Cooper B-Line Seismic Restraints - Dixie Construction Products
Cooper B-Line Seismic Restraints - Dixie Construction Products Cooper B-Line Seismic Restraints - Dixie Construction Products
TRAPEZE BRACING Seismic Bracing Charts for Trapeze Supports - Figures 9 & 10 Table 1 for Seismic Force Level 1.0g (ASD) Hanger Rod Size Transverse Bracing 1 Longitudinal Bracing 1 Unbraced Trapeze Braced Trapeze Total Support Brace Structure Brace Structure Weight Span Interval 3,4 Connection Interval 3,4 Connection Rod Minimum Rod Minimum W t L t * Type 2 Type 2 Load 5 Rod Size 6 Load 5 Rod Size 6 lbs./ft. ft. ft. ft. lbs. in. lbs. in. 0 - 10 6 24 I 24 I 40 3 /8 160 3 /8 0 - 10 6 36 II 42 II 40 3 /8 250 3 /8 0 - 10 6 --- --- 60 III 40 3 /8 340 1 /2 0 - 10 6 --- --- 78 IV 40 3 /8 430 1 /2 0 - 10 8 24 I 24 I 54 3 /8 173 3 /8 0 - 10 8 40 II 40 II 54 3/8 253 3/8 0 - 10 8 --- --- 56 III 54 3 /8 333 3 /8 0 - 10 8 --- --- 80 IV 54 3/8 453 1/2 0 - 10 10 20 I 20 I 67 3/8 167 3/8 0 - 10 10 40 II 40 II 67 3 /8 267 3 /8 0 - 10 10 --- --- 60 III 67 3/8 367 3/8 0 - 10 10 --- --- 80 IV 67 3 /8 467 1 /2 0 - 10 12 24 I 24 I 80 3 /8 200 3 /8 0 - 10 12 36 II 36 II 80 3/8 260 3/8 0 - 10 12 --- --- 60 III 80 3 /8 380 3 /8 0 - 10 12 --- --- 72 IV 80 3/8 440 1/2 0 - 10 16 16 I 16 I 107 3 /8 187 3 /8 0 - 10 16 32 II 32 II 107 3 /8 267 3 /8 0 - 10 16 --- --- 48 III 107 3 /8 347 3 /8 0 - 10 16 --- --- 80 IV 107 3 /8 507 1 /2 0 - 10 20 20 I 20 I 134 3/8 233 3/8 0 - 10 20 40 II 40 II 134 3 /8 333 3 /8 0 - 10 20 --- --- 60 III 134 3/8 433 3/8 0 - 10 20 --- --- 80 IV 134 3 /8 533 1 /2 0 - 10 24 24 I 24 I 160 3 /8 280 3 /8 0 - 10 24 --- --- 48 III 160 3/8 400 3/8 0 - 10 24 --- --- 72 IV 160 3 /8 520 3 /8 * See note 2 on page 17. See page 145 for footnotes. COOPER B-Line 509 West Monroe Street Highland, Illinois 62249 Phone: 800-851-7415 Fax: 618-654-1917 Date: Page No. Sheet Number: 6 - 2 - 06 139 of Raafat S. Aboulhosn Structural Engineer S 3913
TRAPEZE BRACING Seismic Bracing Charts for Trapeze Supports - Figures 9 & 10 Table 1 cont. for Seismic Force Level 1.0g (ASD) Hanger Rod Size Transverse Bracing 1 Longitudinal Bracing 1 Unbraced Trapeze Braced Trapeze Total Support Brace Structure Brace Structure Weight Span Interval 3,4 Connection Interval 3,4 Rod Minimum Rod Minimum Connection W t L t * Type 2 Type 2 Load 5 Rod Size 6 Load 5 Rod Size 6 lbs./ft. ft. ft. ft. lbs. in. lbs. in. 11 - 25 6 6 I 6 I 100 3 /8 175 3 /8 11 - 25 6 12 II 12 II 100 3 /8 250 3 /8 11 - 25 6 24 III 24 III 100 3 /8 400 3 /8 11 - 25 6 36 IV 36 IV 100 3 /8 550 1 /2 11 - 25 6 --- --- 54 V 100 3 /8 775 5 /8 11 - 25 8 8 I 8 I 137 3 /8 233 3 /8 11 - 25 8 16 II 16 II 137 3/8 333 3/8 11 - 25 8 24 III 24 III 137 3 /8 433 3 /8 11 - 25 8 32 IV 32 IV 137 3/8 533 1/2 11 - 25 8 40 V 48 V 137 3 /8 733 1 /2 11 - 25 10 10 II 10 II 167 3 /8 292 3 /8 11 - 25 10 20 III 20 III 167 3/8 417 3/8 11 - 25 10 30 IV 30 IV 167 3 /8 542 3 /8 11 - 25 10 40 V 50 V 167 3/8 792 1/2 11 - 25 12 12 II 12 II 200 3/8 350 3/8 11 - 25 12 24 III 24 III 200 3 /8 500 3 /8 11 - 25 12 36 IV 36 IV 200 3/8 650 1/2 11 - 25 12 --- --- 48 V 200 3 /8 800 1 /2 11 - 25 16 16 II 16 II 267 3 /8 467 3 /8 11 - 25 16 36 IV 32 IV 267 3 /8 667 1 /2 11 - 25 16 --- --- 48 V 267 3 /8 867 1 /2 11 - 25 20 20 III 20 III 334 3/8 583 3/8 11 - 25 20 40 V 40 V 334 3 /8 833 1 /2 11 - 25 24 24 III 24 III 400 3 /8 700 1 /2 11 - 25 24 --- --- 48 V 400 3/8 1000 1/2 * See note 2 on page 17. See page 145 for footnotes. COOPER B-Line 509 West Monroe Street Highland, Illinois 62249 Phone: 800-851-7415 Fax: 618-654-1917 Date: Page No. Sheet Number: Raafat S. Aboulhosn Structural Engineer S 3913 6 - 2 - 06 140 of
- Page 91 and 92: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 93 and 94: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 95 and 96: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 97 and 98: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 99 and 100: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 101 and 102: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 103 and 104: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 105 and 106: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 107 and 108: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 109 and 110: SUPPORT SPACING FOR SINGLE ROD HANG
- Page 111 and 112: Appendix 2 Seismic Bracing Charts f
- Page 113 and 114: TRAPEZE BRACING Seismic Bracing Cha
- Page 115 and 116: TRAPEZE BRACING Seismic Bracing Cha
- Page 117 and 118: Seismic Bracing Charts for Trapeze
- Page 119 and 120: TRAPEZE BRACING Seismic Bracing Cha
- Page 121 and 122: TRAPEZE BRACING Seismic Bracing Cha
- Page 123 and 124: Seismic Bracing Charts for Trapeze
- Page 125 and 126: TRAPEZE BRACING Seismic Bracing Cha
- Page 127 and 128: TRAPEZE BRACING Seismic Bracing Cha
- Page 129 and 130: Seismic Bracing Charts for Trapeze
- Page 131 and 132: TRAPEZE BRACING Seismic Bracing Cha
- Page 133 and 134: TRAPEZE BRACING Seismic Bracing Cha
- Page 135 and 136: Seismic Bracing Charts for Trapeze
- Page 137 and 138: TRAPEZE BRACING Seismic Bracing Cha
- Page 139 and 140: TRAPEZE BRACING Seismic Bracing Cha
- Page 141: Seismic Bracing Charts for Trapeze
- Page 145 and 146: TRAPEZE BRACING Seismic Bracing Cha
- Page 147 and 148: TRAPEZE BRACING Seismic Bracing Cha
- Page 149 and 150: Appendix 3 Proof Test Instructions
- Page 151 and 152: Example: Deeply Embedded Anchors In
- Page 153 and 154: Check if value falls within the all
- Page 155 and 156: 1997 Uniform Building Code As defin
- Page 157 and 158: Example Two, Shallow Embedded Ancho
- Page 159 and 160: Appendix 5 This page has been reser
TRAPEZE BRACING<br />
<strong>Seismic</strong> Bracing Charts for Trapeze Supports - Figures 9 & 10<br />
Table 1 for <strong>Seismic</strong> Force Level 1.0g (ASD)<br />
Hanger Rod Size<br />
Transverse Bracing 1 Longitudinal Bracing 1 Unbraced Trapeze Braced Trapeze<br />
Total Support Brace Structure Brace Structure<br />
Weight Span Interval 3,4 Connection Interval 3,4 Connection<br />
Rod Minimum Rod Minimum<br />
W t L t * Type 2 Type 2 Load 5 Rod Size 6 Load 5 Rod Size 6<br />
lbs./ft. ft. ft. ft. lbs. in. lbs. in.<br />
0 - 10 6 24 I 24 I 40 3 /8 160 3 /8<br />
0 - 10 6 36 II 42 II 40 3 /8 250 3 /8<br />
0 - 10 6 --- --- 60 III 40 3 /8 340 1 /2<br />
0 - 10 6 --- --- 78 IV 40 3 /8 430 1 /2<br />
0 - 10 8 24 I 24 I 54 3 /8 173 3 /8<br />
0 - 10 8 40 II 40 II 54 3/8 253 3/8<br />
0 - 10 8 --- --- 56 III 54 3 /8 333 3 /8<br />
0 - 10 8 --- --- 80 IV 54 3/8 453 1/2<br />
0 - 10 10 20 I 20 I 67 3/8 167 3/8<br />
0 - 10 10 40 II 40 II 67 3 /8 267 3 /8<br />
0 - 10 10 --- --- 60 III 67 3/8 367 3/8<br />
0 - 10 10 --- --- 80 IV 67 3 /8 467 1 /2<br />
0 - 10 12 24 I 24 I 80 3 /8 200 3 /8<br />
0 - 10 12 36 II 36 II 80 3/8 260 3/8<br />
0 - 10 12 --- --- 60 III 80 3 /8 380 3 /8<br />
0 - 10 12 --- --- 72 IV 80 3/8 440 1/2<br />
0 - 10 16 16 I 16 I 107 3 /8 187 3 /8<br />
0 - 10 16 32 II 32 II 107 3 /8 267 3 /8<br />
0 - 10 16 --- --- 48 III 107 3 /8 347 3 /8<br />
0 - 10 16 --- --- 80 IV 107 3 /8 507 1 /2<br />
0 - 10 20 20 I 20 I 134 3/8 233 3/8<br />
0 - 10 20 40 II 40 II 134 3 /8 333 3 /8<br />
0 - 10 20 --- --- 60 III 134 3/8 433 3/8<br />
0 - 10 20 --- --- 80 IV 134 3 /8 533 1 /2<br />
0 - 10 24 24 I 24 I 160 3 /8 280 3 /8<br />
0 - 10 24 --- --- 48 III 160 3/8 400 3/8<br />
0 - 10 24 --- --- 72 IV 160 3 /8 520 3 /8<br />
* See note 2 on page 17.<br />
See page 145 for footnotes.<br />
COOPER B-<strong>Line</strong><br />
509 West Monroe Street<br />
Highland, Illinois 62249<br />
Phone: 800-851-7415<br />
Fax: 618-654-1917<br />
Date:<br />
Page No.<br />
Sheet Number:<br />
6 - 2 - 06<br />
139<br />
of<br />
Raafat S. Aboulhosn<br />
Structural Engineer S 3913