79<br />

Clause Reference<br />

with respect<br />

to section 3<br />

The following percentages will pvern the price adjustment for the entire<br />

contract:<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

Labour - Pi<br />

Cement - P.<br />

<strong>Steel</strong> - P"<br />

ft<br />

Bitumen - P5<br />

L1.<br />

POL - Pr<br />

25 o/o<br />

5 o/o<br />

Lfi- Vo<br />

1 {.'<br />

.' A'<br />

o/o<br />

5 o/o<br />

6<br />

Plant and Machinery Spares - Po<br />

5<br />

o/o<br />

Other M<strong>at</strong>erials - P-<br />

Total<br />

45%<br />

1OO<br />

o/o<br />

27 The proportion of payments retained (retention money) shall be 6%o from each<br />

bill subject to a maximum of 5%o of final contract price.<br />

lc1.48l<br />

28 Amount of liquid<strong>at</strong>ed damages for For Whole of work (1/2OO0) th of the<br />

tC1.49l<br />

-_ delayin comBlefion oT*".k"<br />

'_ --lnitiffirrcrfticqTomded<br />

ofit6:<br />

the nearest Thousand, per day.<br />

29 Maximum limit of liquid<strong>at</strong>ed damages<br />

for delay in completion of work.<br />

30 Amount of Bonus for early completion<br />

of whole of the works<br />

For sectional completion (wherever<br />

specified. in item 6 of Contract D<strong>at</strong>a)<br />

(I I 2OOl th of initia-l contract price for 5<br />

km section, rounded off to the nearest<br />

thousand per day.<br />

1O per cent of the Initial Contract Price<br />

rounded off to the nearest thousand.<br />

I per cent of the Initial Contract Price<br />

(part of a month to be excluded),<br />

rounded off to the nearest thousand.<br />

per month.<br />

[cl'49]<br />

[cl'501<br />

31 Maximum limit of bonus for early<br />

completion of work<br />

6 per cent of the Contract Price<br />

rounded offto the nearest thousand.<br />

lc1.s0l<br />

32 The amounts of the advance Davment are:<br />

Mobiliz<strong>at</strong>ion<br />

L'<br />

\<br />

N<strong>at</strong>ure ofAdvance<br />

{\ ,\<br />

" I fil,u.1<br />

Nf\,\-'-<br />

'{j\1L-<br />

10% of the Contract price<br />

Amount {Rs.)<br />

Conditions to be<br />

fulfilled<br />

On submission of unconditional<br />

Bank<br />

Guarantee. (to be drawn<br />

before the end of 2Ooh of<br />

Contract period). The<br />

contractor may furnish<br />

four bank guarantees of<br />

2.5o/o eac}:r, va-tid for full<br />

period.<br />