7< 16 t7 18 19 20 2l The minimum insuranc€ cover for plryqir-al property, injury anrt death is Rs. 5 lakhs per occurrence with the number of occurences limited to four. After each occurrence, contractor will pay additional premium necessary to make insurance valid for four occurrences always. Siteinvestigation report ; Report on subsoil and design approved by the depar:tment The Site Possession Dates shal be from 2l't day after the date of acceptance Fees and types of reimbursable expenses to be paid to the Dispme Review Expert (To be inserted later) Appoinfing Authority for the Dispute Review Expert -Council, Indian Roads Congress, New Delhi. The period for submission of the programme for approval of Engineer shall be 21 days from the issue of lefter of Acceptance. Clause Reference ' with respect to section 3 lcl.13l lcl.14l lcl.2il lci.2sl [cl.26] IC1.27.rl 2? Tleperiodtretween@-be 9udavs: leIZT:31- 23 The amount to be with held for late submission of an updated programme shall be Rs- 1.SO lakhs. 24 The following events shall also be Compensation Events: Substantially adverse ground conditions encountered during the course of execurion of work not provided for in the bidding document lct.27.3l lcl.44l (i) Rernoval of underground utilities detected subsequently (ii) significant change in classification of soil requiring additional mobilisation by the contractor, e.g. ordinar5r soil to rock excavation, (iii) Removal of unsuitable materia-l like marsh, a.iri" a,rrnp", .rc not caused by the contractor (iv) Artesianconditions (") Seepage, erosion, landslide (vi) (vii) (viii) River training requiring protection of permanent work Presence of historicat, archeological or religious structures, monuments interfering with the works Restriction of access to ground imposed by civil, judicial, or military authority 25 The currency of tie Co.ntract is Indian Rupees. lcri46l 4= o OU: 6 D: Q, '
t) Clause Reference @-to section 3 26 The formula (e) for adjustment of prices are: R=Value of work as defined in Clause 47 .l of Conditions of Contract Adjustment for labour component (i) Price adjustment for increase or decrease in the cost due to Labour shall be paid in accordance with the following formula: Vr_= = 0.85 x Prl100x Rx (L -L-llI-"' lcr.47]l Vl= increase or decrease in the cost of work during the month under consideration due to changes in rates for local labour. L= the consumer price index for industria-l workers for the State on 28 days preceding the date of opening of Bids as published by Labour Bureau, Ministry of Labour, Government of India. L= The consrrmer price index for industrial workers for the State for the undsr consideration as published by Labour Bureau, Ministry of Labour, Government of India. Pr= Percentage of labour component of the work. Adjustment for c.ement component (il) Price adjustment for increase or decrease in the cost of cement procured by the contractor shall be paid in accordance with the following formula: Vc= 0.85 x %/100 x Rx (Cl -Co)|C". V.= increase or decrease in the cost of work during the month under consideration due to changes in rates /orcement. Co= The aIl India whol,esale price index for cement on 28 days preceding the date of opening o/ Bids as published by the Ministry of Industrial Development,- Government of India, New Delhi. Cj= The all India average wholesale price index for cement for the month under consideration as published by Ministry of Industrial Development, Government of India, New Delhi Pc= Percentage of cement component of the work Adjustment for steel component (iii) Price adjustment for increase or decrease in the cost of steel procured by the Contractor shall be paid in accordance with the following formula: V"= 0.85 x P" /100 x Rx (Si-S")/S" V"= Increase or decrease in the cost of work during the month under consideration due to changes in the rates for steel So= The all India wholesale price index for steel (Bars and Rods) on 28 days preceding the date of opening of Bids as published by the Ministry of Industrial Development, Government of India, New Delhi C= C @ul zo D =0 l=o I I f-t'"
- Page 25 and 26: AA z- 23.3. zJ.+ 23.5. 3.6. 23.7. '
- Page 27 and 28: o gN:e Dzb Such adjusteC bid price
- Page 29 and 30: z6 36. 36.1. 37. 37 "r" 37.2" Dispu
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35 and 36: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 37 and 38: 36 #I.3-2. Quantities of work execu
- Page 39 and 40: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 41 and 42: gr,tzo DzO L=4 40 SAMPLE FORMAT FOR
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57 and 58: 38.2 The Engineer shal1 not adjust
- Page 59 and 60: 58 (d)TheEngineerinstructstheContra
- Page 61 and 62: DJc JzC 60 49.2. 49.3. If the Inten
- Page 63 and 64: g>t^l: O t> =O 58. 58.1 scope gf th
- Page 65 and 66: D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68: 66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70: ig (c) If one of the parties faiis
- Page 71 and 72: 70 Commissioner, Government of Arun
- Page 73 and 74: 72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75: 74 (Al Road Works Clause Rederemc w
- Page 79 and 80: C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81 and 82: ii. Equipment 80 9Ao/o fot rler.i.'
- Page 83 and 84: 82 SECTION 5 TDCIINICAL SPECIFICATI
- Page 85 and 86: 84 lrt f)\uffir'\ I V IV V Cr o eul
- Page 87 and 88: c,=.b outzg D=o Do 86 llrr A /l tl
- Page 89 and 90: c>b P>0 f=P 88 6. We accept the app
- Page 91 and 92: Ca o g t^}"-o D=0 I=a 90 ,j,',
- Page 93 and 94: 9'2 (,)lnfrw l0 ))" V I I CtA gr,Ie
- Page 95 and 96: 94 (illnffiw l!)' C-?t] ClvJ:O D=o
- Page 97 and 98: " '14- / :; :,1. : .- . -,' : '-: :
- Page 99 and 100: 98 ^lr( n nfn ll n\ a^ll?,))t)'" |
- Page 101 and 102: 100 This Guarantee will remain in f
- Page 103 and 104: o2 I ṭk= Cac ON:O D :-O IrO A
- Page 105 and 106: 104 I C, >c gt^i+_b D:c D=P
- Page 107 and 108: (s) forthwith replace the sarne wit
- Page 109 and 110: C=r] OWz O D=O ftC; 108 ^flr( aliaf
- Page 111 and 112: c-r-o $$Je s D=O c fr/\ 1 ( _.
- Page 113 and 114: l LZ franW C=O gw=o D:O )=e ; ''/^
- Page 115 and 116: C zb euf >O D=O Ll4 The Common Seal
- Page 117 and 118: lt6 \loffiW C=O OuI+P D=C ft' l 'L
- Page 119 and 120: i18 ^rw glaffiy, C :O P aO \ '1r* L
- Page 121 and 122: 124 ^l1r( 11 r'tffi ll rr) a^llu)u'
- Page 123: t2'2 lln .')alaffiru lT\il&r)>' I L
7<<br />
16<br />
t7<br />
18<br />
19<br />
20<br />
2l<br />
The minimum insuranc€ c<strong>over</strong> for plryqir-al property, injury anrt<br />
de<strong>at</strong>h is Rs. 5 lakhs per occurrence with the number of occurences<br />
limited to four. After each occurrence, contractor will pay additional<br />
premium necessary to make insurance valid for four occurrences<br />
always.<br />
Siteinvestig<strong>at</strong>ion report ; Report on subsoil and design approved<br />
by the depar:tment<br />
The Site Possession D<strong>at</strong>es shal be from 2l't day after the d<strong>at</strong>e of<br />
acceptance<br />
Fees and types of reimbursable expenses to be paid to the Dispme<br />
Review Expert<br />
(To be inserted l<strong>at</strong>er)<br />
Appoinfing Authority for the Dispute Review Expert -Council, Indian<br />
Roads Congress, New Delhi.<br />
The period for submission of the programme for approval of<br />
Engineer shall be 21 days from the issue of lefter of Acceptance.<br />
Clause Reference<br />
' with respect to<br />
section 3<br />
lcl.13l<br />
lcl.14l<br />
lcl.2il<br />
lci.2sl<br />
[cl.26]<br />
IC1.27.rl<br />
2? Tleperiodtretween@-be 9udavs: leIZT:31-<br />
23 The amount to be with held for l<strong>at</strong>e submission of an upd<strong>at</strong>ed<br />
programme shall be Rs- 1.SO lakhs.<br />
24 The following events shall also be Compens<strong>at</strong>ion Events:<br />
Substantially adverse ground conditions encountered during the<br />
course of execurion of work not provided for in the bidding<br />
document<br />
lct.27.3l<br />
lcl.44l<br />
(i) Rernoval of underground utilities detected subsequently<br />
(ii) significant change in classific<strong>at</strong>ion of soil requiring additional<br />
mobilis<strong>at</strong>ion by the contractor, e.g. ordinar5r soil to rock<br />
excav<strong>at</strong>ion,<br />
(iii) Removal of unsuitable m<strong>at</strong>eria-l like marsh, a.iri" a,rrnp", .rc<br />
not caused by the contractor<br />
(iv)<br />
Artesianconditions<br />
(") Seepage, erosion, landslide<br />
(vi)<br />
(vii)<br />
(viii)<br />
River training requiring protection of permanent work<br />
Presence of historic<strong>at</strong>, archeological or religious structures,<br />
monuments interfering with the works<br />
Restriction of access to ground imposed by civil, judicial, or<br />
military authority<br />
25 The currency of tie Co.ntract is Indian Rupees.<br />
lcri46l<br />
4= o OU: 6 D: Q,<br />
'