Time horizon 2017<br />

The current phase in the implementation of encapsulation is dominated by development and<br />

testing of technology and processes, which will gradually phase into qualification of established<br />

systems and procedures. Within a time horizon of 2017, the programme will also undergo<br />

design, construction and commissioning phases, after which an operating phase will commence<br />

in 2017. Figure 7 shows an implementation plan for encapsulation, up to the start of operation.<br />

Encapsulation<br />

2003 <strong>2004</strong> 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018<br />

Encapsulation plant<br />

Layout D<br />

Main documents<br />

Design basis<br />

Documentation<br />

PSR<br />

Construction<br />

Rock works<br />

SSR<br />

Buildings, installations, process equipment<br />

Commissioning<br />

Components, systems, trial operation<br />

Consultations, EIA<br />

Early<br />

Extended, EIA<br />

System analyses<br />

Sysdjup<br />

Sysinka<br />

Safety assessments<br />

SR-Site<br />

SR-Can<br />

Canister development<br />

Sealing welding EBW and FSW<br />

Verification and demo<br />

Sealing welding chosen method<br />

Training of personnel<br />

Sealing<br />

Fabrication methods<br />

Fabrication technology<br />

Development of methods<br />

and design<br />

Production system<br />

– canisters<br />

Fabrication of canisters<br />

according to verified method<br />

Fabrication of inserts<br />

and copper tubes<br />

Qualification<br />

<strong>Programme</strong> – NDT, fabrication<br />

methods<br />

Preparations for<br />

qualification<br />

Procedures for<br />

qualification<br />

Genomförande<br />

Canister factory<br />

Siting, design Construction, installations Commissioning<br />

Milestones<br />

Permit application<br />

encapsulation<br />

plant<br />

Permit<br />

encapsulation<br />

plant<br />

Operating licence<br />

application<br />

Initial operation<br />

Operating<br />

licence<br />

2003 <strong>2004</strong> 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018<br />

Figure 7. Plan for encapsulation, 2003–2018.<br />

RD&D-<strong>Programme</strong> <strong>2004</strong> 377