e/;kapy fo|qr forj.k fuxe fyfeVsM<br />

fo|qr forj.k [k.M & izFke] mUuko<br />

vYidkyhu fufonk lwpuk<br />

a<br />

a<br />

fo|qr forj.k [k.M izFke mUuko ds vUrxZr v/kksfyf[kr dk;ksaZ gsrq iathd`r] vuqHkoh] vk;dj ,oa lsokdj iathd`r Bsdsnkjks ls<br />

eqgjcUn fufonk;s vyx&vyx nks Hkkxksa es a] izFke Hkkx es /kjksgj /kujkf’k] vk;dj@lsokdj] iath;u izek.k i= ,oa vuqHko izek.k i= vkfn<br />

rFkk f}rh; Hkkx es fufofnr njsa] rduhdh fooj.k ,oa vU; fu;e o ‘krsZ gksa fufonk ds lEeq[k vafdr fufonk [kqyus dh frfFk dks 15%00<br />

cts rd vkeaf=r dh tkrh gSA fufonk;s mlh fnu 16%00 cts lkoZtfud #i ls mifLFkr fufonknkrkvks@muds izfrfuf/k;ks ds le{k [kksyh<br />

tk;sxhA izR;sd fufonk dk ewY; :0 230-00 ¼ O;kikj dj lfgr½ fu/kkZfjr gS] tks vizfrns; gSA<br />

dz0 fufonk la0 dk;Z dk fooj.k /kjksgj fufonk [kqyus dh frfFk<br />

la0<br />

/kujkf’k #0<br />

1 28@fofo[kizm<br />

@2013&14<br />

2 29@fofo[kizm<br />

@2013&14<br />

3 30@fofo[kizm<br />

@2013&14<br />

4 31@fofo[kizm<br />

@2013&14<br />

33@11 ds0oh0 fo|qr midsUnz flVh ikoj gkml+] mUuko ls fuxZr 11<br />

ds0oh0 iks”kdksa ,oa muls lEcfU/kr ,y0Vh0 ykbuksa rFkk midsUnzksa ds<br />

vuqj{k.k] rFkk ejEer] fo|qr foPNsnu iquZla;kstu ,oa miHkksDrkvksa dh<br />

f’kdk;rksa ds fuLrkj.k dk;Z gsrq dq’ky@vdq’ky Jfedksa dh 4 vnn xSax<br />

miyC/k djkus dk dk;ZA<br />

33@11 ds0oh0 fo|qr midsUnz iqjok+] mUuko ls fuxZr 11 ds0oh0 iks”kdksa<br />

,oa muls lEcfU/kr ,y0Vh0 ykbuksa rFkk midsUnzksa ds vuqj{k.k] rFkk<br />

ejEer] fo|qr foPNsnu iquZla;kstu ,oa miHkksDrkvksa dh f’kdk;rksa ds<br />

fuLrkj.k dk;Z gsrq dq’ky@vdq’ky Jfedksa dh 4 vnn xSax miyC/k djkus<br />

dk dk;ZA<br />

33@11 ds0oh0 fo|qr midsUnz ch?kkiqj+] mUuko ls fuxZr 11 ds0oh0 iks”kdksa<br />

,oa muls lEcfU/kr ,y0Vh0 ykbuksa rFkk midsUnzksa ds vuqj{k.k] rFkk<br />

ejEer] fo|qr foPNsnu iquZla;kstu ,oa miHkksDrkvksa dh f’kdk;rksa ds<br />

fuLrkj.k dk;Z gsrq dq’ky@vdq’ky Jfedksa dh 4 vnn xSax miyC/k djkus<br />

dk dk;ZA<br />

fo|qr forj.k mi[k.M r`rh;] mUuko ds dk;Z{ks= esa 33@11 ds0oh0 fo|qr<br />

midsUnz ch?kkiqj ds vUrZxr {kfrxzLr ifjorZdksa dks Mcy iksy@fIyaFk ls<br />

mrkjus] VªkUlQkjej odZ’kki mUuko rd igqpkus] u;s ifjorZdksa dks fo|qr<br />

Hk.Mkj dsUnz mUuko ls dk;ZLFky rd ys tkus ,oa Mcy iksy@fIyaFk ij<br />

p


Madhyanchal<br />

Vidyut Vitaran<br />

Nigam Limited<br />

Electricity Distribution<br />

Division-I, Unnao.<br />

<strong>Tender</strong> <strong>No</strong>. 28/EDD-IU/2013-14<br />

DATE OF OPENING:-26-08-2013


<strong>Tender</strong> proforma<br />

(to be filled by tenderer)<br />

Important instruction of the tenderer<br />

Your tender shall not be considered if you fail to submit this proforma duly filled up replies should be<br />

completed without ambiguity and should be clearly written against each item.<br />

(Attach extra sheets if the space-left not sufficient)<br />

Sl.<br />

<strong>No</strong><br />

PARTICULARS<br />

1- Specification <strong>No</strong>. against which your are tenderer<br />

2- Receipt <strong>No</strong>. & Date vide which cost of tender specification<br />

fees deposited by you.<br />

3- Name & Address of tenderer<br />

REPLIES<br />

4- Year since when the tenderer has started execution of work<br />

tender.<br />

5- Do you agree to all the conditions of the tender specification<br />

and if not State the modifications clearly which you desire in<br />

general conditions from A/B. it may Please be noted that it<br />

shall be entirely at the desecration of the undersigned to accept<br />

or reject the modification proposed)<br />

6- Account of earn money deposited with full details be<br />

submitted here<br />

7- Please state clearly (Yes/<strong>No</strong>) if you would accept the order of<br />

modification in the form A/B are not acceptable to the<br />

corporation without imposing further conditions form your<br />

side.<br />

8- Give two reference who can certify your financial status and<br />

capability to undertake execution of work/Supply. One of the<br />

reference should be of any scheduled Bank of India.<br />

9- Name & Detailed address of <strong>Tender</strong>er/ Proprietor/<br />

Partners/Director be given.<br />

<strong>10</strong> Statement of past/current experience in similar works in the<br />

following form:-<br />

Sl<br />

no<br />

Name & address of<br />

ordering authority<br />

Order/<br />

Contract<br />

<strong>No</strong>. & Date<br />

Particular of<br />

work<br />

executed<br />

Quantum of work<br />

Ordered Completed Remarks<br />

1 2 3 4 5 6 7<br />

11- What is the validity period of your tender.<br />

12- Place & Date


Signature of <strong>Tender</strong>er<br />

With seal<br />

MADHYANC<strong>HAL</strong> VIDYUT VITARAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

Date of opening:-26-08-2013<br />

<strong>Tender</strong> Specification <strong>No</strong>. 28/EDD-IU/2013-14<br />

SCHEDULE OF RATES & QUANTUM OF WORK FOR PROVIDING MAN POWER (GANG) AT 33/11<br />

KV SUB STATION CITY POWER HOUSE UNNAO.<br />

Sl.<br />

<strong>No</strong>.<br />

Particulars of Work Unit Qty<br />

Rate (Per Day/<br />

Per Labour)<br />

Amount (Per<br />

Day)<br />

Providing man power (gang) for attending break<br />

downs of H.T/L.T. Lines due to broken<br />

conductor, blown fuses, puncture insulators etc.<br />

attending consumers complaints and<br />

disconnection of defaulting consumers every day<br />

for 8 hours including Sunday and holyday as per<br />

detail given below.<br />

1- Skilled labour having I.T.I. Cirtificate in<br />

Electrician/Wireman trade.<br />

2- Unskilled labour having experience for<br />

maintenance of H.T. & L.T. Lines.<br />

Total<br />

For 6 MONTH<br />

<strong>No</strong>s. 4<br />

<strong>No</strong>s. 8<br />

Signature & seal of<br />

Contractor<br />

Executive Engineer<br />

EDD-I Unnao


MADHYANC<strong>HAL</strong> VIDYUT VITRAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

<strong>Tender</strong> <strong>No</strong>. 28 /EDD-IU/2013-14<br />

SPECIAL TERMS & CONDITIONS<br />

1- The works will be carried out by the Contractor during the Agreement period of Six month<br />

from the date of commencement, under Electricity Distribution Division-I, Unnao.<br />

2- The skilled labour to be provided by the Contractor shall have the educational qualification of<br />

intermediate with I.T.I certificate in Electrician trade.<br />

3- The Contractor shall have Registration with Labour Commissioner for Engaging Labour which<br />

should be valid at least for agreement period. The photo copy of registration certificate shall be<br />

produced by the Contractor before taking up the work in hand.<br />

4- The Contractor shall also be registered with E.P.F. Commissioner and he will have to deposit<br />

the amount of E.P.F. deducted by him from the monthly wages of his labour in the office of<br />

E.P.F. Commissioner every month and photocopy of the same will be produce to Executive<br />

Engineer, Electricity Distribution Division-I, Unnao accordingly.<br />

5- Apart from above, the Contactor shall also be required to get registered with concerning<br />

authorities of Central Excise duty and Service Tax in respect of his aforesaid labour.<br />

6- The payment of the Ex-gratia will also be made to his labour by the Contractor, if it is found<br />

payable as per labour Act/Rules.<br />

7- The Skilled and un-skilled labour being engaged by the Contractor shall, in no case, be entitled<br />

for regular service of the Corporation.<br />

8- All T&P required for proper completion of assigned work, shall be arranged and provided to<br />

his labour by the Contractor him self at his own cost. However, all the required stock materials/<br />

component for proper completion of work shall arranged & provided by the Department free of<br />

cost.<br />

9- The Contractor shall be fully responsible for arranging accidental insurance policy for the<br />

compensation of his working personnel, if required as the Corporation shall not be held<br />

responsible for any compensation to his Labour in the event of any accident/mishap<br />

whatsoever.<br />

<strong>10</strong>- The Contractor will be required to pay minimum wages (in shape of A/C payee Cheque) to the<br />

employees engaged by him for the said purpose according to the rates approved by the Labour<br />

Commissioner and also amendment, if any, from time to time and subsequent approval by the<br />

Chief Engineer, M.V.V.N.L Lucknow/works Committee.<br />

11- The Contractor will issue Character Certificate in respect of each Employees provided by him<br />

and he will be responsible for any mischief committed by any of his labour.<br />

12- The Contractor shall have to follow instructions of the Engineer in charge of the Sub-Station or<br />

his representative in respect of proper operation & maintenance of Sub-Station.<br />

13- The log sheet & other requisite registers & stationery as well as stock materials/spares<br />

required for attending break downs/maintenance shall be supplied by the department and the<br />

account of their consumption shall be given by the contractor to Engineer supervising the<br />

work.


14- 90 % payment will be made by concerned Executive Engineer against running bill subject to<br />

the availability of funds and <strong>10</strong>% amount will be detained as security which will be paid after<br />

the completion of works in satisfactory condition and after recommendation of concerned Subdivisional<br />

officer.<br />

15- <strong>No</strong> Experience Certificate will be issued by any Officer of the Corporation to any Employee of<br />

the Contractor.<br />

Cont.


(2)<br />

16- In addition to above all the general terms & conditions of contract for execution of works will<br />

governed as per Form-A.<br />

17- Income tax/other deductions as UPPCL/<strong>MVVNL</strong> rules shall be deducted from the Contractor<br />

bills as per State/Central Government rates prevailing in the Department.<br />

18- The Contractor shall confirm in respect to the requirement of Chief Electrical Inspector to U.P.<br />

Government as and when required by them in respect to Electrical Safety Rules and<br />

Regulation.<br />

19- <strong>No</strong> Compensation for idle labour shall be payable to the Contractor in any circumstances. The<br />

compensation owning to accident/ incident during execution of work shall be paid by the<br />

Contractor at his own without any reference to UPPCL/<strong>MVVNL</strong> and constitutional obligation<br />

for such compensation shall be sole responsibility of the contractor.<br />

20- The damage, if any, caused loss to the department/work/ T&P by the Contractor him self or his<br />

staff shall be recovered in full from the pending bill(s)/ liability of the Contractor.<br />

21- The Superintending Engineer, Electricity Distribution Circle, Unnao will be the principal<br />

employer of the contract and the Concerned Executive Engineer shall function as Engineer-incharge<br />

of the contract. The work shall be carried out as per rules by the Contractor in strict<br />

supervision and to the entire satisfaction of Engineer-in-charge of the Division.<br />

22- All the terms & Conditions of the Labour act will be adhered to strictly by the contractor.<br />

23- The dispute arising, if any, taken into Court, shall be within the Jurisdiction of Unnao.<br />

24- The contract shall have to issue identity card to his employees engaged for the said purpose.<br />

Executive Engineer<br />

Electricity Distribution Division-I<br />

Unnao


Madhyanchal<br />

Vidyut Vitaran<br />

Nigam Limited<br />

Electricity Distribution<br />

Division-I, Unnao.<br />

<strong>Tender</strong> <strong>No</strong>. 29/EDD-IU/2013-14<br />

DATE OF OPENING:-26-08-2013


<strong>Tender</strong> proforma<br />

(to be filled by tenderer)<br />

Important instruction of the tenderer<br />

Your tender shall not be considered if you fail to submit this proforma duly filled up replies should be<br />

completed without ambiguity and should be clearly written against each item.<br />

(Attach extra sheets if the space-left not sufficient)<br />

Sl.<br />

<strong>No</strong><br />

PARTICULARS<br />

1- Specification <strong>No</strong>. against which your are tenderer<br />

2- Receipt <strong>No</strong>. & Date vide which cost of tender specification<br />

fees deposited by you.<br />

3- Name & Address of tenderer<br />

REPLIES<br />

4- Year since when the tenderer has started execution of work<br />

tender.<br />

5- Do you agree to all the conditions of the tender specification<br />

and if not State the modifications clearly which you desire in<br />

general conditions from A/B. it may Please be noted that it<br />

shall be entirely at the desecration of the undersigned to accept<br />

or reject the modification proposed)<br />

6- Account of earn money deposited with full details be<br />

submitted here<br />

7- Please state clearly (Yes/<strong>No</strong>) if you would accept the order of<br />

modification in the form A/B are not acceptable to the<br />

corporation without imposing further conditions form your<br />

side.<br />

8- Give two reference who can certify your financial status and<br />

capability to undertake execution of work/Supply. One of the<br />

reference should be of any scheduled Bank of India.<br />

9- Name & Detailed address of <strong>Tender</strong>er/ Proprietor/<br />

Partners/Director be given.<br />

<strong>10</strong> Statement of past/current experience in similar works in the<br />

following form:-<br />

Sl<br />

no<br />

Name & address of<br />

ordering authority<br />

Order/<br />

Contract<br />

<strong>No</strong>. & Date<br />

Particular of<br />

work<br />

executed<br />

Quantum of work<br />

Ordered Completed Remarks<br />

1 2 3 4 5 6 7<br />

11- What is the validity period of your tender.<br />

12- Place & Date<br />

Signature of <strong>Tender</strong>er<br />

With seal


MADHYANC<strong>HAL</strong> VIDYUT VITARAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

Date of opening:-26-08-2013<br />

<strong>Tender</strong> Specification <strong>No</strong>. 29/EDD-IU/2013-14<br />

SCHEDULE OF RATES & QUANTUM OF WORK FOR PROVIDING MAN POWER (GANG) AT 33/11<br />

KV SUB STATION PURWA, UNNAO .<br />

Sl.<br />

<strong>No</strong>.<br />

Particulars of Work Unit Qty<br />

Rate (Per Day/<br />

Per Labour)<br />

Amount (Per<br />

Day)<br />

Providing man power (gang) for attending break<br />

downs of H.T/L.T. Lines due to broken<br />

conductor, blown fuses, puncture insulators etc.<br />

attending consumers complaints and<br />

disconnection of defaulting consumers every day<br />

for 8 hours including Sunday and holyday as per<br />

detail given below.<br />

1- Skilled labour having I.T.I. Cirtificate in<br />

Electrician/Wireman trade.<br />

2- Unskilled labour having experience for<br />

maintenance of H.T. & L.T. Lines.<br />

Total<br />

For 6 MONTH<br />

<strong>No</strong>s. 4<br />

<strong>No</strong>s. 8<br />

Signature & seal of<br />

Contractor<br />

Executive Engineer<br />

EDD-I Unnao


MADHYANC<strong>HAL</strong> VIDYUT VITRAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

<strong>Tender</strong> <strong>No</strong>. 29 /EDD-IU/2013-14<br />

SPECIAL TERMS & CONDITIONS<br />

1- The works will be carried out by the Contractor during the Agreement period of Six month<br />

from the date of commencement, under Electricity Distribution Division-I, Unnao.<br />

2- The skilled labour to be provided by the Contractor shall have the educational qualification of<br />

intermediate with I.T.I certificate in Electrician trade.<br />

3- The Contractor shall have Registration with Labour Commissioner for Engaging Labour which<br />

should be valid at least for agreement period. The photo copy of registration certificate shall be<br />

produced by the Contractor before taking up the work in hand.<br />

4- The Contractor shall also be registered with E.P.F. Commissioner and he will have to deposit<br />

the amount of E.P.F. deducted by him from the monthly wages of his labour in the office of<br />

E.P.F. Commissioner every month and photocopy of the same will be produce to Executive<br />

Engineer, Electricity Distribution Division-I, Unnao accordingly.<br />

5- Apart from above, the Contactor shall also be required to get registered with concerning<br />

authorities of Central Excise duty and Service Tax in respect of his aforesaid labour.<br />

6- The payment of the Ex-gratia will also be made to his labour by the Contractor, if it is found<br />

payable as per labour Act/Rules.<br />

7- The Skilled and un-skilled labour being engaged by the Contractor shall, in no case, be entitled<br />

for regular service of the Corporation.<br />

8- All T&P required for proper completion of assigned work, shall be arranged and provided to<br />

his labour by the Contractor him self at his own cost. However, all the required stock materials/<br />

component for proper completion of work shall arranged & provided by the Department free of<br />

cost.<br />

9- The Contractor shall be fully responsible for arranging accidental insurance policy for the<br />

compensation of his working personnel, if required as the Corporation shall not be held<br />

responsible for any compensation to his Labour in the event of any accident/mishap<br />

whatsoever.<br />

<strong>10</strong>- The Contractor will be required to pay minimum wages (in shape of A/C payee Cheque) to the<br />

employees engaged by him for the said purpose according to the rates approved by the Labour<br />

Commissioner and also amendment, if any, from time to time and subsequent approval by the<br />

Chief Engineer, M.V.V.N.L Lucknow/works Committee.<br />

11- The Contractor will issue Character Certificate in respect of each Employees provided by him<br />

and he will be responsible for any mischief committed by any of his labour.<br />

12- The Contractor shall have to follow instructions of the Engineer in charge of the Sub-Station or<br />

his representative in respect of proper operation & maintenance of Sub-Station.<br />

13- The log sheet & other requisite registers & stationery as well as stock materials/spares<br />

required for attending break downs/maintenance shall be supplied by the department and the<br />

account of their consumption shall be given by the contractor to Engineer supervising the<br />

work.<br />

14- 90 % payment will be made by concerned Executive Engineer against running bill subject to<br />

the availability of funds and <strong>10</strong>% amount will be detained as security which will be paid after<br />

the completion of works in satisfactory condition and after recommendation of concerned Subdivisional<br />

officer.<br />

15- <strong>No</strong> Experience Certificate will be issued by any Officer of the Corporation to any Employee of<br />

the Contractor.<br />

Cont.


(2)<br />

16- In addition to above all the general terms & conditions of contract for execution of works will<br />

governed as per Form-A.<br />

17- Income tax/other deductions as UPPCL/<strong>MVVNL</strong> rules shall be deducted from the Contractor<br />

bills as per State/Central Government rates prevailing in the Department.<br />

18- The Contractor shall confirm in respect to the requirement of Chief Electrical Inspector to U.P.<br />

Government as and when required by them in respect to Electrical Safety Rules and<br />

Regulation.<br />

19- <strong>No</strong> Compensation for idle labour shall be payable to the Contractor in any circumstances. The<br />

compensation owning to accident/ incident during execution of work shall be paid by the<br />

Contractor at his own without any reference to UPPCL/<strong>MVVNL</strong> and constitutional obligation<br />

for such compensation shall be sole responsibility of the contractor.<br />

20- The damage, if any, caused loss to the department/work/ T&P by the Contractor him self or his<br />

staff shall be recovered in full from the pending bill(s)/ liability of the Contractor.<br />

21- The Superintending Engineer, Electricity Distribution Circle, Unnao will be the principal<br />

employer of the contract and the Concerned Executive Engineer shall function as Engineer-incharge<br />

of the contract. The work shall be carried out as per rules by the Contractor in strict<br />

supervision and to the entire satisfaction of Engineer-in-charge of the Division.<br />

22- All the terms & Conditions of the Labour act will be adhered to strictly by the contractor.<br />

23- The dispute arising, if any, taken into Court, shall be within the Jurisdiction of Unnao.<br />

24- The contract shall have to issue identity card to his employees engaged for the said purpose.<br />

Executive Engineer<br />

Electricity Distribution Division-I<br />

Unnao


Madhyanchal<br />

Vidyut Vitaran<br />

Nigam Limited<br />

Electricity Distribution<br />

Division-I, Unnao.<br />

<strong>Tender</strong> <strong>No</strong>. 30/EDD-IU/2013-14<br />

DATE OF OPENING:-26-08-2013


<strong>Tender</strong> proforma<br />

(to be filled by tenderer)<br />

Important instruction of the tenderer<br />

Your tender shall not be considered if you fail to submit this proforma duly filled up replies should be<br />

completed without ambiguity and should be clearly written against each item.<br />

(Attach extra sheets if the space-left not sufficient)<br />

Sl.<br />

<strong>No</strong><br />

PARTICULARS<br />

1- Specification <strong>No</strong>. against which your are tenderer<br />

2- Receipt <strong>No</strong>. & Date vide which cost of tender specification<br />

fees deposited by you.<br />

3- Name & Address of tenderer<br />

REPLIES<br />

4- Year since when the tenderer has started execution of work<br />

tender.<br />

5- Do you agree to all the conditions of the tender specification<br />

and if not State the modifications clearly which you desire in<br />

general conditions from A/B. it may Please be noted that it<br />

shall be entirely at the desecration of the undersigned to accept<br />

or reject the modification proposed)<br />

6- Account of earn money deposited with full details be<br />

submitted here<br />

7- Please state clearly (Yes/<strong>No</strong>) if you would accept the order of<br />

modification in the form A/B are not acceptable to the<br />

corporation without imposing further conditions form your<br />

side.<br />

8- Give two reference who can certify your financial status and<br />

capability to undertake execution of work/Supply. One of the<br />

reference should be of any scheduled Bank of India.<br />

9- Name & Detailed address of <strong>Tender</strong>er/ Proprietor/<br />

Partners/Director be given.<br />

<strong>10</strong> Statement of past/current experience in similar works in the<br />

following form:-<br />

Sl<br />

no<br />

Name & address of<br />

ordering authority<br />

Order/<br />

Contract<br />

<strong>No</strong>. & Date<br />

Particular of<br />

work<br />

executed<br />

Quantum of work<br />

Ordered Completed Remarks<br />

1 2 3 4 5 6 7<br />

11- What is the validity period of your tender.<br />

12- Place & Date<br />

Signature of <strong>Tender</strong>er<br />

With seal


MADHYANC<strong>HAL</strong> VIDYUT VITARAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

Date of opening:-26-08-2013<br />

<strong>Tender</strong> Specification <strong>No</strong>. 30/EDD-IU/2013-14<br />

SCHEDULE OF RATES & QUANTUM OF WORK FOR PROVIDING MAN POWER (GANG)<br />

AT 33/11 KV SUB STATION BIGHAPUR, UNNAO .<br />

Sl.<br />

<strong>No</strong>.<br />

Particulars of Work Unit Qty<br />

Rate (Per<br />

Day/ Per<br />

Labour)<br />

Amount (Per<br />

Day)<br />

Providing man power (gang) for<br />

attending break downs of H.T/L.T.<br />

Lines due to broken conductor, blown<br />

fuses, puncture insulators etc. attending<br />

consumers complaints and<br />

disconnection of defaulting consumers<br />

every day for 8 hours including Sunday<br />

and holyday as per detail given below.<br />

1- Skilled labour having I.T.I. Cirtificate in<br />

Electrician/Wireman trade.<br />

2- Unskilled labour having experience for<br />

maintenance of H.T. & L.T. Lines.<br />

Total<br />

For 6 MONTH<br />

<strong>No</strong>s. 4<br />

<strong>No</strong>s. 8<br />

Signature & seal of<br />

Contractor<br />

Executive Engineer<br />

EDD-I Unnao


MADHYANC<strong>HAL</strong> VIDYUT VITRAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

<strong>Tender</strong> <strong>No</strong>. 30 /EDD-IU/2013-14<br />

SPECIAL TERMS & CONDITIONS<br />

1- The works will be carried out by the Contractor during the Agreement period of Six month<br />

from the date of commencement, under Electricity Distribution Division-I, Unnao.<br />

2- The skilled labour to be provided by the Contractor shall have the educational qualification of<br />

intermediate with I.T.I certificate in Electrician trade.<br />

3- The Contractor shall have Registration with Labour Commissioner for Engaging Labour which<br />

should be valid at least for agreement period. The photo copy of registration certificate shall be<br />

produced by the Contractor before taking up the work in hand.<br />

4- The Contractor shall also be registered with E.P.F. Commissioner and he will have to deposit<br />

the amount of E.P.F. deducted by him from the monthly wages of his labour in the office of<br />

E.P.F. Commissioner every month and photocopy of the same will be produce to Executive<br />

Engineer, Electricity Distribution Division-I, Unnao accordingly.<br />

5- Apart from above, the Contactor shall also be required to get registered with concerning<br />

authorities of Central Excise duty and Service Tax in respect of his aforesaid labour.<br />

6- The payment of the Ex-gratia will also be made to his labour by the Contractor, if it is found<br />

payable as per labour Act/Rules.<br />

7- The Skilled and un-skilled labour being engaged by the Contractor shall, in no case, be entitled<br />

for regular service of the Corporation.<br />

8- All T&P required for proper completion of assigned work, shall be arranged and provided to<br />

his labour by the Contractor him self at his own cost. However, all the required stock materials/<br />

component for proper completion of work shall arranged & provided by the Department free of<br />

cost.<br />

9- The Contractor shall be fully responsible for arranging accidental insurance policy for the<br />

compensation of his working personnel, if required as the Corporation shall not be held<br />

responsible for any compensation to his Labour in the event of any accident/mishap<br />

whatsoever.<br />

<strong>10</strong>- The Contractor will be required to pay minimum wages (in shape of A/C payee Cheque) to the<br />

employees engaged by him for the said purpose according to the rates approved by the Labour<br />

Commissioner and also amendment, if any, from time to time and subsequent approval by the<br />

Chief Engineer, M.V.V.N.L Lucknow/works Committee.<br />

11- The Contractor will issue Character Certificate in respect of each Employees provided by him<br />

and he will be responsible for any mischief committed by any of his labour.<br />

12- The Contractor shall have to follow instructions of the Engineer in charge of the Sub-Station or<br />

his representative in respect of proper operation & maintenance of Sub-Station.<br />

13- The log sheet & other requisite registers & stationery as well as stock materials/spares<br />

required for attending break downs/maintenance shall be supplied by the department and the<br />

account of their consumption shall be given by the contractor to Engineer supervising the<br />

work.<br />

14- 90 % payment will be made by concerned Executive Engineer against running bill subject to<br />

the availability of funds and <strong>10</strong>% amount will be detained as security which will be paid after<br />

the completion of works in satisfactory condition and after recommendation of concerned Subdivisional<br />

officer.<br />

15- <strong>No</strong> Experience Certificate will be issued by any Officer of the Corporation to any Employee of<br />

the Contractor.<br />

Cont.


(2)<br />

16- In addition to above all the general terms & conditions of contract for execution of works will<br />

governed as per Form-A.<br />

17- Income tax/other deductions as UPPCL/<strong>MVVNL</strong> rules shall be deducted from the Contractor<br />

bills as per State/Central Government rates prevailing in the Department.<br />

18- The Contractor shall confirm in respect to the requirement of Chief Electrical Inspector to U.P.<br />

Government as and when required by them in respect to Electrical Safety Rules and<br />

Regulation.<br />

19- <strong>No</strong> Compensation for idle labour shall be payable to the Contractor in any circumstances. The<br />

compensation owning to accident/ incident during execution of work shall be paid by the<br />

Contractor at his own without any reference to UPPCL/<strong>MVVNL</strong> and constitutional obligation<br />

for such compensation shall be sole responsibility of the contractor.<br />

20- The damage, if any, caused loss to the department/work/ T&P by the Contractor him self or his<br />

staff shall be recovered in full from the pending bill(s)/ liability of the Contractor.<br />

21- The Superintending Engineer, Electricity Distribution Circle, Unnao will be the principal<br />

employer of the contract and the Concerned Executive Engineer shall function as Engineer-incharge<br />

of the contract. The work shall be carried out as per rules by the Contractor in strict<br />

supervision and to the entire satisfaction of Engineer-in-charge of the Division.<br />

22- All the terms & Conditions of the Labour act will be adhered to strictly by the contractor.<br />

23- The dispute arising, if any, taken into Court, shall be within the Jurisdiction of Unnao.<br />

24- The contract shall have to issue identity card to his employees engaged for the said purpose.<br />

Executive Engineer<br />

Electricity Distribution Division-I<br />

Unnao


Madhyanchal<br />

Vidyut Vitaran<br />

Nigam Limited<br />

Electricity Distribution<br />

Division-I, Unnao.<br />

<strong>Tender</strong> <strong>No</strong>. 31/EDD-IU/2013-14<br />

DATE OF OPENING:-26-08-2013


<strong>Tender</strong> proforma<br />

(to be filled by tenderer)<br />

Important instruction of the tenderer<br />

Your tender shall not be considered if you fail to submit this proforma duly filled up replies should be<br />

completed without ambiguity and should be clearly written against each item.<br />

(Attach extra sheets if the space-left not sufficient)<br />

Sl.<br />

<strong>No</strong><br />

PARTICULARS<br />

1- Specification <strong>No</strong>. against which your are tenderer<br />

2- Receipt <strong>No</strong>. & Date vide which cost of tender specification<br />

fees deposited by you.<br />

3- Name & Address of tenderer<br />

REPLIES<br />

4- Year since when the tenderer has started execution of work<br />

tender.<br />

5- Do you agree to all the conditions of the tender specification<br />

and if not State the modifications clearly which you desire in<br />

general conditions from A/B. it may Please be noted that it<br />

shall be entirely at the desecration of the undersigned to accept<br />

or reject the modification proposed)<br />

6- Account of earn money deposited with full details be<br />

submitted here<br />

7- Please state clearly (Yes/<strong>No</strong>) if you would accept the order of<br />

modification in the form A/B are not acceptable to the<br />

corporation without imposing further conditions form your<br />

side.<br />

8- Give two reference who can certify your financial status and<br />

capability to undertake execution of work/Supply. One of the<br />

reference should be of any scheduled Bank of India.<br />

9- Name & Detailed address of <strong>Tender</strong>er/ Proprietor/<br />

Partners/Director be given.<br />

<strong>10</strong> Statement of past/current experience in similar works in the<br />

following form:-<br />

Sl<br />

no<br />

Name & address of<br />

ordering authority<br />

Order/<br />

Contract<br />

<strong>No</strong>. & Date<br />

Particular of<br />

work<br />

executed<br />

Quantum of work<br />

Ordered Completed Remarks<br />

1 2 3 4 5 6 7<br />

11- What is the validity period of your tender.<br />

12- Place & Date<br />

Signature of <strong>Tender</strong>er<br />

With seal


MADHYNC<strong>HAL</strong> VIDYUT VITARAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I UNNAO<br />

TENDER SPECIFICATION NO. 31/ EDDIU/2013-14<br />

Date Of Opening: 26-08-2013<br />

Shedule of rates & works for dismantling of damaged transformer from D/P / Plinth, safe carriage<br />

including loading , unloading and proper placing of the same Under the area of 33/11 KV S/S Bighapur<br />

Unnao of Electricity Distribution Sub-Division-IIIrd, Unnao. to workshop/ store center at Unnao.<br />

Thereafter mounting of new/ repaired. T/Fs on D/P/ Plinth including loading, Unloading and safe<br />

carriage of the same from store center Unnao to work site distance above 30 Km.<br />

Sl. <strong>No</strong>.<br />

Transformer<br />

Capacity<br />

1 250 KVA<br />

Quantity in <strong>No</strong>.<br />

Damaged 4<br />

New/ Repaired 4<br />

Rate Per<br />

Transfarmer<br />

Amount<br />

2 <strong>10</strong>0 KVA<br />

Damaged 5<br />

New/ Repaired 5<br />

3<br />

63 KVA Damaged 20<br />

New/ Repaired 20<br />

4 25 KVA<br />

5 16 KVA<br />

5 <strong>10</strong> KVA<br />

Damaged 65<br />

New/ Repaired 65<br />

Damaged 5<br />

New/ Repaired 5<br />

Damaged 20<br />

New/ Repaired 20<br />

Total<br />

Signature & seal of<br />

Contractor<br />

ExecutiveEngineer<br />

EDD-I Unnao


MADHYANC<strong>HAL</strong> VIDYUT VITRAN NIGAM LIMITED<br />

ELECTRICITY DISTRIBUTION DIVISION-I, UNNAO<br />

<strong>Tender</strong> <strong>No</strong>. 31/ EDD-IU/2013-14<br />

SPECIAL TERMS & CONDITIONS<br />

1. The work shall be completed within one year( <strong>No</strong>. of T/F as per work schedule are<br />

agreemented value) from the date agreement/date of handing over material by the deptt.<br />

2. Variation shall be admissible only with the approval of the committee.<br />

3. The work shall be carried out in accordance with Indian Electricity Act and Rules & as per<br />

Construction Manual of U.P. Power Corporation Ltd. And RESSPO Schedule.<br />

4. All the material of standard quality associated with the work shall be provided by the<br />

Contractor as per tender specification.<br />

5. Any loss & damage shall be recovered from the contractor account.<br />

6. <strong>No</strong> T & P shall be supplied by the department at any cost. The transportation arrangement for<br />

safe carriage of materials shall be made by the Contractor. at his own risk.<br />

7. All general conditions of contract for execution of work will be governed as per from ‘A’<br />

(General conditions for the supply of plant and the execution of work in the U.P. Power<br />

Corporation Ltd.)<br />

8. The work shall be carried out under the direct supervision of Junior Engineer and Sub-<br />

Divisional Officer concerned.<br />

9. Department will not be responsible for any accident, casualties and loss occurred at the time of<br />

execution of work. The contractor shall be fully responsible for the same.<br />

<strong>10</strong>. The necessary permit for shutdown etc. will be given to the contractor by the representative of<br />

the department as and when required for completion of work in a planned way.<br />

11. The 90% payment shall be made on receipt bill against the works completed subject to<br />

availability of fund and remaining <strong>10</strong>% will be detained as security which will be paid after 6<br />

month from the date of completion of full work.<br />

12. The Income Tax and other taxes will be deducted from the bill, if and as applicable.<br />

13. Penalty @ ½% per week subject to maximum of <strong>10</strong>% of the total value of the contract will be<br />

levied and deducted if the work is not completed within the stipulated period.<br />

Executive Engineer<br />