Another important milestone will be reached at the end of 2009, when <strong>SKB</strong> proposes the<br />

qualification sequence. <strong>SKB</strong>’s main line is that a qualification body should carry out the<br />

qualifications. To prepare this point, <strong>SKB</strong> has initiated a project together with SQC to adapt the<br />

prevailing qualification process to obtain a relevant qualification programme for the fabrication<br />

and encapsulation processes. An important prerequisite for the programme to be implemented<br />

is that the qualification body is approved by SKI. The qualification body must therefore acquire<br />

expertise and the necessary instructions. SQC has been assigned the task of developing a<br />

programme for the necessary preparations.<br />

<strong>SKB</strong> also concurs with the authorities’ viewpoint that it is important to guarantee that the reliability<br />

of the NDT methods meets the requirements at an early stage in order to avoid complications<br />

in the encapsulation plant. We have therefore initiated a programme for determining these<br />

requirements. In the first part of the programme, the NDT processes that have been developed at<br />

the Canister Laboratory and that are planned to be used for inspection of the sealing process are<br />

being evaluated. The programme is being carried out in cooperation with external expertise at<br />

BAM, Bundesanstalt für Materialforschung und -prüfung in Berlin, and is presented in section<br />

6.4.<br />

<strong>Programme</strong><br />

A report that describes the programme for qualification of NDT methods will be issued. Based<br />

on a general structure (see Figure 7-2), the milestones in the project will be defined and requisite<br />

activities described. According to plans, the report will be completed during <strong>2004</strong>. A status<br />

report will be submitted at the time of the application.<br />

The reliability study for nondestructive testing of the sealing weld will, according to plans, be<br />

completed during 2005. Reports describing execution, results and conclusions will be published.<br />

A summarizing report will be issued no later than at the time of the application.<br />

RD&D-<strong>Programme</strong> <strong>2004</strong> 91