11.11.2014 Views

(best examples and good practices) on household organic waste ...

(best examples and good practices) on household organic waste ...

(best examples and good practices) on household organic waste ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

209<br />

The project was c<strong>on</strong>structed in an area covering 235 dectares near the dump<br />

of "Kouroupito", where untreated <strong>waste</strong> of the Prefecture used to be disposed<br />

of. The plant is designed to operate six (6) hours per day, 5 days a week (260<br />

days per year). It will have approximately eighty (80) employees when fully<br />

developed. Its total installed power is 2.3MW.<br />

The plant's total operati<strong>on</strong>al costs, when it has been fully developed, are<br />

estimated to approach 40€/t<strong>on</strong>. Revenues expected from the sales of soil<br />

improvement <str<strong>on</strong>g>and</str<strong>on</strong>g> recyclable material are expected to reach approximately<br />

15€/t<strong>on</strong>. The net operati<strong>on</strong>al cost is estimated to be 25-30€/t<strong>on</strong>.<br />

The facilities combine modern, innovative <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>ment <str<strong>on</strong>g>and</str<strong>on</strong>g> human<br />

friendly technologies <str<strong>on</strong>g>and</str<strong>on</strong>g> comprise an integrated <str<strong>on</strong>g>and</str<strong>on</strong>g> effective soluti<strong>on</strong> for<br />

the management of <strong>household</strong> <strong>waste</strong> which is produced in the broader area of<br />

Chania.<br />

With respect to the c<strong>on</strong>structi<strong>on</strong> of the Project, the first cell of the SSBSW was<br />

completed <str<strong>on</strong>g>and</str<strong>on</strong>g> set into operati<strong>on</strong> within the first six (6) m<strong>on</strong>ths from the<br />

signature of the c<strong>on</strong>tract, when the sanitary burial of mixed <strong>waste</strong> began in<br />

February of 2003. (P.A.C., 2009)<br />

The statistical data of the plant can be seen in (Table 12.).<br />

(Table 12.): Chania <strong>waste</strong> management plant statistical data(P.A.C., 2009)<br />

Incoming<br />

T<strong>on</strong>s/year<br />

Municipal solid <strong>waste</strong> 70000<br />

Branches <str<strong>on</strong>g>and</str<strong>on</strong>g> grass 10500<br />

Producti<strong>on</strong><br />

T<strong>on</strong>s/year<br />

Compost 20000<br />

paper 9000<br />

plastic 5200<br />

Ir<strong>on</strong> metals 1800<br />

aluminum 600

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!