aqua signal Teterow GmbH & Co. KG Werk Bremen D ... - GET Ltd
aqua signal Teterow GmbH & Co. KG Werk Bremen D ... - GET Ltd aqua signal Teterow GmbH & Co. KG Werk Bremen D ... - GET Ltd
Check the function of the navigation lights! No functioning of the LED if connection is incorrect! Close the junction box carefully. Ensure that the seal is in de Spare Main a perfect condition. en fr 24V DC 24V DC An equipotential bonding must be ensured when installing the brass luminaires. When installing the connecting cable, it must be ensured that the deepest point is not directly at the cable entry. Page 18 of 35 9420102300_en.doc Rev.: 04
10.8 Closing the Junction Box de en fr Close the junction box with the cover. Ensure that the seal is in the correct position. When doing so, note the maximum tightening torque for this of Tmax = 0.6 Nm. If the maximum tightening torque of the bolts is exceeded when closing the junction box, there is a risk that the bolt will be overtightened with the result that the socket will no longer be completely tight. In this case, the bolt can be replaced by a threaded joint with metrical thread. For this purpose, a conventional hexagon nut M6 can be pressed into the plastic housing on the rear. 10.9 Material Information The housing components of the navigation lights are made from UV-resistant plastic, sea-water-resistant aluminium or brass. When choosing the fastening (bolts), we recommend the use of high-quality, stainless steel. Consider the resistance to sea water! We recommend the use of self-locking nuts to secure the bolts. Page 19 of 35 9420102300_en.doc Rev.: 04
- Page 1 and 2: Navigations- und Signalleuchten mit
- Page 3 and 4: Contents 1 FOREWORD ...............
- Page 5 and 6: 1 Foreword The LED navigation and s
- Page 7 and 8: The navigation and signal lights 1
- Page 9 and 10: 6 Safety and Accident Prevention Re
- Page 11 and 12: For vessels sailing the German flag
- Page 13 and 14: 10 Installation 10.1 General mounti
- Page 15 and 16: a [cm] x [cm] 90 3 120 4 150 5 180
- Page 17: sories (see section 0). When select
- Page 21 and 22: Equipotential bonding 8366006800 fo
- Page 23 and 24: When using these navigation lights,
- Page 25 and 26: 19 Declaration of Conformity de en
- Page 27 and 28: de en fr Page 27 of 35 9420102300_e
- Page 29 and 30: 22 Technical Data Voltage supply, m
- Page 31 and 32: 23 Operating Life of the LED Arctic
- Page 33 and 34: 25 Installation of Arctic 65: see s
- Page 35: 26 Approvals Arctic 65 The LED ligh
Check the function of the navigation lights!<br />
No functioning of the LED if connection is incorrect!<br />
Close the junction box carefully. Ensure that the seal is in<br />
de<br />
Spare<br />
Main<br />
a perfect condition.<br />
en<br />
fr<br />
24V DC<br />
24V DC<br />
An equipotential bonding must be ensured when installing the<br />
brass luminaires.<br />
When installing the connecting cable, it must be ensured that the deepest point is not<br />
directly at the cable entry.<br />
Page 18 of 35 9420102300_en.doc Rev.: 04