C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang) C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
81 33. Repayment of advance payment for mobilization and equipment: [C1.51.31 The advance loan shall be repaid with percentage deductions from tfre interim payments certified by the Engineer under the Contract. Deductions shall commence in the next Interim Payment Certificate following that in which the total of all such payments to the Contractor has reached not less Iharl 2A per cent of the Contract Price m 6 (Six) montls from thf, date of payment of first instalknent of advance, whichever period concludes earlier, and shall be made at the rate of 2O per cent of the amounts of a-11 Interim Payment Certificates until such time as the loan has been repaid, always provided that the loan shali be completely repaid prior to the expiry of the original time for completion pursuant to Clauses 17 and 28. 34. Repayment of secured advance: [C1.51.4] The advance shall be repaid from each succeeding monthly payments to the extent materials [for which advance was previously paid pursuant to Clause 51.4 of G.C.C.] have been incorporated into the Works. 35. The Securities shall be for the following minimum amounts equivalent as a [C1.52] percentage of the Contract Price: Performance Security for 5 per cent of contract price plus Rs..."""....... (to be decided after evaluation of the bid) as additional security in terms of ITB Clause 29.5. The standard form of 'Performalce Security acceptable to the Employer shall be an unconditional Balk Guarantee of the tlpe as presented in Section 8 of the Bidding Documents. 36. The Schedule of Operating and Maintenance Manuals a-fter 1O6 months of [C1.58] date ofacceptance 37 " The date by which "as-built" drawings (in scale as directed) in 2 sets are [C1.58] required is within 28 days of issue of certifrcate of completion of whole or section of the work. as the case mav be. 38. The amount to be withheld for failing to supply "as built" drawings by the [Cl.58l date required is Rs" O.5 Lakhs. 39. The following events shall also be fundamental breach of contract: [C1.59.21 "The Contractor has contravened Sub-clause 7.1 and Clause 9 of GCC." 40. The percentage to apply to the value of the work not completed representing [3,C1.60] the Employer's additional cost for completing the Works shall be 2O per cent. ! C=O g\,J=-O D:O
82 SECTION 5 TDCIINICAL SPECIFICATIONS {. --
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35 and 36: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 37 and 38: 36 #I.3-2. Quantities of work execu
- Page 39 and 40: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 41 and 42: gr,tzo DzO L=4 40 SAMPLE FORMAT FOR
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57 and 58: 38.2 The Engineer shal1 not adjust
- Page 59 and 60: 58 (d)TheEngineerinstructstheContra
- Page 61 and 62: DJc JzC 60 49.2. 49.3. If the Inten
- Page 63 and 64: g>t^l: O t> =O 58. 58.1 scope gf th
- Page 65 and 66: D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68: 66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70: ig (c) If one of the parties faiis
- Page 71 and 72: 70 Commissioner, Government of Arun
- Page 73 and 74: 72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75 and 76: 74 (Al Road Works Clause Rederemc w
- Page 77 and 78: t) Clause Reference @-to section 3
- Page 79 and 80: C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81: ii. Equipment 80 9Ao/o fot rler.i.'
- Page 85 and 86: 84 lrt f)\uffir'\ I V IV V Cr o eul
- Page 87 and 88: c,=.b outzg D=o Do 86 llrr A /l tl
- Page 89 and 90: c>b P>0 f=P 88 6. We accept the app
- Page 91 and 92: Ca o g t^}"-o D=0 I=a 90 ,j,',
- Page 93 and 94: 9'2 (,)lnfrw l0 ))" V I I CtA gr,Ie
- Page 95 and 96: 94 (illnffiw l!)' C-?t] ClvJ:O D=o
- Page 97 and 98: " '14- / :; :,1. : .- . -,' : '-: :
- Page 99 and 100: 98 ^lr( n nfn ll n\ a^ll?,))t)'" |
- Page 101 and 102: 100 This Guarantee will remain in f
- Page 103 and 104: o2 I ṭk= Cac ON:O D :-O IrO A
- Page 105 and 106: 104 I C, >c gt^i+_b D:c D=P
- Page 107 and 108: (s) forthwith replace the sarne wit
- Page 109 and 110: C=r] OWz O D=O ftC; 108 ^flr( aliaf
- Page 111 and 112: c-r-o $$Je s D=O c fr/\ 1 ( _.
- Page 113 and 114: l LZ franW C=O gw=o D:O )=e ; ''/^
- Page 115 and 116: C zb euf >O D=O Ll4 The Common Seal
- Page 117 and 118: lt6 \loffiW C=O OuI+P D=C ft' l 'L
- Page 119 and 120: i18 ^rw glaffiy, C :O P aO \ '1r* L
- Page 121 and 122: 124 ^l1r( 11 r'tffi ll rr) a^llu)u'
- Page 123: t2'2 lln .')alaffiru lT\il&r)>' I L
81<br />
33. Repayment of advance payment for mobiliz<strong>at</strong>ion and equipment: [C1.51.31<br />
The advance loan shall be repaid with percentage deductions from tfre<br />
interim payments certified by the Engineer under the Contract. Deductions<br />
shall commence in the next Interim Payment Certific<strong>at</strong>e following th<strong>at</strong> in<br />
which the total of all such payments to the Contractor has reached not less<br />
Iharl 2A per cent of the Contract Price m 6 (Six) montls from thf, d<strong>at</strong>e of<br />
payment of first instalknent of advance, whichever period concludes earlier,<br />
and shall be made <strong>at</strong> the r<strong>at</strong>e of 2O per cent of the amounts of a-11 Interim<br />
Payment Certific<strong>at</strong>es until such time as the loan has been repaid, always<br />
provided th<strong>at</strong> the loan shali be completely repaid prior to the expiry of the<br />
original time for completion pursuant to Clauses 17 and 28.<br />
34. Repayment of secured advance: [C1.51.4]<br />
The advance shall be repaid from each succeeding monthly payments to the<br />
extent m<strong>at</strong>erials [for which advance was previously paid pursuant to Clause<br />
51.4 of G.C.C.] have been incorpor<strong>at</strong>ed into the Works.<br />
35. The Securities shall be for the following minimum amounts equivalent as a [C1.52]<br />
percentage of the Contract Price:<br />
Performance Security for 5 per cent of contract price plus<br />
Rs..."""....... (to be decided after evalu<strong>at</strong>ion of the bid) as<br />
additional security in terms of ITB Clause 29.5.<br />
The standard form of 'Performalce Security acceptable to the Employer shall<br />
be an unconditional Balk Guarantee of the tlpe as presented in Section 8 of<br />
the Bidding Documents.<br />
36. The Schedule of Oper<strong>at</strong>ing and Maintenance Manuals a-fter 1O6 months of [C1.58]<br />
d<strong>at</strong>e ofacceptance<br />
37 " The d<strong>at</strong>e by which "as-built" drawings (in scale as directed) in 2 sets are [C1.58]<br />
required is within 28 days of issue of certifrc<strong>at</strong>e of completion of whole or<br />
section of the work. as the case mav be.<br />
38. The amount to be withheld for failing to supply "as built" drawings by the [Cl.58l<br />
d<strong>at</strong>e required is Rs" O.5 Lakhs.<br />
39. The following events shall also be fundamental breach of contract: [C1.59.21<br />
"The Contractor has contravened Sub-clause 7.1 and Clause 9 of GCC."<br />
40. The percentage to apply to the value of the work not completed representing [3,C1.60]<br />
the Employer's additional cost for completing the Works shall be 2O per cent.<br />
!<br />
C=O<br />
g\,J=-O D:O