81 33. Repayment of advance payment for mobilization and equipment: [C1.51.31 The advance loan shall be repaid with percentage deductions from tfre interim payments certified by the Engineer under the Contract. Deductions shall commence in the next Interim Payment Certificate following that in which the total of all such payments to the Contractor has reached not less Iharl 2A per cent of the Contract Price m 6 (Six) montls from thf, date of payment of first instalknent of advance, whichever period concludes earlier, and shall be made at the rate of 2O per cent of the amounts of a-11 Interim Payment Certificates until such time as the loan has been repaid, always provided that the loan shali be completely repaid prior to the expiry of the original time for completion pursuant to Clauses 17 and 28. 34. Repayment of secured advance: [C1.51.4] The advance shall be repaid from each succeeding monthly payments to the extent materials [for which advance was previously paid pursuant to Clause 51.4 of G.C.C.] have been incorporated into the Works. 35. The Securities shall be for the following minimum amounts equivalent as a [C1.52] percentage of the Contract Price: Performance Security for 5 per cent of contract price plus Rs..."""....... (to be decided after evaluation of the bid) as additional security in terms of ITB Clause 29.5. The standard form of 'Performalce Security acceptable to the Employer shall be an unconditional Balk Guarantee of the tlpe as presented in Section 8 of the Bidding Documents. 36. The Schedule of Operating and Maintenance Manuals a-fter 1O6 months of [C1.58] date ofacceptance 37 " The date by which "as-built" drawings (in scale as directed) in 2 sets are [C1.58] required is within 28 days of issue of certifrcate of completion of whole or section of the work. as the case mav be. 38. The amount to be withheld for failing to supply "as built" drawings by the [Cl.58l date required is Rs" O.5 Lakhs. 39. The following events shall also be fundamental breach of contract: [C1.59.21 "The Contractor has contravened Sub-clause 7.1 and Clause 9 of GCC." 40. The percentage to apply to the value of the work not completed representing [3,C1.60] the Employer's additional cost for completing the Works shall be 2O per cent. ! C=O g\,J=-O D:O

82 SECTION 5 TDCIINICAL SPECIFICATIONS {. --

81<br />

33. Repayment of advance payment for mobiliz<strong>at</strong>ion and equipment: [C1.51.31<br />

The advance loan shall be repaid with percentage deductions from tfre<br />

interim payments certified by the Engineer under the Contract. Deductions<br />

shall commence in the next Interim Payment Certific<strong>at</strong>e following th<strong>at</strong> in<br />

which the total of all such payments to the Contractor has reached not less<br />

Iharl 2A per cent of the Contract Price m 6 (Six) montls from thf, d<strong>at</strong>e of<br />

payment of first instalknent of advance, whichever period concludes earlier,<br />

and shall be made <strong>at</strong> the r<strong>at</strong>e of 2O per cent of the amounts of a-11 Interim<br />

Payment Certific<strong>at</strong>es until such time as the loan has been repaid, always<br />

provided th<strong>at</strong> the loan shali be completely repaid prior to the expiry of the<br />

original time for completion pursuant to Clauses 17 and 28.<br />

34. Repayment of secured advance: [C1.51.4]<br />

The advance shall be repaid from each succeeding monthly payments to the<br />

extent m<strong>at</strong>erials [for which advance was previously paid pursuant to Clause<br />

51.4 of G.C.C.] have been incorpor<strong>at</strong>ed into the Works.<br />

35. The Securities shall be for the following minimum amounts equivalent as a [C1.52]<br />

percentage of the Contract Price:<br />

Performance Security for 5 per cent of contract price plus<br />

Rs..."""....... (to be decided after evalu<strong>at</strong>ion of the bid) as<br />

additional security in terms of ITB Clause 29.5.<br />

The standard form of 'Performalce Security acceptable to the Employer shall<br />

be an unconditional Balk Guarantee of the tlpe as presented in Section 8 of<br />

the Bidding Documents.<br />

36. The Schedule of Oper<strong>at</strong>ing and Maintenance Manuals a-fter 1O6 months of [C1.58]<br />

d<strong>at</strong>e ofacceptance<br />

37 " The d<strong>at</strong>e by which "as-built" drawings (in scale as directed) in 2 sets are [C1.58]<br />

required is within 28 days of issue of certifrc<strong>at</strong>e of completion of whole or<br />

section of the work. as the case mav be.<br />

38. The amount to be withheld for failing to supply "as built" drawings by the [Cl.58l<br />

d<strong>at</strong>e required is Rs" O.5 Lakhs.<br />

39. The following events shall also be fundamental breach of contract: [C1.59.21<br />

"The Contractor has contravened Sub-clause 7.1 and Clause 9 of GCC."<br />

40. The percentage to apply to the value of the work not completed representing [3,C1.60]<br />

the Employer's additional cost for completing the Works shall be 2O per cent.<br />

!<br />