10.11.2014 Views

MDCIS-BCC-Electrical Permit Application - City of Saginaw MI

MDCIS-BCC-Electrical Permit Application - City of Saginaw MI

MDCIS-BCC-Electrical Permit Application - City of Saginaw MI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FEE # ITEMS TOTAL FEE # ITEMS TOTAL<br />

1. <strong>Application</strong> Fee $75.00<br />

13. Feeders or bus duct (per 50')<br />

. 2. License Registration Fee $10.00 0-60 amps $7.00<br />

3. Services<br />

61-100 amps $10.00<br />

0 - 200 Amps $12.00 over 100 amps $13.00<br />

201 - 600 Amps $20.00 14. Any kW or kVA or motor $5.00<br />

601 - 800 Amps $24.00 0-20 kW,kVA, or HP $7.00<br />

801 - 1200 Amps $25.00 21-50 kW,kVA, or HP $10.00<br />

Over 1,200 Amps $50.00 Over 50 kW,kVA, or HP $13.00<br />

4. Circuits (per each Circuit) $5.00 15. Alarm Systems<br />

5. Lighting Fixtures (per 25) $6.00 1-10 Devices $50.00<br />

6. Heating Equip (Excudes Circuit Fee) $7.00 11-20 Devices $100.00<br />

7. Dishwasher, Disposal, Range Hood $5.00 Each Added Device $5.00<br />

8. Energy Retr<strong>of</strong>it - temperature Control $45.00<br />

16. Refundable Re-Inspection Fee 1 $60.00<br />

9. Conduit only or grounding only<br />

10. Signs per unit<br />

11. Signs per letter<br />

$45.00<br />

$10.00<br />

$15.00<br />

17. Special Inspection Fee $30.00<br />

12. Signs neon per 25'<br />

$20.00<br />

TOTAL FE ES<br />

Make checks payable to " CITY OF SAGINAW "<br />

IX. INSTRUCTIONS FOR COMPLETING APPLICATION<br />

GENERAL: <strong>Electrical</strong> work shall not be started until the application for permit has been filed with the Inspections Division. All installations shall be in<br />

conformance with the State <strong>Electrical</strong> Code. No work shall be concealed until it has been inspected. When ready for an inspection call the<br />

inspector providing as much advance notice as possible. The inspector will need the job location and permit number.<br />

EXPIRATION OF PER<strong>MI</strong>T: A permit remains valid as long as work is progressing and inspections are requested and conducted. A permit shall become<br />

invalid if the authorized work is not commenced within six months after issuance <strong>of</strong> the permit or if the authorized work is suspended or abandoned for a<br />

period <strong>of</strong> six months after the time <strong>of</strong> commencing the work. A PER<strong>MI</strong>T WILL BE CANCELLED WHEN NO INSPECTIONS ARE REQUESTED AND<br />

CONDUCTED WITHIN SIX MONTHS OF THE DATE OF ISSUANCE OR THE DATE OF A PREVIOUS INSPECTION. CANCELLED PER<strong>MI</strong>TS CANNOT<br />

BE REFUNDED OR REINSTATED.<br />

WHERE TO SUB<strong>MI</strong>T APPLICATION: <strong>City</strong> <strong>of</strong> <strong>Saginaw</strong>, Inspections Division, 1315 S. Washington Ave. <strong>Saginaw</strong>, <strong>MI</strong> 48601<br />

The <strong>City</strong> <strong>of</strong> <strong>Saginaw</strong> Inspections Division is responsible for code enforcement in the <strong>City</strong> limits <strong>of</strong> <strong>Saginaw</strong>.<br />

Questions concerning the electrical code may be directed to the <strong>Electrical</strong> Inspector Barri Woods at (989) 759-1425.<br />

The <strong>City</strong> <strong>of</strong> <strong>Saginaw</strong> will not discriminate against any individual or group because <strong>of</strong> race, sex, religion, age, national origin, color, marital status, handicap or political beliefs.<br />

COS 6/13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!