een specified yet. Since the size of the harbours and the needs of the transportation system will<br />

not be different than they are today, m/s Sigyn can, in terms of size and characteristics, be used<br />

for the time being as a point of departure in the planning of the shipments to the deep repository<br />

as well, assuming the latter is located in Forsmark.<br />

The terminal vehicles will eventually have to be replaced as well for reasons of age. Old and<br />

new vehicles will be able to work side by side during a transition period.<br />

Any proposed changes in cargo handling will first be studied to make sure that today’s<br />

shipments can also be performed.<br />

9.5.2 Equipment for canister transport<br />

A transport cask for canisters is being designed, see section 9.3.3. Transport frames that can<br />

be handled in the encapsulation plant and in the deep repository, as well as together with the<br />

transportation system’s vehicles and ship, are needed for the new transport casks. The transport<br />

frames will be designed together with the casks.<br />

The planning of shipments to the deep repository is being coordinated with the encapsulation<br />

plant and with the deep repository project, above all when it comes to the equipment for<br />

handling canister transport casks and associated transport equipment.<br />

In addition to technical data concerning size, weight, design of transport frame and the like,<br />

such questions as maintenance of casks, temporary storage of empty or full casks and other<br />

logistics questions for the canister transport casks must be dealt with jointly.<br />

9.5.3 Accounts<br />

A relatively comprehensive account of canister transport forms a part of the account of the deep<br />

repository and will be included in the permit application for the deep repository. A status report<br />

will be included as supporting material with the permit application for the encapsulation plant.<br />

The material will be produced gradually. However, there will not be any extensive investigations,<br />

since a functioning transportation system has been in operation for a long time. The<br />

changes in <strong>SKB</strong>’s transportation system that will be made up to the time the deep repository is<br />

taken into operation will for the most part be such changes that would have been made anyway<br />

due to the need for modernization and new regulations, agreements or the like.<br />