,943,396<br />

Trade and Other Receivables 6 $4,859,704 $5,414,934 $4,927,627 $5,502,667<br />

Inventory 7 $102,049 $80,846 $102,049 $80,846<br />

Other $14,470 $8,629 $14,470 $10,745<br />

$31,382,369 $27,881,490 $33,333,436 $29,537,654<br />

Non-Current Assets<br />

Trade and Other Receivables 6 $804,608 $844,283 $804,608 $844,283<br />

Property Plant & Equipment 8 $87,008,817 $87,613,597 $87,581,787 $88,126,197<br />

Infrastructure 9 $142,633,074 $117,104,036 $142,633,074 $117,104,036<br />

Equity Investments 15(c) $14,824,118 $12,111,075 $14,824,118 $12,111,075<br />

$245,270,617 $217,672,991 $245,843,587 $218,185,591<br />

TOTAL ASSETS $276,652,986 $245,554,481 $279,177,023 $247,723,245<br />

LIABILITIES<br />

Trade and Other Payables 10(a) $4,074,083 $5,182,363 $4,303,704 5,396,712<br />

Provisions 10(b) $4,289,236 $3,764,985 $4,764,256 4,302,054<br />

Borrowings 11 $64,064 $62,601 $64,064 62,601<br />

$8,427,383 $9,009,949 $9,132,024 $9,761,367<br />

Non-Current Liabilities<br />

Provisions 10(b) $456,303 $378,491 $532,392 $431,958<br />

Borrowings 11 $224,003 $287,858 $224,003 $287,858<br />

Other 12 $23,934,892 $21,587,804 $23,934,892 $21,587,804<br />

$24,615,198 $22,254,153 $24,691,287 $22,307,620<br />

TOTAL LIABILITIES $33,042,581 $31,264,102 $33,823,311 $32,068,987<br />

NET ASSETS/(LIABILITIES) $243,610,405 $214,290,379 $245,353,712 $215,654,258<br />

EQUITY<br />

Retained Surplus $182,954,686 $179,163,532 $183,767,343 $179,681,487<br />

Reserves - Cash Backed 14 $10,690,926 $9,750,746 $11,621,576 $10,596,670<br />

Reserves - Asset Revaluation $49,964,793 $25,376,101 $49,964,793 $25,376,101<br />

TOTAL EQUITY $243,610,405 $214,290,379 $245,353,712 $215,654,258<br />

This Statement <strong>of</strong> Financial Position should be read in conjunction with the accompanying notes.<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

47


Statement <strong>of</strong> Changes in Equity<br />

as at 30 June 2012<br />

Main Entity Consolidated<br />

Note Retained Reserves Cash Asset Total Equity Retained Reserves Cash Asset Total Equity<br />

Surplus Backed Revaluation Surplus Backed Revaluation<br />

Reserve Reserve<br />

Balance as at I July 2010 $167,701,095 $8,706,661 $15,131,150 $191,538,906 $168,141,657 $9,468,333 $15,131,150 $192,741,140<br />

Net Result $12,506,522 - - $12,506,522 $12,668,167 - - $12,668,167<br />

Total Other Comprehensive Income - - $10,244,951 $10,244,951 - - $10,244,951 $10,244,951<br />

Transfer From/(to) Reserves ($1,044,085) $1,044,085 - - ($1,128,337) $1,128,337 - -<br />

Balance 30 June 2011 $179,163,532 $9,750,746 $25,376,101 $214,290,379 $179,681,487 $10,596,670 $25,376,101 $215,654,258<br />

Net Result $4,731,334 - - $4,731,334 $5,110,762 - - $5,110,762<br />

Total Other Comprehensive Income - - $24,588,692 $24,588,692 - - $24,588,692 $24,588,692<br />

Transfer From/(to) Reserves ($940,180) $940,180 - - ($1,024,906) $1,024,906 - -<br />

Balance 30 June 2012 13 $182,954,686 $10,690,926 $49,964,793 $243,610,405 $183,767,343 $11,621,576 $49,964,793 $245,353,712<br />

This Statement <strong>of</strong> Changes in Equity should be read in conjunction with the accompanying notes.<br />

48 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Statement <strong>of</strong> Cash Flows<br />

for the year ended 30 June 2012<br />

CASH FLOWS FROM<br />

OPERATING ACTIVITIES<br />

Receipts<br />

Main Entity<br />

Consolidated<br />

Note 11/12 Budget 10/11 11/12 10/11<br />

Rates $30,945,792 $32,000,000 $28,861,597 $30,945,792 $28,861,597<br />

Income from Property/<br />

Other Charges $19,310,931 $18,250,525 $19,315,423 $22,219,564 $21,987,570<br />

Grants & Subsidies $9,129,199 $8,600,000 $7,103,287 $10,608,818 $8,330,285<br />

Reimbursements/Contributions $1,208,814 $852,053 $1,264,296 $896,733<br />

Interest Earned/Other $2,433,130 $1,700,000 $2,510,297 $2,521,411 $2,593,081<br />

Goods & Services Tax $1,953,319 $2,500,000 $3,116,259 $1,992,733 $3,116,259<br />

Other - $60,000 - - -<br />

Payments<br />

$64,981,185 $63,110,525 $61,758,916 $69,552,614 $65,785,525<br />

Employee Costs $23,281,082 $23,500,000 $20,813,789 $26,484,158 $23,744,317<br />

Utility Charges $3,123,555 $3,222,961 $2,666,270 $3,167,730 $2,706,395<br />

Insurance 697,604 $834,065 $592,321 $737,848 $617,882<br />

Refuse Services 8,064,606 $8,150,000 $7,214,343 $8,064,606 $7,214,343<br />

Materials/Other 21,064,513 $21,901,816 $25,541,278 $21,889,455 $26,219,823<br />

$56,231,360 $57,608,842 $56,828,001 $60,343,797 $60,502,760<br />

Net Cash Provided<br />

By Operating Activities 14(b) $8,749,824 $5,501,683 $4,930,915 $9,208,817 $5,282,765<br />

CASH FLOWS FROM<br />

INVESTING ACTIVITIES<br />

Payments for Purchase<br />

<strong>of</strong> Fixed Assets ($4,601,536) ($15,993,294) ($18,074,022) ($4,748,481) ($18,235,204)<br />

Payments for<br />

Infrastructure Assets ($6,502,632) ($4,697,387) ($6,502,632) ($4,697,387)<br />

Proceeds from Sale<br />

<strong>of</strong> Fixed Assets $565,936 $450,000 $572,849 $565,936 $572,849<br />

Grants - Capital $3,131,501 $1,500,000 $8,055,753 $3,136,282 $8,055,753<br />

Net Cash Used in<br />

Investing Activities ($7,406,731) ($14,043,294) ($14,142,807) ($7,548,895) ($14,303,989)<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

49


Statement <strong>of</strong> Cash Flows (cont)<br />

for the year ended 30 June 2012<br />

Main Entity<br />

Consolidated<br />

Note 11/12 Budget 10/11 11/12 10/11<br />

CASH FLOWS FROM<br />

FINANCING ACTIVITIES<br />

Borrowings ($62,392) - ($58,255) ($62,392) ($58,255)<br />

Ingoing Fees Received $5,784,985 - $6,814,551 $5,784,985 $6,814,551<br />

Ingoing Fees Refunded ($3,036,621) - ($2,542,819) ($3,036,621) ($2,542,819)<br />

Net Cash Provided by (used<br />

in) Financing Activities $2,685,972 - $4,213,477 $2,685,972 $4,213,477<br />

NET INCREASE/(DECREASE)<br />

IN CASH HELD $4,029,065 ($8,541,611) ($4,998,414) $4,345,894 ($4,807,746)<br />

CASH AT THE BEGINNING<br />

OF THE YEAR $22,377,081 $16,500,000 $27,375,495 $23,943,396 $28,751,142<br />

CASH AT THE END OF<br />

THE YEAR 14(a) $26,406,146 $7,958,389 $22,377,081 $28,289,290 $23,943,396<br />

This Statement <strong>of</strong> Cash Flows should be read in conjunction with the accompanying notes.<br />

50 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12


Rate Setting Statement<br />

for the year ended 30 June 2012<br />

2011/2012 2011/2012 2010/2011<br />

BUDGET $ Actual $ Actual $<br />

REVENUE<br />

General Purpose Funding 3,016,395 4,961,064 3,144,973<br />

Law Order & Public Safety 80,230 150,571 143,513<br />

Health 87,900 124,907 124,218<br />

Welfare & Education 8,443,629 10,320,217 8,542,849<br />

Housing 74,200 89,674 70,030<br />

Community Amenities 9,526,336 10,007,895 9,323,236<br />

Recreation & Culture 6,465,575 6,534,855 5,633,328<br />

Transport 487,000 460,729 458,811<br />

Economic Services 640,200 549,958 706,878<br />

Other Property & Services 84,500 82,579 257,727<br />

$28,905,965 $33,282,449 $28,405,563<br />

LESS<br />

OPERATING EXPENDITURE<br />

General Purpose Funding 552,241 725,793 656,812<br />

Governance 4,171,651 4,192,163 4,022,887<br />

Law Order & Public Safety 1,947,928 2,037,377 1,919,126<br />

Health 1,355,856 1,380,170 1,244,693<br />

Welfare & Education 8,917,011 9,199,189 8,179,087<br />

Housing 140,765 107,140 107,234<br />

Community Amenities 10,464,437 10,834,847 10,012,241<br />

Recreation & Culture 23,043,323 24,812,725 21,573,694<br />

Transport 4,710,370 6,957,749 4,744,956<br />

Economic Services 1,490,465 1,478,620 1,214,949<br />

Other Property & Services 1,716,728 2,368,267 2,234,673<br />

$58,510,775 $64,094,040 $55,910,352<br />

ADD<br />

CONTRIBUTIONS/GRANTS APPLIED FOR<br />

THE DEVELOPMENT OF ASSETS<br />

General Purpose Funding 663,200 - -<br />

Law Order Public Safety - 11,695 5,900<br />

Welfare & Education - 63,558 109,255<br />

Recreation & Culture 328,310 395,268 8,004,659<br />

Transport 763,412 1,251,098 1,290,118<br />

$1,754,922 $1,721,619 $9,409,932<br />

Amount Required to Fund Operations ($27,849,888) ($29,089,972) ($18,094,857)<br />

CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12<br />

51


Rate Setting Statement (cont)<br />

for the year ended 30 June 2012<br />

2011/2012 2011/2012 2010/2011<br />

BUDGET $ Actual $ Actual $<br />

SIGNIFICANT ITEM<br />

Changes in Non-Current Assets Revaluation - 24,588,692 10,244,951<br />

EMRC Asset revaluation - 2,713,043 1,772,161<br />

TOTAL OPERATIONS ($27,849,888) ($1,788,237) ($6,077,745)<br />

ADD<br />

Other Deferred Debtors (Non-Current) - (24,178) (34,350)<br />

Selling Price <strong>of</strong> Assets 450,000 565,936 572,849<br />

Reserves Movement (Net) 1,284,827 (940,180) (1,044,086)<br />

Principal Loan Recoveries 58,256 63,855 -<br />

Aged Persons Liability Movement Adjustment - 2,347,089 3,936,829<br />

Provision for Long Service Leave<br />

Non-Current Adjustment 99,500 77,812 174,700<br />

Loss on Disposal <strong>of</strong> Assets 340,056 172,925 147,004<br />

Depreciation 6,322,500 10,029,742 7,576,132<br />

$8,555,139 $12,293,001 $11,329,078<br />

LESS<br />

Capital Expenditure 15,993,294 11,104,167 22,771,408<br />

Joint Venture Asset Revaluation - 2,713,043 1,772,161<br />

Changes In Non-Current Assets Revaluation - 24,588,692 10,244,951<br />

Repayment <strong>of</strong> Debt 58,256 - -<br />

$16,051,550 $38,405,902 $34,788,520<br />

OPENING BALANCE $4,934,908 $9,120,795 $9,828,761<br />

CLOSING BALANCE $500,000 $12,327,915 $9,120,795<br />

AMOUNT TO BE MADE UP FROM RATES ($30,911,391) ($31,108,258) ($28,829,221)<br />

This Rate Setting Statement should be read in conjunction with the accompanying notes<br />

MEMBERS’ EXPENSES<br />

Budget<br />

Actual<br />

Meeting Fees:<br />

Mayoral Allowance 61,400 60,400<br />

Deputy Mayoral Allowance 23,900 23,900<br />

Councillor Meeting Fees/Other Expenses 102,600 102,150<br />

TOTAL $187,900 $186,450<br />

52 CITY OF BAYSWATER <strong>Annual</strong> <strong>Report</strong> 2011-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!