7< 16 t7 18 19 20 2l The minimum insuranc€ cover for plryqir-al property, injury anrt death is Rs. 5 lakhs per occurrence with the number of occurences limited to four. After each occurrence, contractor will pay additional premium necessary to make insurance valid for four occurrences always. Siteinvestigation report ; Report on subsoil and design approved by the depar:tment The Site Possession Dates shal be from 2l't day after the date of acceptance Fees and types of reimbursable expenses to be paid to the Dispme Review Expert (To be inserted later) Appoinfing Authority for the Dispute Review Expert -Council, Indian Roads Congress, New Delhi. The period for submission of the programme for approval of Engineer shall be 21 days from the issue of lefter of Acceptance. Clause Reference ' with respect to section 3 lcl.13l lcl.14l lcl.2il lci.2sl [cl.26] IC1.27.rl 2? Tleperiodtretween@-be 9udavs: leIZT:31- 23 The amount to be with held for late submission of an updated programme shall be Rs- 1.SO lakhs. 24 The following events shall also be Compensation Events: Substantially adverse ground conditions encountered during the course of execurion of work not provided for in the bidding document lct.27.3l lcl.44l (i) Rernoval of underground utilities detected subsequently (ii) significant change in classification of soil requiring additional mobilisation by the contractor, e.g. ordinar5r soil to rock excavation, (iii) Removal of unsuitable materia-l like marsh, a.iri" a,rrnp", .rc not caused by the contractor (iv) Artesianconditions (") Seepage, erosion, landslide (vi) (vii) (viii) River training requiring protection of permanent work Presence of historicat, archeological or religious structures, monuments interfering with the works Restriction of access to ground imposed by civil, judicial, or military authority 25 The currency of tie Co.ntract is Indian Rupees. lcri46l 4= o OU: 6 D: Q, '

t) Clause Reference @-to section 3 26 The formula (e) for adjustment of prices are: R=Value of work as defined in Clause 47 .l of Conditions of Contract Adjustment for labour component (i) Price adjustment for increase or decrease in the cost due to Labour shall be paid in accordance with the following formula: Vr_= = 0.85 x Prl100x Rx (L -L-llI-"' lcr.47]l Vl= increase or decrease in the cost of work during the month under consideration due to changes in rates for local labour. L= the consumer price index for industria-l workers for the State on 28 days preceding the date of opening of Bids as published by Labour Bureau, Ministry of Labour, Government of India. L= The consrrmer price index for industrial workers for the State for the undsr consideration as published by Labour Bureau, Ministry of Labour, Government of India. Pr= Percentage of labour component of the work. Adjustment for c.ement component (il) Price adjustment for increase or decrease in the cost of cement procured by the contractor shall be paid in accordance with the following formula: Vc= 0.85 x %/100 x Rx (Cl -Co)|C". V.= increase or decrease in the cost of work during the month under consideration due to changes in rates /orcement. Co= The aIl India whol,esale price index for cement on 28 days preceding the date of opening o/ Bids as published by the Ministry of Industrial Development,- Government of India, New Delhi. Cj= The all India average wholesale price index for cement for the month under consideration as published by Ministry of Industrial Development, Government of India, New Delhi Pc= Percentage of cement component of the work Adjustment for steel component (iii) Price adjustment for increase or decrease in the cost of steel procured by the Contractor shall be paid in accordance with the following formula: V"= 0.85 x P" /100 x Rx (Si-S")/S" V"= Increase or decrease in the cost of work during the month under consideration due to changes in the rates for steel So= The all India wholesale price index for steel (Bars and Rods) on 28 days preceding the date of opening of Bids as published by the Ministry of Industrial Development, Government of India, New Delhi C= C @ul zo D =0 l=o I I f-t'"

t)<br />

Clause Reference<br />

@-to<br />

section 3<br />

26 The formula (e) for adjustment of prices are:<br />

R=Value of work as defined in Clause 47 .l of Conditions of Contract<br />

Adjustment for labour component<br />

(i) Price adjustment for increase or decrease in the cost due to Labour<br />

shall be paid in accordance with the following formula:<br />

Vr_= = 0.85 x Prl100x Rx (L -L-llI-"'<br />

lcr.47]l<br />

Vl= increase or decrease in the cost of work during the month under<br />

consider<strong>at</strong>ion due to changes in r<strong>at</strong>es for local labour.<br />

L= the consumer price index for industria-l workers for the St<strong>at</strong>e on<br />

28 days preceding the d<strong>at</strong>e of opening of Bids as published by<br />

Labour Bureau, Ministry of Labour, G<strong>over</strong>nment of India.<br />

L= The consrrmer price index for industrial workers for the St<strong>at</strong>e for<br />

the undsr consider<strong>at</strong>ion as published by Labour Bureau,<br />

Ministry of Labour, G<strong>over</strong>nment of India.<br />

Pr= Percentage of labour component of the work.<br />

Adjustment<br />

for c.ement component<br />

(il) Price adjustment for increase or decrease in the cost of cement<br />

procured by the contractor shall be paid in accordance with the<br />

following formula:<br />

Vc= 0.85 x %/100 x Rx (Cl -Co)|C".<br />

V.= increase or decrease in the cost of work during the month under<br />

consider<strong>at</strong>ion due to changes in r<strong>at</strong>es /orcement.<br />

Co= The aIl India whol,esale price index for cement on 28 days<br />

preceding the d<strong>at</strong>e of opening o/ Bids as published by the<br />

Ministry of Industrial Development,- G<strong>over</strong>nment of India, New<br />

Delhi.<br />

Cj= The all India average wholesale price index for cement for the<br />

month under consider<strong>at</strong>ion as published by Ministry of<br />

Industrial Development, G<strong>over</strong>nment of India, New Delhi<br />

Pc= Percentage of cement component of the work<br />

Adjustment<br />

for steel component<br />

(iii)<br />

Price adjustment for increase or decrease in the cost of steel procured<br />

by the Contractor shall be paid in accordance with the following<br />

formula:<br />

V"= 0.85 x P" /100 x Rx (Si-S")/S"<br />

V"= Increase or decrease in the cost of work during the month under<br />

consider<strong>at</strong>ion due to changes in the r<strong>at</strong>es for steel<br />

So= The all India wholesale price index for steel (Bars and Rods) on<br />

28 days preceding the d<strong>at</strong>e of opening of Bids as published by<br />

the Ministry of Industrial Development, G<strong>over</strong>nment of India,<br />

New Delhi<br />

C= C @ul zo D =0<br />

l=o<br />

I<br />

I<br />

f-t'"