BARGE TERMINAL TILBURG - BENEFITS Daily Barge connection: Rotterdam - Tilburg (v.v) Daily Train connection: Rotterdam - Tilburg (v.v) • Rotterdam - Eindhoven (v.v) Support of own trucks POWERED BY GVT - GROUP OF LOGISTICS • VEKA LOGISTICS • SPaP 22
BARGE TERMINAL TILBURG - FACTS 20 trips a week (Rotterdam-Tilburg, v.v.) 5 dedicated barges Sufficient train capacity 9.300.000 km p/yr Road reduction Sufficient barge capacity Open 6 days from 6 am - 10 pm POWERED BY GVT - GROUP OF LOGISTICS • VEKA LOGISTICS • SPaP 23
- Page 1 and 2: LOGISTIC EVENT PARTICIPANTS CENTRAL
- Page 3 and 4: THE SMART CONNECTION ACROSS EUROPE
- Page 5 and 6: PARTNERS Logistics All logistic ser
- Page 7 and 8: PORT THE GOODFLOW OF ROTTERDAM PORT
- Page 9 and 10: FLOW OF GOODS EUROPE 2 DAYS LONGER
- Page 11 and 12: CONNECTIONS IN ROTTERDAM •Deep se
- Page 13 and 14: USING RAILPORT BRABANT IN TILBURG A
- Page 15 and 16: SHORT TRANSIT TIMES TO ALL SURROUND
- Page 17 and 18: THE SMART CONNECTION FACTS - FIGURE
- Page 19 and 20: TERMINALS IN TILBURG POWERED BY GVT
- Page 21: RAILPORT BRABANT - FACTS Storage &
- Page 25 and 26: AREA TERMINAL BRATISLAVA - SPaP SLO
- Page 27 and 28: TERMINAL BRATISLAVA - FACTS Storage
- Page 29 and 30: SCHEDULING TRAINS Train 1 Bratislav
- Page 31 and 32: YOUR ADVANTAGES Direct connection W
- Page 33: DANUBE GATE BV | WWW.DANUBEGATE.COM
BARGE TERMINAL TILBURG - FACTS<br />
20 trips a week<br />
(<strong>Rotterdam</strong>-Tilburg, v.v.)<br />
5 dedicated barges<br />
Sufficient<br />
train capacity<br />
9.300.000 km p/yr<br />
Road reduction<br />
Sufficient<br />
barge capacity<br />
Open 6 days from<br />
6 am - 10 pm<br />