aqua signal Teterow GmbH & Co. KG Werk Bremen D ... - GET Ltd
aqua signal Teterow GmbH & Co. KG Werk Bremen D ... - GET Ltd aqua signal Teterow GmbH & Co. KG Werk Bremen D ... - GET Ltd
24 Dimensions and Installation Size of Arctic 65 de en fr Page 32 of 35 9420102300_en.doc Rev.: 04
25 Installation of Arctic 65: see section 10 25.1 Electrical Installation de Please see also 10.7 en Important information: fr The upper part of the main lighting and the lower part of the reserve lighting must always be used for navigation lights with a main and reserve system. Reserve 115V AC Main 115V AC The connection terminals inside the junction box must be connected to the stripped wire ends of the cable. Close the junction box carefully. Ensure that the seal is in a perfect condition. Reserve 230V AC Main 230V AC Page 33 of 35 9420102300_en.doc Rev.: 04
- Page 1 and 2: Navigations- und Signalleuchten mit
- Page 3 and 4: Contents 1 FOREWORD ...............
- Page 5 and 6: 1 Foreword The LED navigation and s
- Page 7 and 8: The navigation and signal lights 1
- Page 9 and 10: 6 Safety and Accident Prevention Re
- Page 11 and 12: For vessels sailing the German flag
- Page 13 and 14: 10 Installation 10.1 General mounti
- Page 15 and 16: a [cm] x [cm] 90 3 120 4 150 5 180
- Page 17 and 18: sories (see section 0). When select
- Page 19 and 20: 10.8 Closing the Junction Box de en
- Page 21 and 22: Equipotential bonding 8366006800 fo
- Page 23 and 24: When using these navigation lights,
- Page 25 and 26: 19 Declaration of Conformity de en
- Page 27 and 28: de en fr Page 27 of 35 9420102300_e
- Page 29 and 30: 22 Technical Data Voltage supply, m
- Page 31: 23 Operating Life of the LED Arctic
- Page 35: 26 Approvals Arctic 65 The LED ligh
25 Installation of Arctic 65: see section 10<br />
25.1 Electrical Installation<br />
de<br />
Please see also 10.7<br />
en<br />
Important information:<br />
fr<br />
The upper part of the main lighting and the lower part of the reserve<br />
lighting must always be used for navigation lights with a<br />
main and reserve system.<br />
Reserve<br />
115V AC<br />
Main<br />
115V AC<br />
The connection terminals inside the junction box must be connected<br />
to the stripped wire ends of the cable.<br />
Close the junction box carefully. Ensure that the seal is in<br />
a perfect condition.<br />
Reserve<br />
230V AC<br />
Main<br />
230V AC<br />
Page 33 of 35 9420102300_en.doc Rev.: 04